Excerpts from CG 2010 Evaluation Commission 2003 report (What was presented to the Voting members of CGF) 3.4.2 Village 1. The Government is constructing the Village on a pleasant and high quality site. 2. Delhi has guaranteed that the Games Village will be constructed well in advance of the Games although no specific development schedule has been provided (Village construction timetable is anticipated to be 2 years). 3. Post games the Village will become University accommodation. 4. The Village will feature low to medium rise buildings. 5. The proximity of the Village to the airport, city and the venues is excellent and will allow all athletes to live in one Village. IS ANY OF THE ABOVE TRUE ?

Unrealistic Hype and Extravaganza Tourism Asiad 82 – Against thousands of foreign tourists only 200 arrived CG 2006 (Melbourne) – Only 56000 foreign tourists visited CG 2010 – 10 lakhs foreign tourists and 40 lakhs in-country tourists projected Expenditure vs Revenue Initial Estimate of Expenditure – INR 1700 crores Current Estimate of Expenditure – INR 28000 crores Current Estimated of Revenue – INR 4550 crores

Unrealistic Hype and Extravaganza<br />

Tourism<br />

Asiad 82 – Against thousands of foreign tourists only 200 arrived<br />

CG 2006 (Melbourne) – Only 56000 foreign tourists visited<br />

CG 2010 – 10 lakhs foreign tourists and 40 lakhs in-country tourists projected<br />

Expenditure vs Revenue<br />

Initial Estimate of Expenditure – INR 1700 crores<br />

Current Estimate of Expenditure – INR 28000 crores<br />

Current Estimated of Revenue – INR 4550 crores