Louth Canal Wind Energy Development<br />

<strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

March 2012


Louth Canal Wind Energy Development<br />

PFR (Louth Canal) Limited<br />

Louth Canal Wind Energy Development<br />

<strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Station House | 12 Melcombe Place | London | NW1 6JJ<br />

t: +44 (0)207 170 7000 | f: +44 (0)207 170 7020 | e: info@pfr.co.uk<br />

http://www.pfr.co.uk/louthcanal<br />

Partnership <strong>for</strong> <strong>Renewables</strong> is a private limited company | Registered in England and Wales, number<br />

06526742<br />

Registered at Registered at 6th Floor, 5 New Street Square, London EC4A 3BF<br />

March 2012<br />

i<br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

Contents<br />

1 Introduction ................................................................................... 1<br />

2 Site Context ................................................................................... 3<br />

3 Development Proposals ................................................................ 4<br />

4 UK Commitment to Tackling Climate Change ............................ 7<br />

5 National <strong>Planning</strong> Policy ............................................................. 12<br />

6 The Development Plan ................................................................ 18<br />

7 Appraisal of the Proposed Development .................................. 23<br />

8 Conclusions ................................................................................. 31<br />

March 2012<br />

ii<br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

1 Introduction<br />

1.1 Overview<br />

1.1.1 This <strong>Planning</strong> <strong>Statement</strong> has been prepared in support of a full planning application to East<br />

Lindsey District Council (ELDC) <strong>for</strong> the erection of three wind turbines with a maximum tip<br />

height of 113.5m at land east of Louth Canal, Lincolnshire by the Partnership <strong>for</strong> Renewable<br />

Development Company Ltd (PfR).<br />

1.1.2 PfR was established to facilitate renewable energy projects on land controlled by public sector<br />

bodies, and has set up PfR (Louth Canal) Limited, a subsidiary development company, to<br />

progress this project at Louth Canal.<br />

1.2 Structure<br />

1.2.1 The structure of this planning supporting statement is as follows:<br />

Chapter 1: This introductory section of the <strong>Planning</strong> <strong>Statement</strong> describes the drawings<br />

and additional supporting documents which are provided with this application;<br />

Chapter 2: Describes the site and its immediate surroundings;<br />

Chapter 3: Outlines the development proposals, and necessary infrastructure required<br />

to support the development;<br />

Chapter 4: Outlines the climate change policy;<br />

Chapter 5: Outlines national planning policy,<br />

Chapter 6: Sets out the development plan and material considerations;<br />

Chapter 7: Provides an assessment of the scheme having regard to the national and<br />

local planning framework and any other material considerations; and<br />

Chapter 8: Concludes the statement.<br />

1.3 Application <strong>Supporting</strong> In<strong>for</strong>mation<br />

1.3.1 In addition to this statement and the planning application <strong>for</strong>m, the application submission will<br />

comprises the following suite of documents:<br />

Design and Access <strong>Statement</strong><br />

1.3.2 A Design and Access <strong>Statement</strong> has been prepared in line with the guidance set out in<br />

Development Management Policy Annex: In<strong>for</strong>mation requirements and validation <strong>for</strong> planning<br />

applications (and the accompanying guidance), which has replaced section 3 of Circular<br />

01/2006 (Changes to the Development Control System). The Design and Access <strong>Statement</strong><br />

sets out how the design has developed to take into consideration both constraints on the site<br />

and the pre-application consultation undertaken with statutory consultees.<br />

March 2012 1 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

Environmental <strong>Statement</strong> (ES)<br />

1.3.3 Having regard to the Town and Country <strong>Planning</strong> (Environmental Impact Assessment) (EIA)<br />

(England and Wales) Regulations, 1999 (as amended) and in consultation with ELDC, the<br />

applicant has prepared an Environmental <strong>Statement</strong> (ES) to accompany the planning<br />

application. The scope of the ES has been agreed with ELDC though the <strong>for</strong>mal Scoping<br />

process prior to submission, and responds to pre-application consultation carried out with the<br />

LPA, statutory and non-statutory consultees.<br />

1.3.4 The ES comprises four separately bound parts:<br />

Non-Technical Summary – summarising the key findings of the EIA in non-technical<br />

language<br />

Volume 1: Written <strong>Statement</strong> – reporting the findings of the EIA<br />

Volume 2: Figures –to accompany the text of Volume 1<br />

Volume 3: Appendices – additional technical material to support the text in Volume 1<br />

<strong>Statement</strong> of Community Involvement (SCI)<br />

1.3.5 A <strong>Statement</strong> of Community Involvement (SCI) has been prepared which records the preapplication<br />

consultation undertaken with the ELDC, members of the public and interested<br />

groups. This consultation included public exhibitions and letters to local MP‟s, Councillors and<br />

Parish Councils. The consultation undertaken has been in<strong>for</strong>med by the East Lindsey<br />

<strong>Statement</strong> of Community Involvement.<br />

Accompanying Drawings<br />

1.3.6 The following drawings have been submitted to accompany the planning application: – these<br />

are all plans that will be submitted:<br />

Figure 1: <strong>Planning</strong> application red line boundary;<br />

Figure 2: Site Infrastructure;<br />

Figure 3: Structure of a typical wind turbine;<br />

Figure 4: External Trans<strong>for</strong>mer Housing;<br />

Figure 5: Typical Cable Trench Detail;<br />

Figure 6: Typical Control/Substation Building;<br />

Figure 7: Typical Turbine Foundation;<br />

Figure 8: Typical Crane Hardstanding;<br />

Figure 9: Typical site track design details (cross-section);<br />

Figure 10: Outline access design into flood embankment;<br />

Figure 11: Typical culvert;<br />

Figure 12: Typical Temporary Construction Compound; and<br />

Figure 13: Meteorological Mast.<br />

March 2012 2 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

2 Site Context<br />

2.1 The Development Site and Surroundings<br />

2.1.1 The proposed Development is located in the County of Lincolnshire to the south east of the<br />

village of Tetney (1.4km), Tetney Lock (2.3km), North Cotes (1.5km), and North Thoresby<br />

(3.2km). The Louth Canal <strong>for</strong>ms the eastern boundary of the site and the site is immediately<br />

surrounded by agricultural land on all sides. The site falls within the East Lindsey District<br />

Council administrative boundary.<br />

2.1.2 Figure 1.2 of the ES shows the Development Site Boundary and surrounding area. Part of the<br />

site is currently used by the Environment Agency, primarily as flood storage area <strong>for</strong> the Louth<br />

Canal during local flood events. The rest of the site is private land used <strong>for</strong> arable agricultural<br />

purposes. Both these uses would continue on the wider site following construction of the<br />

Development.<br />

2.1.3 The Louth Canal is located directly to the east of the site. A fish nursery is partially located<br />

within the site boundary, next to the canal, in the east of the site. This will be unaffected by the<br />

works. A small part of land within the flood storage area is designated as the Tetney Flood<br />

Local Wildlife Site (LWS), which is designated <strong>for</strong> its rich wetland and swamp flora.<br />

2.1.4 Tetney Blow Wells Site of Special Scientific Interest (SSSI) is located 0.6km north-west of the<br />

site, designated <strong>for</strong> its reed beds with base-rich fen and swamp vegetation associated with<br />

calcareous water of four large artesian springs. The Humber Estuary Special Area of<br />

Conservation (SAC), Ramsar, Special Protection Area (SPA) and SSSI is also located<br />

approximately 3.4km north-east of the proposed site.<br />

2.1.5 The landscape of Lincolnshire is typically flat rising significantly above sea level in very few<br />

places along the coast. The exception to this is the Lincolnshire Wolds Area of Outstanding<br />

Natural Beauty (AONB) which lies 6.2km to the west and reaches a height of 167m AOD<br />

providing expansive views of Lincolnshire to the east and west and onto Yorkshire in the north<br />

across the Humber. The Lincolnshire Wolds was designated as an AONB in 1973 to preserve<br />

the natural character of the area. The area comprises a series of low hills and steep valleys<br />

covering approximately 560 square kilometres and contains the highest ground in eastern<br />

England. Chalk hills and areas of sandstone and clay underlie this landscape with open valleys<br />

providing distant views across the surrounding low lying landscape.<br />

2.1.6 Locally designated Areas of Great Landscape Value (AGLV) lie on the eastern edge of the<br />

AONB, 5.2km from the site. The area broadly follows the boundary of the AONB. The area is<br />

designated in order to preserve and protect the distinctive character of the landscape by not<br />

permitting development that would harm the landscape features or detract from the value and<br />

enjoyment of the area.<br />

March 2012 3 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

3 Development Proposals<br />

3.1 Introduction<br />

3.1.1 The application is the culmination of four years of development work by PfR during which time<br />

the site‟s suitability and detailed environmental interests have been assessed. The wind<br />

regime of the site has been defined by one year‟s worth of on-site monitoring and a range of<br />

design options have been explored.<br />

3.2 The Proposed Development<br />

3.2.1 The proposed development is <strong>for</strong> the erection, 25 year operation and subsequent<br />

decommissioning of three wind turbines up to 113.5m tall to the tip of a blade in a vertical<br />

position. The development would have associated underground electrical cables, access<br />

tracks, crane hardstandings, a temporary construction compound, external turbine trans<strong>for</strong>mer<br />

housing, a permanent meteorological mast, and a control/substation building. Access to the<br />

site would be from the A1031 Fen Lane. The layout of the proposed Development is shown in<br />

Figure 4.1 of the ES.<br />

3.2.2 The proposed Development would be connected into the local electricity distribution system.<br />

Analysis and discussions with the local distribution network operator company, Northern<br />

Powergrid (<strong>for</strong>merly (YEDL)), indicate that connection can be made to a substation<br />

approximately 7.5km from the site at North Thoresby by underground cable.<br />

3.2.3 Based on a maximum capacity of up to 2.5 Megawatt (MW) per wind turbine, the proposed<br />

Development could generate approximately 16.4 Gigawatt hours (GWh) of renewable<br />

electricity per year, which is equivalent to the amount of electricity used annually by<br />

approximately 3,680 average households 1 . In addition, the proposed turbine could also<br />

displace approximately 7,062 tonnes of carbon dioxide emissions per year 2 .<br />

