Development Consent - Department of Planning
Development Consent - Department of Planning
Development Consent - Department of Planning
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Note: Deposited dust is assessed as insoluble solids as defined by Standards<br />
Australia, 1991, AS 3580.10.1-1991: Methods for Sampling and Analysis <strong>of</strong><br />
Ambient Air - Determination <strong>of</strong> Particulates - Deposited Matter - Gravimetric<br />
Method.<br />
1 Monitoring<br />
4. The Applicant shall establish air quality monitoring stations at a minimum <strong>of</strong> 4<br />
locations around the site, including the residences on properties 40 (Muller) and<br />
125 (Barry) whilst privately-owned, to monitor (by sampling and obtaining results<br />
by analysis) the concentration <strong>of</strong> each pollutant in Table 8 to the satisfaction <strong>of</strong><br />
DEC and the Director-General, using the specified averaging period, frequency,<br />
and sampling method:<br />
Pollutant Units <strong>of</strong> Averaging Frequency Sampling method 1<br />
Measure Period<br />
PM 10 µg/m³ 24 hour, Continuous AS3580.9.8 – 2001 2<br />
annual<br />
TSP µg/m 3 24 hour, 1 day in 6 AM-15<br />
annual<br />
Dust Deposition g/m²/month Month, annual Continuous AM-19<br />
Siting - - - AM-1<br />
Table 8: Air quality monitoring<br />
1<br />
NSW EPA, 2001, Approved Methods for the Sampling and Analysis <strong>of</strong> Air<br />
Pollutants in NSW.<br />
2 Standards Australia, 2001, AS3580.9.8-2002, Method for Sampling and Analysis<br />
<strong>of</strong> Ambient Air - Determination <strong>of</strong> Suspended Particulate Matter - PM 10 Continuous<br />
Direct Mass Method using a Tapered Element Oscillating Microbalance Analyser,<br />
or any other method that is approved by the DEC and the Director-General.<br />
5. Before carrying out any development, the Applicant shall prepare an Air Quality<br />
Monitoring Program, in consultation with DEC, and to the satisfaction <strong>of</strong> the<br />
Director-General.<br />
2 NOISE<br />
Noise Impact Assessment Criteria<br />
6. The Applicant shall ensure that the noise generated by the development does not<br />
exceed the noise impact assessment criteria presented in Table 9.<br />
Day<br />
L Aeq(15 minute)<br />
Evening/Ni<br />
ght<br />
L Aeq(15 minute)<br />
Night<br />
L A1(1 minute)<br />
Land Number<br />
35 41 50 94 – Curlewis<br />
3 – Birrell<br />
4B – Circosta<br />
15B - McGowen/Caslick<br />
16 – Cooper<br />
23C – Kannar<br />
1<br />
Incorporates DEC GTA<br />
2<br />
Incorporates DEC GTAs<br />
11