20.05.2014 Views

Forthbank Wind Energy Development - Partnerships for Renewables

Forthbank Wind Energy Development - Partnerships for Renewables

Forthbank Wind Energy Development - Partnerships for Renewables

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

South<br />

Asda Depot (5)<br />

Rosehill (25) Pates Hill (11) Tormywheel (12) Burnhead (29)<br />

Bracco (19) Greendykeside (3)<br />

Greengairs (20)<br />

Rullie (24)<br />

Muirpark (16)<br />

Black Law Phase II (17)<br />

Craigannet (26)<br />

Torwood (30) / Callendar Estate (28)<br />

Craigengelt (7)<br />

West<br />

Earlsburn (4)<br />

Drawing ref: W:\1871SAE - DP2 - <strong>Forthbank</strong> Feasibilty Studies\Technical\Graphics\Landscape visuals\1871 A3 VP photomontage sheets.indd<br />

Earlsburn North (13)<br />

Proposed <strong>Forthbank</strong><br />

Develoment<br />

Installed Approved Application Scoping<br />

Horizontal eld of view: 90° Viewpoint Location (OS grid ref): 280925, 695664<br />

Distance to nearest turbine: 8.99km Approximate viewing distance: 25cm @ A3<br />

Notes: Numbers in brackets indicate the reference number used in cumulative diagrams ( gures 9.13 / 9.14).<br />

The wireframes are generated from a view height of 1.7m (except in cases where view is taken from a greater height due to a man made construction eg. upper oor of a building, manmade<br />

embankment etc) above a bare ground terrain model derived from OS Panorama DTM data, and adjusted <strong>for</strong> the earth’s curvature.<br />

<strong>Forthbank</strong> <strong>Wind</strong> <strong>Energy</strong> <strong>Development</strong><br />

Viewpoint 5 | Wallace Monument<br />

Cumulative View - South / West<br />

Figure No: CW 9.5b<br />

www.rpsgroup.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!