Habitat Management<br />

3.2.4 A Habitat Management Plan has been produced <strong>for</strong> the site, and accompanies this planning<br />

application and can be found in Chapter 16 of the Environmental <strong>Statement</strong>. The wider<br />

management objectives of the HMP are to:<br />

Ensure no net loss of habitat through the proposed Development;<br />

Increase the diversity and abundance of invertebrate species at the site;<br />

Sustain and enhance the existing aquatic/marginal habitats within the ditch system;<br />

Introduce better grazing management to create a varied structural and species<br />

diversity within the ditch swamp habitat;<br />

Maintain the ecosystem services associated with the flood reservoir; and<br />

Maintain and enhance ditch habitats <strong>for</strong> water vole.<br />

1 Average household electricity use of 4,463kWh per annum<br />

2 Based on three 2.5MW turbines, operating with a 25% capacity factor and the electricity generated displacing<br />

electricity generated from Combined Cycle Gas Turbines / average fuel mix – approximately 430 gCO2/kWh<br />

March 2012 4 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

Site Operation and Maintenance<br />

3.2.5 Wind turbines are designed to operate largely unattended. Each turbine at the Louth Canal<br />

Wind Energy Development would be fitted with an automatic system designed to supervise<br />

and control a number of parameters to ensure optimal per<strong>for</strong>mance (e.g. start-up and shutdown,<br />

rotor direction, and blade pitch angles etc) and to monitor wellbeing (e.g. generator<br />

temperature). The control system would automatically shut the turbine down should the need<br />

arise. Sometimes the turbines would re-start automatically (if the shut-down had been <strong>for</strong> high<br />

winds or if the grid voltage had fluctuated outwith range), but other shut-downs (e.g. generator<br />

over temperature) would require investigation and manual restart.<br />

3.2.6 The wind turbines will each have an ice detector on the roof of the nacelle that measures<br />

outside temperature and relative air humidity. If pre-set values are exceeded the blades are<br />

stopped by the control system of the turbine. After shutdown due to icing, the turbine can only<br />

be restarted manually following on-site inspection to ensure that the turbine blades are free of<br />

ice, thereby eliminating the potential <strong>for</strong> ice-throw.<br />

3.2.7 The wind farm itself will have a sophisticated overall Supervisory Control and Data Acquisition<br />

system (SCADA) that would continuously interrogate each of the turbines and the high voltage<br />

(HV) connection. If a fault were to develop which required an operator to intervene then the<br />

SCADA system would make contact with on-duty staff via email or a mobile messaging<br />

system. The supervisory control system could be interrogated remotely. The SCADA system<br />

would have a feature to allow a remote operator to shut down one or all of the wind turbines.<br />

3.2.8 An operator would be employed to monitor the turbines, largely through remote routine<br />

interrogation of the SCADA system. The operator would also look after the day-to-day logistical<br />

supervision of the site and would periodically be on site.<br />

Construction<br />

3.2.9 The construction period <strong>for</strong> the Louth Canal Wind Energy Development will last approximately<br />

four to six months and will comprise the following activities:<br />

Construction of access junction to A1031 Fen Lane;<br />

Formation of construction compound including hard standing and temporary site office<br />

facilities;<br />

Construction of new access track and tracks to turbine locations;<br />

Construction/amendment of access into EA flood reservoir;<br />

Construction of crane hard standing areas;<br />

Construction of turbine foundations;<br />

Construction of control/substation building;<br />

Excavation of trenches and cable laying adjacent to site tracks where feasible;<br />

Connection of on-site electricity distribution and communications cables;<br />

Delivery and erection of wind turbines;<br />

Commissioning of site equipment; and<br />

Site restoration.<br />

March 2012 5 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

3.2.10 The overall length of the construction period is somewhat weather dependant and could be<br />

affected by ground conditions found at the site. Site restoration will be programmed and carried<br />

out to allow restoration of disturbed areas as early as possible and in a progressive manner.<br />

March 2012 6 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

4 UK Commitment to Tackling Climate Change<br />

4.1 Overview<br />

4.1.1 The UK Government is strongly encouraging the generation of energy from renewable sources<br />

and the reduction of the emission of gases that contribute to climate change. This support<br />

<strong>for</strong>ms a key element of the UK Climate Change programme and is outlined in the Energy White<br />

Paper, the Energy Review and <strong>Planning</strong> Policy <strong>Statement</strong> 22: Renewable Energy. The<br />

<strong>for</strong>mation of the Department <strong>for</strong> Energy and Climate Change (DECC) in October 2008 reflects<br />

the importance of tackling climate change and the need to secure clean, safe, and af<strong>for</strong>dable<br />

energy.<br />

4.2 The Stern Review<br />

4.2.1 The Stern Review on the economics of climate change (2006) highlighted the challenges faced<br />

by climate change and the policy direction required to initiate a transition to a low-carbon<br />

economy and thus reduce the extent of future climate change. The review highlighted the very<br />

need to reduce future carbon emissions to reduce the level of global warming and also control<br />

the extent to which future climate change affects human activity and the country‟s<br />

infrastructure. For the UK, the Stern review highlights the following potential implications of<br />

climate change:<br />

Infrastructure damage from flooding and storms is expected to increase substantially,<br />

especially in coastal regions, although effective flood management policies are likely to<br />

keep damage in check.<br />

Water availability will be increasingly constrained, as runoff in summer declines,<br />

particularly in the South East where population density is increasing. Serious droughts<br />

will occur more regularly.<br />

Milder winters will reduce cold-related mortality rates and energy demand <strong>for</strong> heating,<br />

while heat-waves will increase heat-related mortality. Cities will become more<br />

uncom<strong>for</strong>table in summer.<br />

Agricultural productivity may initially increase because of longer growing seasons and<br />

the carbon fertilisation effect but this depends on adequate water and requires<br />

changing crops and sowing times.<br />

4.2.2 The Stern review highlights the particular challenges which will be faced by infrastructure<br />

providers in continuing to maintain and provide the infrastructure required in the light of<br />

increased global warming:<br />

“The consequences of climate change in the developed world are likely to be felt earliest and<br />

most strongly through changes in extreme events - storms, floods, droughts, and heat waves.<br />

This could lead to significant infrastructure damage and faster capital depreciation, as capitalintensive<br />

infrastructure has to be replaced, or strengthened, be<strong>for</strong>e the end of its expected<br />

life.” 3<br />

3 The Stern Review, Chapter 5, Page 10, available at: http://www.hm-treasury.gov.uk/stern_review_report.htm<br />

March 2012 7 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

4.2.3 Stern‟s key messages in relation to the need <strong>for</strong> stabilisation of greenhouse gas emissions<br />

highlights the need to ensure that decisions to tackle the issue are taken now to stem the<br />

increase in global warming:<br />

“The world is already irrevocably committed to further climate changes, which will lead to<br />

adverse impacts in many areas. Global temperatures, and there<strong>for</strong>e the severity of impacts,<br />

will continue to rise unless the stock of greenhouse gases is stabilised. Urgent action is now<br />

required to prevent temperatures rising to even higher levels, lowering the risks of impacts that<br />

could otherwise seriously threaten lives and livelihoods worldwide.” 4<br />

4.3 The UK Climate Change Programme and Energy White Paper<br />

4.3.1 As a central element in meeting its Kyoto Agreements, where the UK committed to reduce<br />

emissions of greenhouse gases, principally Carbon Dioxide, by around 5.2% below their 1990<br />

levels over the next decade the Government published its Climate Change Programme in 2000<br />

(reviewed in March 2006 5 ). This sought to further reduce the UK‟s emissions of greenhouse<br />

gases to 20% below 1990 levels by 2010, exceeding the previous Kyoto target. In the longer<br />

term the programme recognised that much larger global cuts of over 60% would be required,<br />

rein<strong>for</strong>cing the benefits from taking early proactive action to reduce emissions.<br />

4.3.2 The Government published the Energy White Paper in 2007. This set out the importance of<br />

energy to society and the economy and the need to consider energy in relation to tackling<br />

climate change and the importance of a secure, clean and af<strong>for</strong>dable energy supply. This set<br />

out four policy goals in regards to energy which rein<strong>for</strong>ced the need to cut CO 2 emissions by<br />

some 60% by about 2050, with 20% of electricity from renewable sources by 2020. The 2006<br />

Energy Review, which preceded the White Paper, included a specific statement on<br />

renewables 6 : The White Paper states that:<br />

“Recognising the particular difficulties faced by renewables in securing planning consent, the<br />

Government is also: Underlining that applicants will no longer have to demonstrate either the<br />

overall need <strong>for</strong> renewable energy or <strong>for</strong> their particular proposal to be sited in a particular<br />

location” (paragraph 5.3.67, page 156).”<br />

4.4 Energy, Climate Change and <strong>Planning</strong> and Energy Acts (2008)<br />

4.4.1 The Energy Act 2008 implements the legislative aspects of the 2007 Energy White Paper. With<br />

regard to onshore wind, the Energy Act strengthens the renewables obligation to drive a<br />

greater and more rapid deployment of renewables in the UK, increasing the diversity of the<br />

UK‟s electricity mix. The renewables obligation is the current main mechanism <strong>for</strong> supporting<br />

large scale generation of renewable electricity.<br />

4.4.2 The renewables obligation works by placing an obligation on licensed electricity suppliers to<br />

source a specified and annually increasing proportion of their electricity sales from renewable<br />

sources, or pay a penalty. Suppliers meet their obligations by presenting sufficient <strong>Renewables</strong><br />

Obligation Certificates (ROCs). A ROC is issued <strong>for</strong> each megawatt hour (MWh) generated by<br />

onshore wind.<br />

4 Stern Review, Chapter 8, Page 193<br />

5 HM Government (2006) Climate Change the UK Programme<br />

6 Department of Trade and Industry (2006) „Annex D: <strong>Renewables</strong> <strong>Statement</strong> of Need‟, The Energy Challenge<br />

March 2012 8 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

4.4.3 Where suppliers do not have sufficient ROCs to meet their obligations, they must pay an<br />

equivalent amount into a fund, the proceeds of which are paid back on a pro-rated basis to<br />

those suppliers that have presented ROCs. The obligation in England and Wales <strong>for</strong> 2011/12 is<br />

0.124 ROCs per MWh i.e. approximately 12% renewable electricity. From 1st April 2012 till the<br />

31st March 2013 the obligation in England and Wales will be 0.124 ROCs per MWh. The<br />

