25.0<br />
20.0<br />
Hours<br />
15.0<br />
10.0<br />
5.0<br />
0.0<br />
Vessel Turnaround Time (Oil & Gas Rig Tenders)<br />
Linear (Vessel Turnaround Time (Oil & Gas Rig Tenders))<br />
Jul‐10 Aug‐10 Sep‐10 Oct‐10 Nov‐10 Dec‐10 Jan‐11 Feb‐11 Mar‐11 Apr‐11 May‐11 Jun‐11<br />
Figure 9 – Vessel Turnaround Time<br />
Crane Rates<br />
Figure 10 shows that the monthly average crane rates for oil & gas supply vessels was 12.8 lifts per<br />
hour (an increase up from 12.0 lifts per hour during 2009-10). This improvement is a result <strong>of</strong><br />
improved coordination between all parties in the landside logistics chain. The increase in crane<br />
rates assists with meeting vessel turnaround time expectations from the <strong>of</strong>fshore oil & gas industry.<br />
There were no oil & gas supply vessels visiting from December 2010 – February 2011.<br />
Lifts per hour<br />
15.0<br />
14.0<br />
13.0<br />
12.0<br />
11.0<br />
10.0<br />
9.0<br />
8.0<br />
7.0<br />
6.0<br />
5.0<br />
Lifts per Hour (Oil & Gas Rig Tenders)<br />
Poly. (Lifts per Hour (Oil & Gas Rig Tenders))<br />
Jul‐10 Aug‐10 Sep‐10 Oct‐10 Nov‐10 Dec‐10 Jan‐11 Feb‐11 Mar‐11 Apr‐11 May‐11 Jun‐11<br />
Figure 10 – Average Crane Rate (Oil & Gas Rig Tenders)<br />
Truck Turnaround Times<br />
Figure 11 shows that the monthly average gate to gate truck turnaround times for trucks servicing<br />
<strong>of</strong>fshore oil & gas exploration over the 12 months to 30 June 2011 was 29 minutes. There were no<br />
oil & gas supply vessels visiting from December 2010 – February 2011.<br />
Page 19 <strong>of</strong> 79