Parameter Units <strong>of</strong><br />

measure<br />

Averaging<br />

period<br />

Frequenc<br />

y<br />

Temperature @ 2 m K 1 hour Continuou<br />

s<br />

Total Solar Radiation @ W/m 2 1 hour Continuou<br />

10m<br />

s<br />

Wind Direction @ 10 m ° 1 hour Continuou<br />

s<br />

Wind Speed @ 10 m m/s 1 hour Continuou<br />

s<br />

Sampling<br />

method 1<br />

AM-4<br />

AM-4<br />

AM-2<br />

AM-2<br />

Table 11: Meteorological monitoring<br />

1<br />

NSW EPA, 2001, Approved Methods for the Sampling and Analysis <strong>of</strong> Air<br />

Pollutants in NSW.<br />

2 The Applicant shall calculate lapse rate from measurements made at 2m and<br />

10m.<br />

4 BLASTING & VIBRATION<br />

Airblast Overpressure Limits<br />

11. The Applicant shall ensure that the airblast overpressure level from blasting at the<br />

development does not exceed the criteria in Table 12 at any residence on<br />

privately-owned land with the exception <strong>of</strong> property 13c (Skinner) (see condition 20<br />

below).<br />

Airblast overpressure<br />

level (dB(Lin Peak))<br />

115<br />

Allowable exceedance<br />

5% <strong>of</strong> the total number <strong>of</strong> blasts over a period <strong>of</strong> 12<br />

months<br />

120 0%<br />

Table 12: Airblast overpressure impact assessment criteria<br />

Ground Vibration Impact Assessment Criteria<br />

12. The Applicant shall ensure that the ground vibration level from blasting at the<br />

development does not exceed the criteria in Table 13 at any residence on<br />

privately-owned land with the exception <strong>of</strong> property 13c (Skinner) (see condition 20<br />

below).<br />

Peak particle velocity<br />

(mm/s)<br />

5<br />

Allowable exceedance<br />

5% <strong>of</strong> the total number <strong>of</strong> blasts over a period <strong>of</strong> 12<br />

months<br />

10 0%<br />

Table 13: Ground vibration impact assessment criteria<br />

4<br />

Incoporates DEC GTA<br />

14