ROCs per MWh is set to rise year on year. Alongside the Energy Act the Government has<br />

introduced further legislation including the Climate Change Act 2008 and the <strong>Planning</strong> and<br />

Energy Act 2008, which are intended to work collectively to enable the long term delivery of the<br />

UK‟s energy and climate change strategy.<br />

4.4.4 The Climate Change Act creates a new approach to managing and responding to climate<br />

change by setting ambitious, legally binding targets of at least 80% cut in greenhouse gas<br />

emissions by 2050, with specific reduction in CO2 emissions of at least 26% by 2020 against a<br />

1990 baseline. The <strong>Planning</strong> and Energy Act enables local planning authorities to set their<br />

own energy use and energy efficiency requirements in their local plan policies. It is clear that<br />

one of the Government‟s key objectives, through the various 2008 Acts, is to maximise and<br />

speed up the delivery of renewable energy provision and to reduce greenhouse gas emissions.<br />

4.5 The UK National Renewable Energy Action Plan<br />

4.5.1 Under Article 4 of the European Renewable Energy Directive (2009/28/EC) the UK was<br />

required to submit a National Renewable Energy Action Plan, 2010 (NREAP). The NREAP<br />

sets out the trajectory and associated measures that will enable the UK to reach its target <strong>for</strong><br />

15% of energy consumption in 2020 to be from renewable sources. The „lead scenario‟ within<br />

this document indicates how the UK can meet this target and provides a view of the technology<br />

mix in 2020. However, this scenario does not represent a target <strong>for</strong> any particular sector or<br />

technology and it should not be seen as an upper limit to the UK‟s ambition <strong>for</strong> renewables<br />

deployment. The Action Plan highlights that:<br />

“The UK needs to radically increase its use of renewable energy.” 7<br />

4.6 The UK Low Carbon Transition Plan and Renewable Energy Strategy<br />

4.6.1 The Government published the UK Low Carbon Transition Plan and Renewable Energy<br />

Strategy in July 2009. A central element of the UK Low Carbon Transition Plan is the aspiration<br />

to generate approximately 30% of all energy through a renewable source by 2020,<br />

representing a five-fold increase on current production levels. The Renewable Energy Strategy<br />

was published in tandem with the Plan to explain how this will be achieved. Specifically, it<br />

explores how the country will meet its legally-binding target to ensure that 15% of its energy is<br />

produced from renewable sources by 2020.<br />

4.6.2 The Strategy‟s lead scenario suggests that over 30% of electricity could be generated from<br />

renewables by 2020 (compared to 2.25% in 2008), of which approximately two-thirds are likely<br />

to be provided by wind turbines. Box 12 of the Renewable Energy Strategy advises that “wind<br />

power is currently one of the most developed and cost effective renewable electricity<br />

technologies. The UK has the largest potential wind resource in Europe.”<br />

7 DECC, National Renewable Energy Action Plan, 2010<br />

March 2012 9 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

4.7 The Carbon Plan: Delivering Our Low Carbon Future<br />

4.7.1 The Government published the Carbon Plan in December 2011 8 . The plan sets out how the<br />

UK will achieve decarbonisation within the framework of energy policy. The plan notes that<br />

emissions are down by a quarter since 1990 and current policies are on track to cut emissions<br />

by over a third on the 1990 levels by 2020. In the next ten years there is a need to develop and<br />

deploy the technologies that will be needed to halve emissions in the 2020s to put the UK on<br />

the path towards an 80% reduction in emission by 2050.<br />

4.7.2 The plan states that to make the transition to a lower carbon economy there will need to be „a<br />

continuation of previous trends in the coming years: more switching from coal to gas-powered<br />

generation, and renewable electricity rising to 30% of electricity generation by 2020‟ (Section<br />

2.148, Pg 71).<br />

4.8 The Coalition Programme <strong>for</strong> Government<br />

4.8.1 The Coalition Government has indicated an ongoing commitment to tackling climate change<br />

and support <strong>for</strong> renewable energy provision. The Coalition Programme <strong>for</strong> Government<br />

includes a commitment to reviewing the Country‟s overall target <strong>for</strong> energy from renewable<br />

sources, subject to the advice of the Climate Change Committee 9 .<br />

4.8.2 In addition to this, the programme also sets out a number of objectives in relation to energy<br />

and climate change that the Government seek to implement over the next five years, including<br />

the following which are relevant to onshore wind energy:<br />

<strong>Supporting</strong> an increase in the EU emission reduction target to 30% by 2020.<br />

Establishing a full system of feed-in tariffs in electricity – as well as the maintenance of<br />

banded <strong>Renewables</strong> Obligation Certificates.<br />

Re<strong>for</strong>m energy markets to deliver security of supply and investment in low carbon<br />

energy.<br />

Production of an Annual Energy <strong>Statement</strong> to Parliament to set strategic energy policy<br />

and guide investment.<br />

Encouraging community-owned renewable energy schemes where local people benefit<br />

from the power produced.<br />

4.8.3 The commitment of the Coalition Government to the importance of saving energy and<br />

delivering a secure green economy is reflected in the publication of the first Annual Energy<br />

<strong>Statement</strong> in December 2010, which sets out a range of actions to help deliver these aims.<br />

Action 16 of the <strong>Statement</strong> set out a commitment to achieve greater reductions in emissions<br />

than outlined under the Kyoto Protocol (pressing <strong>for</strong> the EU to move from the current 20%<br />

target to a 30% target <strong>for</strong> greenhouse gas emission reductions by 2020).<br />

8 Presented to Parliament pursuant to Sections 12 and 14 of the Climate Change Act 2008<br />

Amended 2nd December 2011 from the version laid be<strong>for</strong>e Parliament on 1st December 2011.<br />

9 The Climate Change Committee are an independent body established under the Climate Change Act to advise<br />

the UK Government on setting carbon budgets, and to report to Parliament on the progress made in reducing<br />

greenhouse gas emissions.<br />

March 2012 10 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

4.8.4 On the 8th December 2010, the Energy Bill was introduced into the House of Lords with its<br />

First Reading. This document sets out a range of measures to increase energy efficiency that<br />

will contribute to overarching climate change goals.<br />

4.8.5 The new Government is very supportive of attempts to increase renewable energy provision.<br />

However, there is uncertainty how this support will be translated into detailed policies (and the<br />

timescale <strong>for</strong> the creation of this policy). In the interim, in 2009 the UK signed up to the EU<br />

Renewable Energy Directive (discussed above) which includes a UK target of 15 percent of<br />

energy from renewables by 2020. This directive there<strong>for</strong>e provides sufficient justification <strong>for</strong> the<br />

need to increase renewable energy capacity significantly across the UK.<br />

March 2012 11 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

5 National <strong>Planning</strong> Policy<br />

5.1 Overview<br />

5.1.1 The Government has published a series of <strong>Planning</strong> Policy <strong>Statement</strong>s (PPS), which set out<br />

the broad principles that should be used to in<strong>for</strong>m regional and local planning policy and<br />

support the determination of planning applications. In addition National Policy <strong>Statement</strong>s have<br />

been produced to provide the policy framework <strong>for</strong> Nationally Significant Infrastructure Projects<br />

(NSIPs).<br />

5.2 National Policy <strong>Statement</strong>s<br />

5.2.1 The Government has published the final National Policy <strong>Statement</strong>s (NPS) <strong>for</strong> Energy.<br />

Relevant policy is set out in the National Policy <strong>Statement</strong> <strong>for</strong> Renewable Energy Infrastructure<br />

(EN-3) includes a statement of policy in relation to NSIPs.<br />

5.2.2 In England and Wales the NPS‟s are a material consideration in decision making on relevant<br />

applications that fall under the Town and Country <strong>Planning</strong> Act 1990 (as amended). Whether,<br />

and to what extent, this NPS is a material consideration and will be judged on a case by case<br />

basis. The NPS states that electricity generation from renewable sources of energy is an<br />

important element in the Government‟s development of a low-carbon economy.<br />

5.2.3 The National Policy <strong>Statement</strong> provides the most up to date statement of government policy on<br />

renewable energy development and should there<strong>for</strong>e be given weight when determining<br />

renewable energy schemes in the England.<br />

5.2.4 The NPS reflect the approach of existing guidance set out within national planning policy, but<br />

also outline specific considerations <strong>for</strong> incorporating into the design and assessment of wind<br />

farm developments. The NPS outlines the Government‟s commitment to tackling the UK<br />

energy challenge.<br />

5.3 <strong>Planning</strong> Policy <strong>Statement</strong>s<br />

Overview<br />

5.3.1 The new coalition Government has confirmed that PPS will continue to apply and should be<br />

used to determine planning applications and develop policy until they are replaced by the<br />

National <strong>Planning</strong> Policy Framework.<br />

PPS1: Delivering Sustainable Development<br />

5.3.2 PPS1 sets out the Government‟s vision <strong>for</strong> planning, and the key policies and principles which<br />

should underpin the planning system. PPS1 requires Local <strong>Planning</strong> Authorities (LPAs) to:<br />

“Ensure that development plans contribute to global sustainability by addressing the causes<br />

and potential impacts of climate change – through policies which reduce energy use, reduce<br />

emissions (<strong>for</strong> example, by encouraging patterns of development which reduce the need to<br />

travel by private car, or reduce the impact of moving freight), promote the development of<br />

renewable energy resources, and take climate change impacts into account in the location and<br />

design of development.”<br />

March 2012 12 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

5.3.3 PPS1 sets out how Local Authorities should contribute to the aim of achieving sustainable<br />

development. Paragraph 22 states that through the production of development plans, Local<br />

Authorities should:<br />

“Seek to minimise the need to consume new resources over the lifetime of the development by<br />

making more efficient use or reuse of existing resources, rather than making new demands on<br />

the environment; and should seek to promote and encourage, rather than restrict, the use of<br />

renewable resources.”<br />

5.3.4 The supplement to PPS1, <strong>Planning</strong> and Climate Change outlines how planning should<br />

contribute to reducing emissions and stabilising climate change.<br />

PPS1A: <strong>Planning</strong> and Climate Change<br />

5.3.5 <strong>Planning</strong> Policy <strong>Statement</strong>: <strong>Planning</strong> and Climate Change Supplement to PPS1 was issued in<br />

