Forthbank Wind Energy Development - Partnerships for Renewables
Forthbank Wind Energy Development - Partnerships for Renewables
Forthbank Wind Energy Development - Partnerships for Renewables
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
North<br />
<strong>Forthbank</strong><br />
East<br />
Drawing ref: W:\1871SAE - DP2 - <strong>Forthbank</strong> Feasibilty Studies\Technical\Graphics\Landscape visuals\1871 A3 VP photomontage sheets.indd<br />
Proposed <strong>Forthbank</strong><br />
Develoment<br />
Installed Approved Application Scoping<br />
Horizontal eld of view: 90° Viewpoint Location (OS grid ref): 292005, 687191<br />
Distance to nearest turbine: 4.15km Approximate viewing distance: 25cm @ A3<br />
Notes: Numbers in brackets indicate the reference number used in cumulative diagrams ( gures 9.13 / 9.14).<br />
The wireframes are generated from a view height of 1.7m (except in cases where view is taken from a greater height due to a man made construction eg. upper oor of a building, manmade<br />
embankment etc) above a bare ground terrain model derived from OS Panorama DTM data, and adjusted <strong>for</strong> the earth’s curvature.<br />
<strong>Forthbank</strong> <strong>Wind</strong> <strong>Energy</strong> <strong>Development</strong><br />
Viewpoint 20 | Clackmannanshire Bridge<br />
Cumulative View - North / East<br />
Figure No: CW 9.20a<br />
www.rpsgroup.com