ACQUISITION UPON REQUEST<br />
SCHEDULE 4<br />
SPECIFIC ENVIRONMENTAL CONDITIONS<br />
1. Upon receiving a written request for acquisition from the landowner <strong>of</strong> the land<br />
listed in Table 1, the Applicant shall acquire the land in accordance with the<br />
procedures in conditions 9-11 <strong>of</strong> schedule 5:<br />
2 – Lambkin 23A & B - Kannar<br />
13C - Skinner<br />
31A,B,C & D - Fisher<br />
19A & B – Kelly<br />
22 – Henderson<br />
51 – Hawkes<br />
56 - Haynes<br />
Table 1: Land subject to acquisition upon request<br />
Note: For more information on the numbering and identification <strong>of</strong> properties used<br />
in this consent, see Attachment 1 <strong>of</strong> the EIS for the Wambo <strong>Development</strong> Project.<br />
AIR QUALITY<br />
Impact Assessment Criteria<br />
2. The Applicant shall ensure that the air pollution generated by the development<br />
does not exceed the criteria listed in Tables 2, 3, and 4 at any privately-owned<br />
land.<br />
Pollutant<br />
Averaging<br />
period<br />
Criterion<br />
Total suspended particulate (TSP)<br />
matter<br />
Annual 90 µg/m 3<br />
Particulate matter < 10 µm (PM 10 ) Annual 30 µg/m 3<br />
Table 2: Long term impact assessment criteria for particulate matter<br />
Pollutant<br />
Averaging<br />
period<br />
Criterion<br />
Particulate matter < 10 µm (PM 10 ) 24 hour 50 µg/m 3<br />
Table 3: Short term impact assessment criterion for particulate matter<br />
Pollutant<br />
Averaging<br />
period<br />
Maximum increase in<br />
deposited dust level<br />
Maximum total<br />
deposited dust<br />
level<br />
9