December 2007 and represents the latest policy on renewable energy generation, with the<br />

exception of the in<strong>for</strong>mation contained within the National Policy <strong>Statement</strong>s. This sets out how<br />

planning should help shape places by encouraging development associated with lowering<br />

carbon emissions, that are resilient to climate change.<br />

5.3.6 The supplement sets out Government policy with regards to planning <strong>for</strong> climate change and in<br />

particular planning <strong>for</strong> future energy provision <strong>for</strong> new and existing developments. It applies to<br />

a number of energy generation types, including Renewable and Low-Carbon energy. As well<br />

as providing guidance <strong>for</strong> addressing the impact of climate change in new development<br />

proposals, the Supplement addresses issues regarding future energy generation.<br />

5.3.7 In the absence of an up-to-date development plan, LPA‟s should have regard to the<br />

Supplement as a material consideration which may supersede the policies in the development<br />

plan, ensuring proposed development is consistent with the policies in the Supplement and<br />

avoid placing requirements on applicants that are inconsistent. Paragraph 20 of PPS1A<br />

provides guidance <strong>for</strong> Local Authorities in determining applications <strong>for</strong> renewable energy<br />

applications:<br />

“In particular, planning authorities should:<br />

Not require applicants <strong>for</strong> energy development to demonstrate either the overall need<br />

<strong>for</strong> renewable energy and its distribution, nor question the energy justification <strong>for</strong> why a<br />

proposal <strong>for</strong> such development must be sited in a particular location;<br />

Ensure any local approach to protecting landscape and townscape is consistent with<br />

PPS22 and does not preclude the supply of any type of renewable energy other than in<br />

the most exceptional circumstances;<br />

Alongside any criteria-based policy developed in line with PPS22, consider identifying<br />

suitable areas <strong>for</strong> renewable and low-carbon energy sources, and supporting<br />

infrastructure, where this would help secure the development of such sources, but in<br />

doing so take care to avoid stifling innovation including by rejecting proposals solely<br />

because they are outside areas identified <strong>for</strong> energy generation; and<br />

Expect a proportion of the energy supply of new development to be secured from<br />

decentralised and renewable or low-carbon energy sources.”<br />

March 2012 13 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

PPS22: Renewable Energy<br />

5.3.8 <strong>Planning</strong> Policy <strong>Statement</strong> 22 outline the Government‟s planning policy framework <strong>for</strong><br />

renewable energy.<br />

5.3.9 PPS22 advocates the increasing provision of renewable energy to meet the Government‟s<br />

commitments on climate change and renewable energy.<br />

“Positive planning which facilitates renewable energy developments can contribute to all four<br />

elements of the Government‟s sustainable development strategy:<br />

Social progress which recognises the needs of everyone – by contributing to the<br />

nation‟s energy needs, ensuring all homes are adequately and af<strong>for</strong>dably heated; and<br />

providing new sources of energy in remote areas;<br />

Effective protection of the environment – by reductions in emissions of greenhouse<br />

gases and thereby reducing the potential <strong>for</strong> the environment to be affected by climate<br />

change;<br />

Prudent use of natural resources – by reducing the nation‟s reliance on ever<br />

diminishing supplies of fossil fuels; and,<br />

Maintenance of high and stable levels of economic growth and employment – through<br />

the creation of jobs directly related to renewable energy developments, but also in the<br />

development of new technologies. In rural areas, renewable energy projects have the<br />

potential to play an increasingly important role in the diversification of rural economies.”<br />

5.3.10 The key principles of PPS22 include the statement that the wider environmental and economic<br />

benefits of all proposals <strong>for</strong> renewable energy projects, whatever their scale, are material<br />

considerations that should be given significant weight in determining whether proposals should<br />

be granted planning permission.<br />

PPS5: <strong>Planning</strong> <strong>for</strong> the Historic Environment<br />

5.3.11 <strong>Planning</strong> Policy <strong>Statement</strong> 5: <strong>Planning</strong> and the Historic Environment was issued in March 2010<br />

and sets out planning policies on the conservation of the historic environment. PPS5 sets out<br />

both plan making policies and development management policies. The development<br />

management policies can be applied by local planning authorities in determining planning<br />

applications.<br />

5.3.12 Policy HE1 provides the overall objectives of the PPS. Policies HE1.2 and HE1.3 are<br />

applicable to developments <strong>for</strong> renewable energy proposals.<br />

HE1.2 Where proposals that are promoted <strong>for</strong> their contribution to mitigating climate change<br />

have a potentially negative effect on heritage assets, local planning authorities should, prior to<br />

determination, and ideally during pre-application discussions, help the applicant to identify<br />

feasible solutions that deliver similar climate change mitigation but with less or no harm to the<br />

significance of the heritage asset and its setting.<br />

HE1.3 Where conflict between climate change objectives and the conservation of heritage<br />

assets is unavoidable, the public benefit of mitigating the effects of climate change should be<br />

weighed against any harm to the significance of heritage assets in accordance with the<br />

development management principles in this PPS and national planning policy on climate<br />

change.<br />

March 2012 14 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

5.3.13 Policy HE10: Additional Policy Principles Guiding the consideration of applications <strong>for</strong><br />

development affecting the setting of designated heritage assets provides guidance <strong>for</strong><br />

development located within the setting of a designated heritage asset:<br />

HE10.1 When considering applications <strong>for</strong> development that affect the setting of a heritage<br />

asset, local planning authorities should treat favourably applications that preserve those<br />

elements of the setting that make a positive contribution to or better reveal the significance of<br />

the asset. When considering applications that do not do this, local planning authorities should<br />

weigh any such harm against the wider benefits of the application. The greater the negative<br />

impact on the significance of the heritage asset, the greater the benefits that will be needed to<br />

justify approval.<br />

HE10.2 Local planning authorities should identify opportunities <strong>for</strong> changes in the setting to<br />

enhance or better reveal the significance of a heritage asset. Taking such opportunities should<br />

be seen as a public benefit and part of the process of place shaping.<br />

PPS7: Sustainable Development in Rural Areas<br />

5.3.14 PPS7 provides specific guidance <strong>for</strong> development in rural areas, with particular guidance on<br />

renewable energy being set out in paragraph 16:<br />

“When preparing policies <strong>for</strong> LDDs and determining planning applications <strong>for</strong> development in<br />

the countryside, local planning authorities should:(i) support development that delivers diverse<br />

and sustainable farming enterprises;(ii) support other countryside-based enterprises and<br />

activities which contribute to rural economies, and/or promote recreation in and the enjoyment<br />

of the countryside;(iii) take account of the need to protect natural resources;(iv) provide <strong>for</strong> the<br />

sensitive exploitation of renewable energy sources in accordance with the policies set out in<br />

PPS22; and(v) conserve specific features and sites of landscape, wildlife and historic or<br />

architectural value, in accordance with statutory designations.”<br />

PPS9: Biodiversity and Geological Conservation<br />

5.3.15 PPS 9 sets out the national planning policy on biodiversity and geological conservation. The<br />

document states that sites of regional and local biodiversity and geological interest, which<br />

include Regionally Important Geological Sites, Local Nature Reserves and Local Sites, have a<br />

fundamental role to play in meeting overall national biodiversity targets; contributing to the<br />

quality of life and the well-being of the community; and in supporting research and education.<br />

5.3.16 Criteria-based policies should be established in local development documents against which<br />

proposals <strong>for</strong> any development on, or affecting, such sites will be judged. These policies<br />

should be distinguished from those applied to nationally important sites. The saved policies<br />

from the East Lindsey Local Plan include a policy on local nature reserves and this has been<br />

considered later in this chapter.<br />

March 2012 15 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

PPS23: <strong>Planning</strong> and Pollution Control<br />

5.3.17 PPS23 sets out the national planning policy on pollution control. Paragraph 15 of PPS23 states<br />

that - development control decisions can have a significant effect on the environment. LPAs<br />

must be satisfied that planning permission can be granted on land use grounds taking full<br />

account of environmental impacts. This will require close co-operation with the Environment<br />

Agency and/or the pollution control authority, and other relevant bodies such as English<br />

Nature, Drainage Boards, and water and sewerage undertakers, to ensure that in the case of<br />

potentially polluting developments:<br />

The relevant pollution control authority is satisfied that potential releases can be<br />

adequately regulated under the pollution control framework; and<br />

The effects of existing sources of pollution in and around the site are not such that the<br />

cumulative effects of pollution when the proposed development is added would make<br />

that development unacceptable.<br />

PPS25: Development and Flood Risk<br />

5.3.18 PPS25 outlines government planning policy on development and flood risk.<br />

5.3.19 PPS25, as amended in March 2010, defines wind turbines as Essential Infrastructure within<br />

the Flood Risk Vulnerability Classification. Essential Infrastructure development is considered<br />

to be appropriate <strong>for</strong> Flood Zones 3a and 3b (functional flood plain) but is required to firstly<br />

pass the Sequential Test, then to pass the Exception Test and also must be accompanied by a<br />

FRA Consultation on a <strong>Planning</strong> Policy <strong>Statement</strong>: <strong>Planning</strong> <strong>for</strong> a Low Carbon Future in a<br />

Changing Climate.<br />

PPG 13: Transport<br />

5.3.20 PPG 13 sets out the national planning policy on Transport. This states that where proposed<br />

development will have significant transport implications a Transport Assessment should be<br />

completed.<br />

5.4 Draft National <strong>Planning</strong> Policy Framework<br />

5.4.1 On 25 th July 2011, the Department <strong>for</strong> Communities and Local Government (DCLG) published<br />

the draft of the National <strong>Planning</strong> Policy Framework (NPPF). The draft NPPF is a key part of<br />

the Government‟s re<strong>for</strong>ms to make the planning system less complex and more accessible;<br />

and follows <strong>Planning</strong> Minister Greg Clark‟s announcement in December 2010 to consolidate<br />

planning policy and guidance into a single national framework.<br />

5.4.2 The objectives of the new planning system are set out within three inter-related components:<br />

<strong>Planning</strong> <strong>for</strong> prosperity (an economic role);<br />

<strong>Planning</strong> <strong>for</strong> people (a social role); and<br />

<strong>Planning</strong> <strong>for</strong> places (an environmental role).<br />

5.4.3 The draft Framework sets out a presumption in favour of sustainable development, and states<br />

that the Government is committed to ensuring that the planning system does everything it can<br />

to support sustainable growth (paragraph 13). Paragraph 14 states that “At the heart of the<br />

planning system is a presumption in favour of sustainable development, which should be seen<br />

as golden thread running through ....decision making” (paragraph 14, page 4).<br />

