25.05.2014 Views

Development Consent - Department of Planning

Development Consent - Department of Planning

Development Consent - Department of Planning

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Land Acquisition Criteria<br />

7. If the noise generated by the development exceeds the criteria in Table 10, the<br />

Applicant shall, upon receiving a written request for acquisition from the landowner,<br />

acquire the land in accordance with the procedures in conditions 9-11 <strong>of</strong> schedule<br />

5.<br />

Day/Evening/Night<br />

L Aeq(15 minute)<br />

Property<br />

43<br />

94 - Curlewis<br />

23C – Kannar<br />

254A - Algie<br />

40 All other residential or sensitive receptor,<br />

excluding the receptors listed in condition<br />

1 above<br />

Table 10: Land acquisition criteria dB(A)<br />

Note: Noise generated by the development is to be measured in accordance with<br />

the notes presented below Table 9 above.<br />

Monitoring<br />

8. The Applicant shall conduct real-time monitoring <strong>of</strong> the noise generated by the<br />

development at a minimum <strong>of</strong> four properties to the south and north-west <strong>of</strong> the<br />

site, in general accordance with the NSW Industrial Noise Policy and AS1055-<br />

1997: Acoustics – Description and Measurement <strong>of</strong> Environmental.<br />

9. Before carrying out any development, the Applicant shall prepare a Noise<br />

Monitoring Program to the satisfaction <strong>of</strong> the Director-General, which includes a<br />

noise monitoring protocol for evaluating compliance with the criteria in tables 9 &<br />

10.<br />

3 METEOROLOGICAL MONITORING<br />

10. The Applicant shall establish a permanent meteorological station at a location<br />

approved by the DEC, and to the satisfaction <strong>of</strong> the Director-General, to monitor<br />

the parameters specified in Table 11, using the specified units <strong>of</strong> measure,<br />

averaging period, frequency, and sampling method in the table.<br />

Parameter Units <strong>of</strong><br />

measure<br />

Averaging<br />

period<br />

Frequenc<br />

y<br />

Sampling<br />

method 1<br />

Lapse rate ºC/100m 1 hour Continuou Note 2<br />

s<br />

Rainfall mm/hr 1 hour Continuou AM-4<br />

s<br />

Sigma Theta @ 10 m ° 1 hour Continuou AM-2<br />

s<br />

Siting - - - AM-1<br />

Temperature @ 10 m K 1 hour Continuou<br />

s<br />

AM-4<br />

3<br />

Incorporates DEC GTA<br />

13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!