20.05.2014 Views

Forthbank Wind Energy Development - Partnerships for Renewables

Forthbank Wind Energy Development - Partnerships for Renewables

Forthbank Wind Energy Development - Partnerships for Renewables

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

North<br />

Braes of Doune (1)<br />

East<br />

FMC technologies (15)<br />

Drawing ref: W:\1871SAE - DP2 - <strong>Forthbank</strong> Feasibilty Studies\Technical\Graphics\Landscape visuals\1871 A3 VP photomontage sheets.indd<br />

Proposed <strong>Forthbank</strong><br />

Develoment<br />

Installed Approved Application Scoping<br />

Horizontal eld of view: 90° Viewpoint Location (OS grid ref): 283569, 697669<br />

Distance to nearest turbine: 8.16km Approximate viewing distance: 25cm @ A3<br />

Notes: Numbers in brackets indicate the reference number used in cumulative diagrams ( gures 9.13 / 9.14).<br />

The wireframes are generated from a view height of 1.7m (except in cases where view is taken from a greater height due to a man made construction eg. upper oor of a building, manmade<br />

embankment etc) above a bare ground terrain model derived from OS Panorama DTM data, and adjusted <strong>for</strong> the earth’s curvature.<br />

<strong>Forthbank</strong> <strong>Wind</strong> <strong>Energy</strong> <strong>Development</strong><br />

Viewpoint 16 | Dumyat<br />

Cumulative View - North / East<br />

Figure No: CW 9.16a<br />

www.rpsgroup.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!