March 2012 16 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

5.4.4 Paragraph 152 supports the delivery of renewable energy. It states that “To help increase the<br />

use and supply of renewable and low-carbon energy, local planning authorities should<br />

recognise the responsibility on all communities to contribute to energy generation from<br />

renewable or low-carbon sources. They should (inter alia): have a positive strategy to promote<br />

energy from renewable and low-carbon sources...; and design their policies to maximise<br />

renewable and low-carbon energy development while ensuring that adverse impacts are<br />

addressed satisfactorily” (paragraph 152, page 43).<br />

5.4.5 The draft Framework goes on to say that “When determining planning applications, local<br />

planning authorities should apply the presumption in favour of sustainable development and<br />

not require applicants <strong>for</strong> energy development to demonstrate the overall need <strong>for</strong> renewable<br />

or low-carbon energy and also recognise that even small-scale projects provide a valuable<br />

contribution to cutting greenhouse gas emissions; and approve the application if its impacts are<br />

(or can be made) acceptable” (paragraph 153, page 43).<br />

March 2012 17 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

6 The Development Plan<br />

6.1 Introduction<br />

6.1.1 In accordance with section 38 of the <strong>Planning</strong> and Compulsory Purchase Act 2004, the<br />

Development Plan relevant to the proposed Louth Canal Wind Energy Development comprises<br />

the Regional Strategy <strong>for</strong> the East Midlands and the saved policies of the East Lindsey Local<br />

Plan (1995). Under the transitional arrangements in the <strong>Planning</strong> and Compulsory Purchase<br />

Act 2004, the Saved Policies from the East Lindsey Local Plan remain part of the statutory<br />

Development Plan. These policies will subsequently be replaced by the emerging Local<br />

Development Framework.<br />

6.1.2 East Lindsey District Council is currently working towards the production of their Local<br />

Development Framework, however this is at an early stage of development and there is likely<br />

to be a significant interim period until the adoption of the relevant Local Development<br />

Documents.<br />

6.1.3 Section 38 (6) of The <strong>Planning</strong> and Compulsory Purchase Act 2004 requires that planning<br />

applications:<br />

'Shall be made in accordance with the Development Plan unless material considerations<br />

indicate otherwise' 10<br />

6.1.4 A large variety of other documents can be material considerations to be considered in the<br />

determination of planning applications. This includes non-statutory planning documents (e.g.<br />

Supplementary <strong>Planning</strong> Documents), national policy documents (e.g. <strong>Planning</strong> Policy<br />

<strong>Statement</strong>s), draft documents, other plans and strategies and recent planning applications.<br />

There<strong>for</strong>e, although a main focus of this chapter is on requirements set out in the Development<br />

Plan, it also identifies other strategies and plans which should be considered as part of the<br />

determination of the application.<br />

6.2 Recent Changes to <strong>Planning</strong> Policy<br />

6.2.1 The Coalition Government has stated their intent to abolish the Regional Spatial Strategies<br />

(RSSs) through the Localism Act. The Localism Act was enacted in November 2011, but the<br />

section of the Act that give the Secretary of State the power to abolish the Regional Strategy<br />

has not yet come into <strong>for</strong>ce. In the interim period, decision makers in local planning authorities<br />

will, in their determination of planning applications, need to consider whether the Government‟s<br />

stated intent to abolish the RSSs affects the weight to be af<strong>for</strong>ded to the policies contained<br />

therein.<br />

6.2.2 The Secretary of State provided the following guidance in relation to the <strong>for</strong>mer regional<br />

policies on renewable energy and low carbon energy to local planning authorities, so they can<br />

continue to bring <strong>for</strong>ward their Local Development Frameworks (LDF) and make planning<br />

decisions in the transitional period.<br />

10 As stated in Section 38 of the <strong>Planning</strong> and Compulsory Purchase Act 2004 which replaced Section 54a of the<br />

Town and Country <strong>Planning</strong> Act 1990<br />

March 2012 18 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

6.2.3 The Secretary of State has rein<strong>for</strong>ced the Government‟s continued support <strong>for</strong> the<br />

development of renewable and low carbon energy by stating that:<br />

„Through their local plans, authorities should contribute to the move to a low carbon economy,<br />

cut greenhouse gas emissions, help secure more renewable and low carbon energy to meet<br />

national targets, and to adapt to the impacts arising from climate change. In doing so, planning<br />

authorities may find it useful to draw on data that was collected by the Regional Local Authority<br />

Leaders‟ Boards (which will be made available) and more recent work, including assessments<br />

of the potential <strong>for</strong> renewable and low carbon energy‟.<br />

6.3 Regional <strong>Planning</strong> Policy<br />

6.3.1 The East Midlands Plan was published in 2009. As at 1 April 2010 the existing issued East<br />

Midlands Plan and the Regional Economic Strategy together <strong>for</strong>m the Regional Strategy <strong>for</strong> the<br />

East of England.<br />

6.3.2 The role of the Regional Strategy is to guide the production of the Local Development<br />

Frameworks, through plan-making policies. Whilst the Regional Strategy was not envisaged as<br />

a strategy <strong>for</strong> the determination of individual planning applications, there are specific policies<br />

which can be applied directly to development management decisions.<br />

6.3.3 Policy 40 (Regional Priorities <strong>for</strong> Low Carbon Energy Generation) seeks to achieve the<br />

regional target of 175MWe (460GWh/y) of energy from onshore wind sources by 2020. The<br />

policy sets out specific criteria <strong>for</strong> Local <strong>Planning</strong> Authorities to consider in relation to wind<br />

energy proposals.<br />

6.3.4 In establishing criteria <strong>for</strong> onshore wind energy, Local <strong>Planning</strong> Authorities should give<br />

particular consideration to:<br />

Landscape and visual impact, in<strong>for</strong>med by local Landscape Character Assessments;<br />

The effect on the natural and cultural environment (including Biodiversity, the integrity<br />

of designated nature conservation sites of international importance, and historic assets<br />

and their settings);<br />

The effect on the built environment (including noise intrusion);<br />

The number and size of turbines proposed;<br />

The cumulative impact of wind generation projects, including „intervisibility‟;<br />

The contribution of wind generation projects to the regional renewables target; and<br />

The contribution of wind generation projects to national and international environmental<br />

objectives on climate change.<br />

6.3.5 Policy 31 (Priorities <strong>for</strong> the Management and Enhancement of the Region’s Landscape)<br />

seeks to promote the highest level of protection <strong>for</strong> the nationally designated landscapes of the<br />

Lincolnshire Wolds Area of Outstanding Natural Beauty (AONB). The site is located<br />

approximately 6.3km east of the designation, but not within it.<br />

March 2012 19 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

6.3.6 Policy 26 (Protecting and Enhancing the Region’s Natural and Cultural Heritage) states<br />

that sustainable development should ensure the protection, appropriate management and<br />

enhancement of the Region‟s natural and cultural heritage. As a result the following principles<br />

should be applied (relevant to proposed Development):<br />

The Region‟s internationally and nationally designated natural and historic assets<br />

should receive the highest level of protection;<br />

Damage to natural and historic assets or their settings should be avoided wherever<br />

and as far as possible, recognising that such assets are usually irreplaceable;<br />

Unavoidable damage must be minimised and clearly justified by a need <strong>for</strong><br />

development in a relevant local context and where possible in ways which also<br />

contribute to social and economic objectives; and<br />

The region‟s best and most versatile agricultural land should be protected from<br />

permanent loss or damage.<br />

6.4 Local <strong>Planning</strong> Context<br />

Introduction<br />

6.4.1 The saved policies of the East Lindsey Local Plan <strong>for</strong>m part of the statutory development plan<br />

<strong>for</strong> the determination of individual planning applications. However, alongside the Saved<br />

Policies other material considerations exist which are considered to be relevant; these are<br />

contained within national planning policy and the emerging Core Strategy.<br />

6.4.2 Central Government guidance (contained within <strong>Planning</strong> Policy <strong>Statement</strong>s and their<br />

supplements) is now of increasing importance in determining individual planning applications,<br />

particularly where development plans have not been updated to reflect the latest national<br />

guidance.<br />

6.4.3 Upon adoption, the emerging Core Strategy and other development plan documents will <strong>for</strong>m<br />

part of the statutory development plan <strong>for</strong> development control purposes. These documents<br />

are currently under preparation and there<strong>for</strong>e have limited weight in the determination of<br />

planning applications.<br />

Saved Policies from the East Lindsey Local Plan (1995)<br />

6.4.4 The Saved Policies (2007) from the East Lindsey Local Plan alongside the Regional Strategy<br />

<strong>for</strong> the East Midlands <strong>for</strong>m part of the Statutory Local Development Plan <strong>for</strong> Craven District.<br />

However it should be noted that the Saved Policies do not reflect the more recent planning<br />

policy set out in national planning policy statements.<br />

6.4.5 The East Lindsey Local Plan policy on renewable energy generation was not saved by the<br />

Secretary of State, it there<strong>for</strong>e no longer <strong>for</strong>ms part of the development plan. Other policies<br />

that are relevant to the proposed development at Louth Canal include the following (see<br />

overleaf).<br />

March 2012 20 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

6.4.6 Policy A5 (Quality and Design of Development), which states that Development which, by<br />

its design, improves the quality of the environment will be permitted provided it does not<br />

conflict with other Policies of the Plan. Otherwise, development will be permitted only where:-<br />

(a) Its design - including its layout, density, scale, appearance or choice of materials -<br />

does not detract from the distinctive character of the locality;<br />

(b) It retains or incorporates features or characteristics which are important to the quality<br />

of the local environment including important medium and long distance views;<br />

(c) It is integrated within a landscaping scheme appropriate to its setting.<br />

6.4.7 Policy C11 (Lincolnshire Wolds Area of Outstanding Natural Beauty and Areas of Great<br />

Landscape Value):<br />

(a) The Council will protect the natural beauty of the Lincolnshire Wolds Area of<br />

Outstanding Natural Beauty (AONB) and the distinctive character of the Areas of<br />

