Development Consent - Department of Planning
Development Consent - Department of Planning
Development Consent - Department of Planning
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Parameter Units <strong>of</strong><br />
measure<br />
Averaging<br />
period<br />
Frequenc<br />
y<br />
Temperature @ 2 m K 1 hour Continuou<br />
s<br />
Total Solar Radiation @ W/m 2 1 hour Continuou<br />
10m<br />
s<br />
Wind Direction @ 10 m ° 1 hour Continuou<br />
s<br />
Wind Speed @ 10 m m/s 1 hour Continuou<br />
s<br />
Sampling<br />
method 1<br />
AM-4<br />
AM-4<br />
AM-2<br />
AM-2<br />
Table 11: Meteorological monitoring<br />
1<br />
NSW EPA, 2001, Approved Methods for the Sampling and Analysis <strong>of</strong> Air<br />
Pollutants in NSW.<br />
2 The Applicant shall calculate lapse rate from measurements made at 2m and<br />
10m.<br />
4 BLASTING & VIBRATION<br />
Airblast Overpressure Limits<br />
11. The Applicant shall ensure that the airblast overpressure level from blasting at the<br />
development does not exceed the criteria in Table 12 at any residence on<br />
privately-owned land with the exception <strong>of</strong> property 13c (Skinner) (see condition 20<br />
below).<br />
Airblast overpressure<br />
level (dB(Lin Peak))<br />
115<br />
Allowable exceedance<br />
5% <strong>of</strong> the total number <strong>of</strong> blasts over a period <strong>of</strong> 12<br />
months<br />
120 0%<br />
Table 12: Airblast overpressure impact assessment criteria<br />
Ground Vibration Impact Assessment Criteria<br />
12. The Applicant shall ensure that the ground vibration level from blasting at the<br />
development does not exceed the criteria in Table 13 at any residence on<br />
privately-owned land with the exception <strong>of</strong> property 13c (Skinner) (see condition 20<br />
below).<br />
Peak particle velocity<br />
(mm/s)<br />
5<br />
Allowable exceedance<br />
5% <strong>of</strong> the total number <strong>of</strong> blasts over a period <strong>of</strong> 12<br />
months<br />
10 0%<br />
Table 13: Ground vibration impact assessment criteria<br />
4<br />
Incoporates DEC GTA<br />
14