Silobela Constituency Profile - Parliament of Zimbabwe
Silobela Constituency Profile - Parliament of Zimbabwe
Silobela Constituency Profile - Parliament of Zimbabwe
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
7.0 Business Centres<br />
There are 7 business centers in the <strong>Silobela</strong> constituency. Half <strong>of</strong> the major business centers are<br />
electrified, namely Mkobongwe, Simana, Crossroads and Ruya. A post <strong>of</strong>fice is located at<br />
Crossroads Rural service centre. All the business centres have got retailing outlets with the<br />
exception <strong>of</strong> Bamala.<br />
Table 4: Major Business Centres<br />
Centre Status Electrification Post Office Retailing<br />
Outlets<br />
Donsa Bc Yes<br />
Mkobongwe Bc Yes Yes<br />
Malisa Bc Yes<br />
Simana Bc Yes Yes<br />
Crossroads RSC Yes Yes Yes<br />
Bamala<br />
Bc<br />
Ruya Bc Yes Yes<br />
8.0 Water Points<br />
The constituency has a total <strong>of</strong> 365 boreholes and 38 deep wells from which residents draw water.<br />
Of the 365 boreholes, 312 are functional whilst 35 deep wells are also functional from a total <strong>of</strong> 38.<br />
Increasing the number <strong>of</strong> boreholes and deep-wells within the constituency will help to ease<br />
pressure on the existing ones. The presence <strong>of</strong> so many water points is an indication <strong>of</strong> the dry and<br />
arid nature <strong>of</strong> the constituency. Hence crop production is less compared to animal husbandry in this<br />
constituency.<br />
Table 5: Water Points<br />
Ward Ward Name Boreholes Functional<br />
Bore-Holes<br />
4 New<br />
37 21<br />
Resettlement<br />
5 Sessombi I 29 15<br />
Deep Wells<br />
Functional<br />
Deep Wells<br />
15 Sessombi II 13 10 1 1<br />
17 Kwaedza 39 30 2 1<br />
<strong>Silobela</strong> <strong>Constituency</strong> <strong>Pr<strong>of</strong>ile</strong> Page 10