Major works in progress 2010–11 continued<br />

Description<br />

Cost ($)<br />

Before<br />

2010–11 2010–11<br />

Total cost<br />

to date<br />

Practical<br />

completion<br />

date<br />

Comments<br />

The Oaks ZS<br />

Establishment<br />

Tomerong ZS<br />

Establishment<br />

West Liverpool ZS<br />

Establishment<br />

West Parramatta ZS<br />

and East Parramatta<br />

SS Establishment<br />

Wetherill Park West<br />

TS/ZS Establishment<br />

Whalan ZS<br />

Augmentation<br />

Wilton ZS<br />

Establishment<br />

Windsor ZS<br />

Augmentation<br />

27,810 116,388 144,198 Jan 2014 Construct a new 33/11kV<br />

modular substation.<br />

32,137 251,891 284,028 Feb 2014 Construct a new 33/11kV<br />

indoor substation.<br />

6,898,357 5,737,204 12,635,561 Aug 2012 Construct a new 33/11kV<br />

indoor substation to replace<br />

Hoxton Park ZS.<br />

6,715,876 5,598,332 12,314,208 Dec 2013 Construct a new 132/11kV indoor<br />

substation and a new 132kV indoor<br />

switching station, and associated<br />

feeder works.<br />

23,720,676 184,211 23,904,887 Aug 2011 Construct a new 132/11kV zone<br />

substation and a 132/33kV<br />

transmission substation.<br />

5,199,336 1,340,553 6,539,889 Complete Install a new third transformer and<br />

associated 11kV switchgear.<br />

1,078,123 1,609,628 2,687,751 July 2012 Construct a new 66/11kV<br />

substation.<br />

3,657,169 3,742,579 7,399,748 Dec 2014 Rebuild existing substation with a<br />

higher capacity indoor substation.<br />

Network maintenance<br />

Our Strategic Network Maintenance<br />

Plan (SNMP), which is part <strong>of</strong> our<br />

Strategic Asset Management Plan,<br />

analyses maintenance needs against<br />

business objectives and details<br />

the strategies we require to ensure<br />

assets meet our network strategy.<br />

This work includes vegetation<br />

management, asset inspections and<br />

pre-summer bushfire inspections<br />

<strong>of</strong> our overhead electricity lines in<br />

bushfire-prone areas.<br />

The plan is reviewed and updated<br />

annually to identify what network<br />

maintenance activities will be<br />

needed over the ensuing 12-months.<br />

In 2010–11, <strong>Endeavour</strong> <strong>Energy</strong><br />

achieved the delivery <strong>of</strong> a record<br />

maintenance program at a cost<br />

<strong>of</strong> $226.4 million, compared<br />

with our 2009–10 expenditure <strong>of</strong><br />

$211.1 million, and 94% compliance<br />

with our maintenance target.<br />

Our maintenance performance<br />

contributed to our continued<br />

improvement in system reliability<br />

at 72 minutes lost per customer<br />

per year.<br />

Maintenance activities and<br />

expenditure this year included:<br />

• $21.3 million on vegetation<br />

management to maintain safety<br />

clearances, reduce outages,<br />

improve reliability and manage<br />

bushfire risk.<br />

• $16.7 million on metering<br />

including the reading <strong>of</strong> meters<br />

and to provide information for<br />

billing purposes.<br />

• $16.3 million for fault and<br />

emergency work following<br />

weather related events and third<br />

party incidents.<br />

• $14.2 million on preventative<br />

maintenance and inspections<br />

on the transmission and<br />

distribution network.<br />

• $14.2 million on condition<br />

based maintenance.<br />

• $10.6 million for expenses related<br />

to the contestable customer<br />

connection works including<br />

transformers and switchgear paid<br />

by the customer.<br />

• $6.8 million for the overhead line<br />

and pole inspection program,<br />

involving the inspection <strong>of</strong><br />

93,108 poles.<br />

• $6.6 million on street lighting<br />

including replacing 62,033 lamps.<br />

• $119.5 million largely on network<br />

operating overheads and other<br />

maintenance activities.<br />

<strong>Endeavour</strong> <strong>Energy</strong> <strong>Annual</strong> <strong>Performance</strong> <strong>Report</strong> 2010–11<br />

23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!