Mitigation Measure Hydro-1: Water Quality<br />

A Water Quality Moni<strong>to</strong>ring Plan will be prepared <strong>and</strong> presented <strong>to</strong> the TRPA <strong>and</strong><br />

LRWQCB for approval prior <strong>to</strong> conducting project activities. Turbidity will be<br />

measured before, during, <strong>and</strong> after installation <strong>and</strong> removal of benthic barriers.<br />

Turbidity curtains will be utilized during suction removal activities <strong>to</strong> contain any<br />

disturbance related turbidity.<br />

Underwater AC control activities in Lake Tahoe require permits from the Army Corps<br />

of Engineers, Lahontan Regional Water Quality Control Board, Tahoe Regional<br />

Planning Agency, <strong>and</strong> the California Department of Fish <strong>and</strong> Game. All of these<br />

permits require moni<strong>to</strong>ring <strong>and</strong> protective measures <strong>to</strong> ensure that project activities<br />

do not result in significant impacts <strong>to</strong> water quality. Project activities will not<br />

commence until all required permits are attained.<br />

The water intake at Eagle Point Campground will be turned off during removal of the<br />

benthic barriers <strong>and</strong> will not be turned back on until water quality returns <strong>to</strong><br />

background levels.<br />

Asian Clam Control Project IS/MND<br />

Emerald Bay State Park<br />

California Department of Parks <strong>and</strong> Recreation<br />

55

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!