Great Landscape Value (AGLV) by not permitting development which would:-<br />

i. Harm landscape features, which contribute to the character of the area;<br />

ii. Harm the distinctive character, role or regional or local historic significance of<br />

the area; or<br />

iii. Inhibit the quiet enjoyment of the AONB.<br />

(b) The following development will not be permitted in the AONB unless it is essential in<br />

the national or wider public interest and cannot be located:<br />

i. Major or large scale development;<br />

ii. Exposed hilltop or 'skyline' development;<br />

iii. Hazardous installations;<br />

iv. Telecommunication development of significant scale or height unless it<br />

complies with Policy EMP9;<br />

v. Large scale <strong>for</strong>mal recreation uses, or those which attract large numbers of<br />

visitors;<br />

vi. Development involving the significant loss of road verges and hedgerows.<br />

(c) Small scale development - including local employment and visitor attraction uses and<br />

sport and recreational development - will be permitted in the AONB and AGLV where<br />

it can comply with other policies of the Plan but also in the AONB only where:<br />

i. It is in or alongside a settlement;<br />

ii. It is required to meet the social or economic needs of the Wolds communities;<br />

and<br />

iii. It does not harm the quiet enjoyment, or the distinctive character, of the AONB.<br />

(d) Where development proposals in the AONB are otherwise acceptable in principle,<br />

they will not be granted planning permission unless they have demonstrated how<br />

their layout, design, materials, scale, siting and appearance have taken account of<br />

and complement - the locally distinctive characteristics of the landscape, settlements<br />

or buildings.<br />

March 2012 21 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

6.5 Other Material Considerations<br />

Low Carbon Energy Opportunities and Heat Mapping <strong>for</strong> Local <strong>Planning</strong> Areas Across<br />

the East Midlands (July 2011)<br />

6.5.1 This study looks at the potential energy opportunities across the East Midlands. It is not <strong>for</strong>m<br />

part of the development plan, but would be a material consideration on this planning<br />

application.<br />

6.5.2 The study indicates that in Lincolnshire and East Lindsey, onshore wind <strong>for</strong>ms the greatest<br />

technical resource potential. Wind energy potential is more constrained within the districts of<br />

South Holland and Boston due to the presence of the Wash and areas sensitive to birds. It is<br />

noted that wind still has considerable potential within the county even if development within the<br />

AONB is ruled out. The study also noted that East Lindsey (outside the Lincolnshire Wold<br />

AONB) had the potential <strong>for</strong> 2001 – 2847MW of renewable energy <strong>for</strong> electricity.<br />

6.5.3 The report then looks at the potential sources of energy. It notes that there is potential <strong>for</strong> onshore<br />

commercial-scale in East Lindsey, in summary there is potential <strong>for</strong>:<br />

1000 – 1802.9MW from large wind turbines (4 turbines per km 2 );<br />

4.1MW – 10.8MW from medium wind turbines (10 turbines per km 2 ); and<br />

500.1MW – 833.8MW from small wind turbines (20 turbines per km 2 ).<br />

6.5.4 The study includes an onshore wind energy opportunity plan <strong>for</strong> the East Lindsey District. The<br />

proposed Development site is shown to be an area where there is the highest potential <strong>for</strong><br />

large turbine (4 turbines per km 2 ). This site is identified as being outside of sensitive areas.<br />

Emerging Core Strategy<br />

6.5.5 The draft East Lindsey Core Strategy was issued consultation in October 2009. The emerging<br />

Core Strategy includes a specific policy relating to proposals <strong>for</strong> renewable energy<br />

development (Policy SP30: Renewable Energy), identifying that the Council will support the<br />

District's energy contribution from all <strong>for</strong>ms of renewable sources. Renewable energy projects<br />

will be supported where they respect the capacity and sensitivity of the landscape and<br />

communities to accommodate them.<br />

6.5.6 In particular, they will be assessed on their individual and cumulative impact on landscape<br />

quality, sites or features of natural history importance, sites or buildings of historic or cultural<br />

importance, residential amenity, and the local economy.<br />

March 2012 22 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

7 Appraisal of the Proposed Development<br />

7.1 Introduction<br />

7.1.1 Wind energy developments such as Louth Canal are required to ensure diverse, secure,<br />

economic and sustainable energy supply. The proposed Development will contribute towards<br />

the UK developing a secure energy supply from renewable sources. Global emphasis is<br />

currently being placed on the latter. This chapter outlines how the proposed Development has<br />

taken the key national, regional, and local planning context into consideration as part of the<br />

application.<br />

7.2 National <strong>Planning</strong> Policy<br />

PPS1: Supplement to Climate Change<br />

7.2.1 PPS1 states that local authorities should „ensure any local approach to protecting landscape<br />

and townscape is consistent with PPS22 and does not preclude the supply of any type of<br />

renewable energy other than in the most exceptional circumstances‟.<br />

7.2.2 A thorough EIA process has been carried out through consultation with ELDC and<br />

statutory/non-statutory bodies on the content and methodology of each environmental<br />

assessment. In particular, the methodology and baseline in<strong>for</strong>mation to be included as part of<br />

the Landscape and Visual Assessment (LVIA), Chapter 9 of the ES, was provided to ELDC<br />

prior to carrying out the assessment.<br />

PPS7: Sustainable Development in Rural Areas<br />

7.2.3 Paragraph 16 (iv) of PPS7 states that „when preparing policies <strong>for</strong> LDDs and determining<br />

planning applications <strong>for</strong> development in the countryside, local planning authorities should<br />

provide <strong>for</strong> sensitive exploitation of renewable energy sources in accordance with the policies<br />

in PPS 22‟. As part of the EIA process and in line with the policies set out the PPS22, the<br />

proposed Development has been designed to conserve sensitive environmental features, as<br />

well as ensure that the effect of the development on statutory designations is minimised.<br />

PPS22: Renewable Energy<br />

7.2.4 PPS22 seeks to promote renewable energy generation and states that wider environmental<br />

and economic benefits <strong>for</strong> renewable energy projects are material considerations on<br />

determining planning applications <strong>for</strong> renewable energy.<br />

7.2.5 The location, layout and design of the wind turbines of the proposed Development have been<br />

developed with consideration of the requirements of PPS22 and the PPS22: Companion<br />

Guide. The required assessments and conclusions to meet the requirements of PPS22 are<br />

detailed in Environmental <strong>Statement</strong>. This relates to the affect on the proposed Development in<br />

terms of climate change benefits, transport, noise, landscape, cultural heritage, ecology,<br />

ornithology, hydrology and geology, shadow flicker, socioeconomics and sets out an<br />

Environmental Management Plan <strong>for</strong> the scheme.<br />

March 2012 23 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

7.2.6 Section 4.5 of the Design and Access <strong>Statement</strong> explains how the design process has taken<br />

the requirements of the PPS 22 Companion Guide into consideration to deliver a scheme that<br />

balances renewable energy generation with a range of other environmental and technical<br />

considerations. The proposed development con<strong>for</strong>ms to the guidance set out in PPS 22 and<br />

the Companion Guide.<br />

7.2.7 The construction of the proposed Development would create an opportunity <strong>for</strong> direct<br />

economic benefits within East Lindsey District and the wider region. The <strong>Partnerships</strong> <strong>for</strong><br />

<strong>Renewables</strong>‟ Local Content Policy aims to use local content where possible during the<br />

construction and operational phases of every project. It is estimated that 15-20% of the cost of<br />

a wind energy development is <strong>for</strong> work which requires skills typically available from UK<br />

contractors, in other words, using locally-based contractors and local labour within a local<br />

authority area or a region. In addition PfR are proposing to provide a Community Fund. The<br />

Community Fund would be an annual payment administrated by representatives of the local<br />

community. The fund can be spent in anyway the community sees fit.<br />

7.2.8 On the basis that each megawatt of installed capacity requires approximately £1 million of<br />

capital, the proposed Development would provide a positive impact on the local economy of c.<br />

£1.1 million.<br />

PPS5: <strong>Planning</strong> <strong>for</strong> Historic Environment<br />

7.2.9 The development is predicted to have no direct effects on buried heritage assets, scheduled<br />

ancient monuments, conservation areas or Registered Park and Gardens<br />

7.2.10 The assessment identified direct visual effects upon the setting of a number of listed churches,<br />

including the Church of St Nicholas, North Coates, Church of St Lawrence Churchthorpe /<br />

Fulstow and the Church of St Peter and St Paul, Tetney. According to DMRB methodology the<br />

effect on these churches is considered to be moderate adverse and it is considered that this<br />

equates to “less than substantial harm”, as defined by PPS 5.<br />

7.2.11 Chapter 10 of the Environmental <strong>Statement</strong> considers the impact of the proposals on heritage<br />

assets and archaeological issues.<br />

7.2.12 The proposal meets the requirements of PPS5, as the effects on identified heritage assets are<br />

considered to result in less than substantial harm to heritage assets as defined in PPS5.<br />

PPS25: Flood Risk and <strong>Planning</strong><br />

7.2.13 The proposed development is considered „essential infrastructure‟ as defined in PPS25. This<br />

means that the sequential test and exception test are not required.<br />

7.2.14 A Flood Risk Assessment has been carried out <strong>for</strong> the proposed development and this can be<br />

found in Chapter 13 of the Environmental <strong>Statement</strong>. This confirms the development does not<br />

increase the risk of flooding and is appropriate in Flood Risk terms. In addition part of the site<br />

currently operates as a flood storage area. The design of the Development means that the<br />

volume of the flood storage is not diminished during the construction and operation of the wind<br />

turbines.<br />

March 2012 24 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

7.3 Regional <strong>Planning</strong> Policy<br />

Policy 40: Regional Priorities <strong>for</strong> Low Carbon Energy Generation<br />

7.3.1 The Regional Spatial Strategy <strong>for</strong> the East Midlands seeks to promote renewable energy<br />

generation. The proposal supports Policy 40 (Regional Priorities <strong>for</strong> Low Carbon Energy<br />

Generation), as it would contribute to the regional target to deliver 175MWe (460GWh/y) of<br />

onshore wind energy in the East Midlands by 2020, as set out in Appendix 5 of the RSS. The<br />

proposed wind energy development at Louth Canal will deliver up to 7.5MW of renewable<br />

energy, or approximately up to 16.4 Gigawatt hours (GWh) of renewable energy per year. This<br />

is equivalent to the amount of electricity used annually by up to approximately 3,680 average<br />

households 11 . The proposed turbines could displace up to approximately 7,062 tonnes of<br />

carbon dioxide emissions per year 12 .<br />

7.3.2 The proposed Development will deliver secure renewable energy, to help meet regional<br />

renewable energy targets. The Regional Spatial Strategy <strong>for</strong> East Midlands includes indicative<br />

target, that by 2020 20% of the regions electricity consumption will be from renewable sources.<br />

