25.05.2014 Views

Appendix P Drainage, Flooding, Stormwater Management Part 5

Appendix P Drainage, Flooding, Stormwater Management Part 5

Appendix P Drainage, Flooding, Stormwater Management Part 5

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Flooding</strong>, <strong>Drainage</strong> and <strong>Stormwater</strong> <strong>Management</strong><br />

Sanctuary Villages<br />

A summary of existing peak discharges at Millfield Bridge (node CON.15) for the 1, 5, 10,<br />

20, 50 and 100 year ARI storm events is provided in Table 3-2. Also provided are peak<br />

discharge estimates documented in the Patterson Britton and <strong>Part</strong>ners (PBP) flood study<br />

(April 2004) at the same location. The critical storm duration that produced the peak<br />

discharge for all events except the 1 year ARI event was the 2160 minute storm. The<br />

peak discharge for the 1 year ARI event occurred for the 720 minute storm.<br />

Estimated hydrographs at Millfield Bridge (node CON.15) for the 1, 5, 10, 20, 50 and 100<br />

year ARI critical duration storm event are provided in <strong>Appendix</strong> D.<br />

800<br />

4,000<br />

700<br />

3,500<br />

600<br />

3,000<br />

Discharge (m 3 /s)<br />

500<br />

400<br />

300<br />

2,500<br />

2,000<br />

1,500<br />

Storage (ML)<br />

200<br />

1,000<br />

100<br />

500<br />

0<br />

0<br />

110.5 111 111.5 112 112.5 113 113.5 114<br />

Height (m AHD)<br />

PB H-Q Relationship PBP H-Q Relationship PB H-S Relationship PBP H-S Relationship<br />

Figure 4:<br />

Height-Storage-Discharge Relationship for Ellalong Lagoon<br />

Table 3-2:<br />

Existing peak discharges at Millfield Bridge (Node CON.15)<br />

ARI<br />

Existing Peak<br />

Discharge (m 3 /s)<br />

Critical Storm<br />

Duration (min)<br />

PBP Peak Discharge<br />

Estimate (m 3 /s)^<br />

1 Year 62 720 -<br />

5 Year 221 2160 255<br />

10 Year 296 2160 -<br />

20 Year 392 2160 434<br />

50 Year 571 2160 -<br />

100 Year 762 2160 654<br />

^ PBP peak discharge estimate has been provided for comparative purposes only.<br />

PARSONS BRINCKERHOFF 2122870A-PR0116 Page 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!