Each year we investigate bushfire risks arising from network defects. In 2010–11 we began using our new<br />

helicopter video system which captures high-definition imagery <strong>of</strong> our assets.<br />

Smart grid strategy<br />

The smart grid strategy has<br />

progressed from planning to trials<br />

and now the pilot stage. Good<br />

progress has been made with trials<br />

<strong>of</strong> substation monitoring devices<br />

and smart metering systems. We<br />

have also developed and are about<br />

to implement a system for automatic<br />

fault identification and switching for<br />

the 11kV distribution network within<br />

our Hawkesbury pilot area.<br />

Plans are well underway for<br />

the roll-out <strong>of</strong> an optical-fibre<br />

communications network between<br />

zone substations in the Hawkesbury<br />

area. The design is complete and<br />

vendors for the construction and<br />

supply <strong>of</strong> cable and communications<br />

equipment have been engaged.<br />

Construction started mid 2011.<br />

This initiative will provide a highspeed<br />

communications network<br />

for our Supervisory Control<br />

and Data Acquisition (SCADA)<br />

application as well as future smart<br />

grid applications.<br />

Benefits to customers<br />

The benefits to customers <strong>of</strong> the<br />

implementation <strong>of</strong> our technology<br />

strategy include improved<br />

network reliability, improved<br />

incident response times and<br />

greater efficiency.<br />

Our smart grid substation<br />

monitoring devices, fault<br />

identification and restoration system<br />

will improve reliability by giving us<br />

the capacity to identify faults in real<br />

time, then automatically reconfigure<br />

the network to restore supply to<br />

most customers. This will reduce the<br />

number <strong>of</strong> customers impacted by<br />

network faults in areas in which the<br />

system has been deployed. The first<br />

system is in the process <strong>of</strong> being<br />

rolled out in the Springwood area,<br />

to be followed by a larger scheme<br />

in the Hawkesbury area.<br />

THE YEAR AHEAD<br />

2011–12 Objective 2011–12 Target 2011–12 Reason<br />

• Use technology to provide<br />

more effective operational<br />

control <strong>of</strong> the network.<br />

• Strategy developed and approved<br />

by June 2012.<br />

• To improve reliability, customer<br />

response and operational efficiency.<br />

<strong>Endeavour</strong> <strong>Energy</strong> <strong>Annual</strong> <strong>Performance</strong> <strong>Report</strong> 2010–11<br />