This results in a requirement <strong>for</strong> 3671 MWe (5138 GWh/y) of renewable energy generation.<br />

The strategy includes an indicative target of 175MWe from onshore wind energy. The<br />

proposed Development will help deliver this overall target. Significant weight must be given to<br />

these benefits, as stated in PPS22.<br />

Policy 40: Regional Priorities <strong>for</strong> Low Carbon Energy Generation (Establishing Criteria<br />

<strong>for</strong> onshore wind energy)<br />

7.3.3 Policy 40 states that in establishing criteria <strong>for</strong> onshore wind energy, Local <strong>Planning</strong> Authorities<br />

should give particular consideration to the following.<br />

Landscape and visual impact, in<strong>for</strong>med by local Landscape Character Assessments<br />

7.3.4 A Landscape and Visual Impact Assessment (LVIA) has been carried out as part of the EIA,<br />

please refer to Chapter 9 of the ES. This assessment considers the landscape and visual<br />

effects arising as a result of the construction, operation, and decommissioning of the proposed<br />

development, both at a regional and local scale, on landscape, recreational designations and<br />

residential receptors.<br />

7.3.5 The LVIA acknowledges that, as with any wind energy development, there will be effects on<br />

the landscape character and visual amenity close to the site. ELDC adopted the East Lindsey<br />

Landscape Character Assessment in November, 2011. Within this policy guidance there are 6<br />

local Landscape Character Areas (LCAs) within the study area. For each LCA a description<br />

and analysis of the key characteristics has been provided together with a record of notable<br />

features. In addition the assessment has considered the visual effect from sixteen viewpoints,<br />

which were identified through consultation with ELDC, Natural England and the Lincolnshire<br />

Wolds Countryside Service. Individual residential dwellings within 1.7km of the site and<br />

settlements within 7.5km of the site were also assessed.<br />

11 Average household electricity use of 4,463kWh per annum,<br />

(http://www.decc.gov.uk/assets/decc/statistics/publications/ecuk/269-ecuk-domestic-2010.xls table 3.3)<br />

12 Based on three 2.5MW turbines, operating with a 25% capacity factor and the electricity generated displacing<br />

electricity generated from Combined Cycle Gas Turbines / average fuel mix – approximately 430 gCO2/kWh<br />

(endorsed by the Advertising Standards Authority in September 2008)<br />

March 2012 25 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

7.3.6 During operation of the development there are no predicted significant effects on Landscape<br />

Designations, and only locally significant effects on the Lincolnshire Coast and Marshes<br />

National Character Area and the local landscape character area of Tetney Lock to Skegness<br />

Coastal Outmarsh.<br />

7.3.7 Of the sixteen viewpoints considered as part of the visual assessment, one is considered to<br />

experience a major adverse effect and six are assessed as having a moderate adverse effect.<br />

Details of the sixteen viewpoints and the assessment of their effect are included in Table 9.17<br />

in Chapter 9 of the ES.<br />

7.3.8 The effect the proposed Development, on the views from residential properties (within 1.5km)<br />

of the proposed turbine locations has been assessed. This equates to 33 views, as set out in<br />

Table 9.18 in Chapter 9 of the ES. Just one of these views results in a major adverse effect<br />

and 16 in a moderate adverse effect, at a distance of less than 700m from the closest<br />

proposed turbine, further details on these views can be found in Table 9.18 of the ES.<br />

7.3.9 The LVIA acknowledges that both in terms of landscape and visual effects during the<br />

construction and operational phases, there is a certain capacity in the wider landscape <strong>for</strong> the<br />

nature, scale and location of the proposed Development. This supports the findings of the wind<br />

farm capacity studies covering the assessment area and is borne out by the cumulative<br />

assessment findings where, taking into account existing and planned wind farms alongside<br />

other industrialising infrastructure already within the assessment area, it is considered that the<br />

proposed Development would not significantly contribute further to any adverse cumulative<br />

landscape or visual effects. The effect on the natural and cultural environment (including<br />

biodiversity, the integrity of designated nature conservation sites of international importance,<br />

and historic assets and their settings).<br />

7.3.10 The Louth Canal site is not covered by any international and national ecological designations.<br />

The Tetney Flood Local Wildlife Site (LWS) is within the development site boundary which is<br />

designated <strong>for</strong> its rich wetland and swamp flora.<br />

7.3.11 Chapter 11 of the ES provides details of the ecological effects of the proposed Development.<br />

The Ecological Impact Assessment (EcIA) <strong>for</strong> the proposed development follows the published<br />

guidance by the Institute of Ecology and Environmental Management (IEEM). Establishment of<br />

the baseline environment involved a combination of desk based study, data collation and site<br />

survey. The Louth Canal site is not covered by any international and national designations.<br />

There is a local wildlife designation on a small part of the site within the flood reservoir (Tetney<br />

Flood Local Wildlife Site). Hedgerow buffers have been put in place to avoid damage to<br />

habitats. These hedgerows are not ecologically significant and in some cases the local habitats<br />

will benefit from the works. There is predicted to be a minor adverse impact on bat activity, the<br />

details of this are set out in Chapter 11 of the Environmental <strong>Statement</strong>.<br />

7.3.12 The potential effects of the proposed Development on ecology and nature conservation (based<br />

on surveys undertaken, published literature and available guidance documents) are not<br />

considered to be significant.<br />

7.3.13 Chapter 12 of the ES provides details of the ornithological effects of the proposed<br />

Development. It complements the assessment of ecological effects in Chapter 11. The<br />

potential effects of the proposed Development on all birds are considered to be minor adverse<br />

to negligible, and there<strong>for</strong>e not significant. Nevertheless, protective measures and mitigation<br />

during construction of the wind farm will be ensured.<br />

March 2012 26 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

7.3.14 A Habitat Management Plan has been produced <strong>for</strong> the site which includes on-site and off-site<br />

mitigation and enhancement as part of the proposed Development. Further details can be<br />

found in Appendix 11.8 of the ES. The main objectives of the HMP are highlighted in Section<br />

3.2.1 of this statement.<br />

7.3.15 Chapter 10 of the ES provides details of the potential effects on cultural heritage and<br />

archaeological features.<br />

7.3.16 The development is predicted to have no direct effects on buried heritage assets, scheduled<br />

ancient monuments, conservation areas or Registered Park and Gardens.<br />

7.3.17 The assessment identified direct visual effects upon the setting of a number of listed churches,<br />

including the Church of St Nicholas, North Coates, Church of St Lawrence Churchthorpe /<br />

Fulstow and the Church of St Peter and St Paul, Tetney. According to DMRB methodology the<br />

effect on these churches is considered to be moderate adverse and it is considered that this<br />

equates to “less than substantial harm”, as defined by PPS 5.<br />

7.3.18 Chapter 10 of the Environmental <strong>Statement</strong> considers the impact of the proposals on heritage<br />

assets and archaeological issues. The proposal meets the requirements of PPS5, as the<br />

effects on identified heritage assets are considered to result in less than substantial harm to<br />

heritage assets as defined in PPS5.<br />

7.3.19 It is considered that the climate change mitigation benefits of the development (including as<br />

outlined above the wider protection this will af<strong>for</strong>d to the historic environment) outweigh the<br />

„less than substantial harm‟ that the development will bring to the identified heritage assets and<br />

there<strong>for</strong>e the development accords with the policy guidance outlined in PPS5.<br />

The effect on the built environment (including noise intrusion)<br />

7.3.20 A background noise survey was carried out to determine existing noise levels at nearby<br />

representative receptors at Eastfield House, Thoresby Bridge Farm and Windy Ridge. The<br />

noise assessment modelled the effects of the proposed Development on a number of nearby<br />

receptors.<br />

7.3.21 The assessment is based on predicted noise levels from the construction and operation of the<br />

Development at the surrounding noise receptors. The noise levels at all properties will not<br />

exceed the maximum recommended noise levels assessment criteria identified in by ETSU-R-<br />

97 Standards. The full detail of the noise assessment is included in Chapter 8 of the<br />

Environmental <strong>Statement</strong> accompanying this planning application. The noise levels of the<br />

proposed Development are there<strong>for</strong>e considered acceptable and meet the standards required<br />

by ETSU-R-97.<br />

The number and size of turbines proposed<br />

7.3.22 The number and size of the proposed turbines have been designed based on environmental<br />

constraints, technical constraints, and visual appearance within the local and wider setting and<br />

are suitable and appropriate in the context of the location and surrounding area. In terms of the<br />

appearance the turbines would have a standard design with three blades, and a maximum tip<br />

height of 113.5m. The most northern turbine, which is located within the flood storage<br />

reservoir, will be raised by placing a 3 metre concrete base at the bottom of the turbine.<br />

March 2012 27 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

The cumulative impact of wind generation projects, including ‘intervisibility’<br />

7.3.23 The ES has considered potentially significant effects arising from the proposed Development<br />

alongside other major developments, both existing and in the planning process but not yet<br />

built, such as other wind developments. A list of wind farm developments to be considered as<br />

part of the EIA was agreed with ELDC in advance of carrying out each environmental<br />

assessment.<br />

7.3.24 The LVIA concluded that both in terms of landscape and visual effects during both the<br />

construction and operational phases there is a certain capacity in the wider landscape <strong>for</strong> the<br />

nature, scale and location of the proposed Development. This supports the findings of the wind<br />

farm capacity studies covering the assessment area and is borne out by the cumulative<br />

assessment findings where, taking into account existing and planned wind farms alongside<br />

other industrialising infrastructure already within the assessment area, it is considered that the<br />

Louth Canal Development would not significantly contribute further to any adverse cumulative<br />

landscape or visual effects.<br />

The contribution of wind generation projects to national and international environmental<br />

objectives on climate change<br />

7.3.25 National legislation clearly recognises the importance of renewable energy in meeting climate<br />

change targets by reducing the UK‟s reliance on fossil fuels. The development at Louth Canal<br />

will support the UK Climate Change Programme and the Low Carbon Transition Plan and<br />

Renewable Energy Strategy.<br />

Policy 31: Priorities <strong>for</strong> the management and enhancement of the Region’s landscape<br />

