Major works in progress 2010–11 continued<br />
Description<br />
Cost ($)<br />
Before<br />
2010–11 2010–11<br />
Total cost<br />
to date<br />
Practical<br />
completion<br />
date<br />
Comments<br />
The Oaks ZS<br />
Establishment<br />
Tomerong ZS<br />
Establishment<br />
West Liverpool ZS<br />
Establishment<br />
West Parramatta ZS<br />
and East Parramatta<br />
SS Establishment<br />
Wetherill Park West<br />
TS/ZS Establishment<br />
Whalan ZS<br />
Augmentation<br />
Wilton ZS<br />
Establishment<br />
Windsor ZS<br />
Augmentation<br />
27,810 116,388 144,198 Jan 2014 Construct a new 33/11kV<br />
modular substation.<br />
32,137 251,891 284,028 Feb 2014 Construct a new 33/11kV<br />
indoor substation.<br />
6,898,357 5,737,204 12,635,561 Aug 2012 Construct a new 33/11kV<br />
indoor substation to replace<br />
Hoxton Park ZS.<br />
6,715,876 5,598,332 12,314,208 Dec 2013 Construct a new 132/11kV indoor<br />
substation and a new 132kV indoor<br />
switching station, and associated<br />
feeder works.<br />
23,720,676 184,211 23,904,887 Aug 2011 Construct a new 132/11kV zone<br />
substation and a 132/33kV<br />
transmission substation.<br />
5,199,336 1,340,553 6,539,889 Complete Install a new third transformer and<br />
associated 11kV switchgear.<br />
1,078,123 1,609,628 2,687,751 July 2012 Construct a new 66/11kV<br />
substation.<br />
3,657,169 3,742,579 7,399,748 Dec 2014 Rebuild existing substation with a<br />
higher capacity indoor substation.<br />
Network maintenance<br />
Our Strategic Network Maintenance<br />
Plan (SNMP), which is part <strong>of</strong> our<br />
Strategic Asset Management Plan,<br />
analyses maintenance needs against<br />
business objectives and details<br />
the strategies we require to ensure<br />
assets meet our network strategy.<br />
This work includes vegetation<br />
management, asset inspections and<br />
pre-summer bushfire inspections<br />
<strong>of</strong> our overhead electricity lines in<br />
bushfire-prone areas.<br />
The plan is reviewed and updated<br />
annually to identify what network<br />
maintenance activities will be<br />
needed over the ensuing 12-months.<br />
In 2010–11, <strong>Endeavour</strong> <strong>Energy</strong><br />
achieved the delivery <strong>of</strong> a record<br />
maintenance program at a cost<br />
<strong>of</strong> $226.4 million, compared<br />
with our 2009–10 expenditure <strong>of</strong><br />
$211.1 million, and 94% compliance<br />
with our maintenance target.<br />
Our maintenance performance<br />
contributed to our continued<br />
improvement in system reliability<br />
at 72 minutes lost per customer<br />
per year.<br />
Maintenance activities and<br />
expenditure this year included:<br />
• $21.3 million on vegetation<br />
management to maintain safety<br />
clearances, reduce outages,<br />
improve reliability and manage<br />
bushfire risk.<br />
• $16.7 million on metering<br />
including the reading <strong>of</strong> meters<br />
and to provide information for<br />
billing purposes.<br />
• $16.3 million for fault and<br />
emergency work following<br />
weather related events and third<br />
party incidents.<br />
• $14.2 million on preventative<br />
maintenance and inspections<br />
on the transmission and<br />
distribution network.<br />
• $14.2 million on condition<br />
based maintenance.<br />
• $10.6 million for expenses related<br />
to the contestable customer<br />
connection works including<br />
transformers and switchgear paid<br />
by the customer.<br />
• $6.8 million for the overhead line<br />
and pole inspection program,<br />
involving the inspection <strong>of</strong><br />
93,108 poles.<br />
• $6.6 million on street lighting<br />
including replacing 62,033 lamps.<br />
• $119.5 million largely on network<br />
operating overheads and other<br />
maintenance activities.<br />
<strong>Endeavour</strong> <strong>Energy</strong> <strong>Annual</strong> <strong>Performance</strong> <strong>Report</strong> 2010–11<br />