20.05.2014 Views

Planning Supporting Statement - Partnerships for Renewables

Planning Supporting Statement - Partnerships for Renewables

Planning Supporting Statement - Partnerships for Renewables

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Louth Canal Wind Energy Development<br />

Environmental <strong>Statement</strong> (ES)<br />

1.3.3 Having regard to the Town and Country <strong>Planning</strong> (Environmental Impact Assessment) (EIA)<br />

(England and Wales) Regulations, 1999 (as amended) and in consultation with ELDC, the<br />

applicant has prepared an Environmental <strong>Statement</strong> (ES) to accompany the planning<br />

application. The scope of the ES has been agreed with ELDC though the <strong>for</strong>mal Scoping<br />

process prior to submission, and responds to pre-application consultation carried out with the<br />

LPA, statutory and non-statutory consultees.<br />

1.3.4 The ES comprises four separately bound parts:<br />

Non-Technical Summary – summarising the key findings of the EIA in non-technical<br />

language<br />

Volume 1: Written <strong>Statement</strong> – reporting the findings of the EIA<br />

Volume 2: Figures –to accompany the text of Volume 1<br />

Volume 3: Appendices – additional technical material to support the text in Volume 1<br />

<strong>Statement</strong> of Community Involvement (SCI)<br />

1.3.5 A <strong>Statement</strong> of Community Involvement (SCI) has been prepared which records the preapplication<br />

consultation undertaken with the ELDC, members of the public and interested<br />

groups. This consultation included public exhibitions and letters to local MP‟s, Councillors and<br />

Parish Councils. The consultation undertaken has been in<strong>for</strong>med by the East Lindsey<br />

<strong>Statement</strong> of Community Involvement.<br />

Accompanying Drawings<br />

1.3.6 The following drawings have been submitted to accompany the planning application: – these<br />

are all plans that will be submitted:<br />

Figure 1: <strong>Planning</strong> application red line boundary;<br />

Figure 2: Site Infrastructure;<br />

Figure 3: Structure of a typical wind turbine;<br />

Figure 4: External Trans<strong>for</strong>mer Housing;<br />

Figure 5: Typical Cable Trench Detail;<br />

Figure 6: Typical Control/Substation Building;<br />

Figure 7: Typical Turbine Foundation;<br />

Figure 8: Typical Crane Hardstanding;<br />

Figure 9: Typical site track design details (cross-section);<br />

Figure 10: Outline access design into flood embankment;<br />

Figure 11: Typical culvert;<br />

Figure 12: Typical Temporary Construction Compound; and<br />

Figure 13: Meteorological Mast.<br />

March 2012 2 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!