7.3.26 Policy 31 seeks to protect the Lincolnshire Wolds Area of Outstanding Natural Beauty (AONB).<br />

The proposal is 6.3km from the AONB and the Landscape and Visual Assessment has shown<br />

that the proposed development has a minor adverse impact from the Area of Outstanding<br />

Natural Beauty and Area of Great Landscape Value. A viewpoint from A18 Road Corridor on<br />

the AONB boundary the impact is considered to be moderate adverse. The Landscape and<br />

Visual effect of the scheme on this area is there<strong>for</strong>e not considered significant and has minimal<br />

impact on views from the AONB.<br />

Policy 26: Protecting and Enhancing the Region’s Natural and Cultural Heritage<br />

7.3.27 Policy 26 seeks to protect the regions natural and cultural heritage. The proposed<br />

Development is predicted to have no direct effects on buried heritage assets, scheduled<br />

ancient monuments, conservation areas or Registered Park and Gardens<br />

7.3.28 The assessment identified direct visual effects upon the setting of a number of listed churches,<br />

including the Church of St Nicholas, North Coates, Church of St Lawrence Churchthorpe /<br />

Fulstow and the Church of St Peter and St Paul, Tetney. According to DMRB methodology the<br />

effect on these churches is considered to be moderate adverse and it is considered that this<br />

equates to “less than substantial harm”, as defined by PPS 5.<br />

7.3.29 Chapter 10 of the Environmental <strong>Statement</strong> considers the impact of the proposals on heritage<br />

assets and archaeological issues. The proposal meets the requirements of PPS5, as the<br />

effects on identified heritage assets are considered to result in less than substantial harm to<br />

heritage assets as defined in PPS5.<br />

March 2012 28 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

7.3.30 The proposed Development there<strong>for</strong>e meets the requirements of Policy 26 as it causes less<br />

than substantial harm to identified heritage assets.<br />

7.3.31 The proposed Development is partly on agricultural land, however following construction the<br />

land will be returned to agricultural use. There will there<strong>for</strong>e be no permanent loss of<br />

agricultural land.<br />

Local <strong>Planning</strong> Policy<br />

7.3.32 The saved policies from the East Lindsey Local Plan do not include a policy on renewable<br />

energy generation, as this was deleted by the Secretary of State in 2007.<br />

7.3.33 The proposal con<strong>for</strong>ms to policy A5 (Quality and Design) (a) as the design of the Development<br />

including its layout, scale and appearance do not detract from the distinctive character of the<br />

locality, as set out in the Design and Access <strong>Statement</strong>. The proposed Development also<br />

meets policy A5 (b) of this policy as it has minimal impact on medium and long term views as<br />

set out in Chapter 9 (Landscape) and the Environmental <strong>Statement</strong>. The proposal also<br />

includes an Environmental Management Plan (EMP) <strong>for</strong> the site post construction, helping to<br />

meet policy A5 (c).<br />

7.3.34 The proposal also accords with Policy C11 (Lincolnshire Wolds AONB) as the final design of<br />

the Development has taken account <strong>for</strong> the potential <strong>for</strong> visual effects on the AONB, including<br />

a reduction in the proposed height of the turbines during design iterations to a scale<br />

appropriate <strong>for</strong> the site to optimise the visual design and minimise potential visual effects.<br />

7.3.35 This policy mainly relates to development within the AONB and as this development is outside<br />

the AONB these remaining elements of the policy is not relevant to this scheme.<br />

7.3.36 It is however worth noting that the Development site is 6.3km from the boundary of the<br />

Lincolnshire Wolds AONB and the conclusions of the Landscape and Visual Assessment<br />

demonstrate that the proposed development has only a minor adverse visual effect on the<br />

assessed views from the Area of Outstanding Natural Beauty and Area of Great Landscape<br />

Value. As such the Development would not harm landscape features or the character, role,<br />

regional or local historic significance of the AONB, or inhibit the quiet enjoyment of it.<br />

7.4 Other material considerations<br />

7.4.1 The Regional Local Carbon Energy Opportunities and Heat Mapping Study is a material<br />

consideration <strong>for</strong> this planning application. This document demonstrates that onshore wind<br />

farms have the greatest technical resource potential in East Lindsey. The study also states that<br />

East Lindsey (outside the Lincolnshire Wold AONB) had the potential <strong>for</strong> 1000 to 1802.9MW of<br />

on shore renewable energy <strong>for</strong> electricity from commercial wind turbines.<br />

7.4.2 The 2010 East Lindsey Annual Monitoring report shows that East Lindsey had a total capacity<br />

of 29.4MW on the 1 st April 2009, with the potential <strong>for</strong> two further onshore wind farm schemes<br />

to be delivered shortly providing another 19MW. The regional target <strong>for</strong> on shore wind is<br />

175MW, whilst there is not local authority target, East Lindsey and other western local authority<br />

areas are highlighted in the study as local authority areas with the highest potential <strong>for</strong><br />

renewable energy generation, including large scale wind turbine development. This report<br />

confirms that in principle East Lindsey has the potential to deliver further renewable energy<br />

schemes.<br />

March 2012 29 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

7.4.3 The proposed Development will allow East Lindsey District Council to contribute towards<br />

national and regional renewable energy targets and also bring significant CO 2 savings. The<br />

proposed Development has the potential to generate approximately 16.4 Gigawatt hours of<br />

renewable electricity per year, which is equivalent to the amount of electricity used annually by<br />

approximately 3,680 average households 13 . In addition, the proposed turbines could also<br />

displace approximately 7,060 tonnes of carbon dioxide emissions per year 14 .<br />

13 Average household electricity use of 4,463kWh per annum<br />

(http://www.decc.gov.uk/assets/decc/statistics/publications/ecuk/269-ecuk-domestic-2010.xls table 3.3)<br />

14 Based on three 2.5MW turbines, operating with a 25% capacity factor and the electricity generated displacing<br />

electricity generated from Combined Cycle Gas Turbines / average fuel mix – approximately 430 gCO 2 /kWh<br />

(endorsed by the Advertising Standards Authority in September 2008)<br />

March 2012 30 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

8 Conclusions<br />

8.1.1 The UK Government regards climate change as probably the greatest long term challenge<br />

facing the human race, and has made it a top political priority. Increasing the supply of energy<br />

from renewable resources in the UK is one of the measures that will enable the Government to<br />

deliver its short and long term international and domestic commitments on reducing<br />

greenhouse gas emissions, as well as its own targets <strong>for</strong> increasing the supply of energy from<br />

such sources.<br />

8.1.2 National <strong>Planning</strong> Policies clearly acknowledge the benefits that the provision of renewable<br />

energy can play. It is generally accepted that wind power is currently the best-placed<br />

renewable energy resource to contribute towards reducing levels of CO 2 in the UK in the short<br />

term, and consequently, national planning policy supports the development of wind farms in<br />

suitable locations. In this case the proposed Development is located within an area which is<br />

considered to be one of the most appropriate locations <strong>for</strong> large scale wind development as set<br />

out in the Local Carbon Energy Opportunities and Heat Mapping Study <strong>for</strong> the East Midlands.<br />

8.1.3 The proposed Development could generate approximately 16.4 Gigawatt hours of renewable<br />

electricity per year, which is equivalent to the amount of electricity used annually by up to<br />

approximately 3,680 average households 15 . In addition, the proposed Development could also<br />

displace up to approximately 7,060 tonnes of carbon dioxide emissions per year 16 .<br />

8.1.4 Although it is acknowledged that there will be effects on the landscape character and visual<br />

amenity within close vicinity to the site, the proposed Development will not have a significant<br />

impact on national landscape designations in the area. An EIA of the proposed Development<br />

has been undertaken, within which the primary issues of landscape visual impact, including<br />

cumulative impacts have been assessed in detail. Any wind farm development will give rise to<br />

a degree of landscape and visual effects due to the very nature and scale of the development.<br />

In the case of the proposed site, taking into account existing and planned wind farms<br />

alongside other industrialising infrastructure already within the assessment area, it is<br />

considered that the proposed Development would not significantly contribute further to any<br />

adverse cumulative landscape or visual effects.<br />

8.1.5 The impacts of the proposal on nature conservation and ecology, ornithology, transport, noise,<br />

residential amenity, cultural heritage, hydrology, geology, and shadow flicker have also been<br />

assessed in detail and environmental effects are considered to be limited and there<strong>for</strong>e are<br />

considered acceptable in environmental terms and in terms of impact on residential amenity.<br />

The benefits of the proposed development in terms of sustainable energy security and<br />

contribution to renewable energy targets also outweigh the limited effects which will result<br />

as a consequence of the development.<br />

15 Average household electricity use of 4,463kWh per annum,<br />

(http://www.decc.gov.uk/assets/decc/statistics/publications/ecuk/269-ecuk-domestic-2010.xls table 3.3)<br />

16 Based on three 2.5MW turbines, operating with a 25% capacity factor and the electricity generated displacing<br />

electricity generated from Combined Cycle Gas Turbines / average fuel mix – approximately 430 gCO 2 /kWh<br />

(endorsed by the Advertising Standards Authority in September 2008)<br />

March 2012 31 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©


Louth Canal Wind Energy Development<br />

8.1.6 The policies outlined in this <strong>Planning</strong> <strong>Statement</strong> have emphasised the need to balance the<br />

beneficial and adverse effects of wind farm development. As such the overall conclusion<br />

reached in this <strong>Planning</strong> <strong>Statement</strong> is that the proposal is acceptable when judged against<br />

planning, environmental, economic and social criteria set down in national, regional and local<br />

policy statements.<br />

8.1.7 In planning policy terms, the scheme accords with the requirements of national planning<br />

policies on renewable energy, sustainable development (particularly in rural areas) and the<br />

historic environment. At the local level, the proposal is also considered to meet the specific<br />

requirements of Policy 40 of the East Midlands RSS. The proposal also meets all the criteria<br />

that local authorities should use to set their renewable energy policies (East Lindsey are<br />

currently progressing their Core Strategy, which would include this).<br />

8.1.8 In summary, the planning and environmental arguments <strong>for</strong> the Proposal are strong, and<br />

approval of the application represents a significant opportunity <strong>for</strong> ELDC to contribute towards<br />

national and local climate change and renewable energy objectives.<br />

March 2012 32 <strong>Planning</strong> <strong>Supporting</strong> <strong>Statement</strong><br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2012 ©

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!