25.05.2014 Views

Presentation 406 - International Planetary Probe Workshop

Presentation 406 - International Planetary Probe Workshop

Presentation 406 - International Planetary Probe Workshop

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MSL Heatshield Layout<br />

• 27 different tile drawings for 113 tiles<br />

-135 Transition Tile<br />

-134 Transition Tile<br />

Mars Science Laboratory<br />

-136 Shoulder Tile<br />

-131<br />

-125<br />

-104 -106<br />

-115<br />

-133 -123<br />

-127<br />

-103<br />

-121 -142 -141<br />

-105<br />

-111<br />

-114<br />

-107 -112<br />

Flow<br />

-132<br />

-126<br />

-122<br />

-108<br />

-113<br />

-128<br />

-124<br />

+Y<br />

+X<br />

• 19 PICA lots (114 billets) of PICA were manufactured for MSL testing,<br />

development, and production with lot acceptance testing performed on<br />

every billet<br />

From R.A.S. Beck, D.M. Driver, M.J. Wright, B. Laub, H.H. Hwang, E.M. Slimko, K.T. Edquist, S.A. Sepka, W.H.<br />

Willcockson, and T.D. Thames, “Development of the Mars Science Laboratory Heatshield Thermal Protection<br />

System,” AIAA 2009-4229.<br />

June 16, 2010 7 th <strong>International</strong> <strong>Planetary</strong> <strong>Probe</strong> <strong>Workshop</strong> (IPPW7) HHH-17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!