PUBLIC SERVICES No project requirements or mitigations measures are necessary. RECREATION MITIGATION MEASURES REC-1: Boating Access Work will be coordinated with tour boat operators in Lake Tahoe to determine the least disruptive days and hours to conduct work. Work will occur during these days and time periods to the extent possible. Emerald Bay will require traffic control for motorized boat traffic for up to 6 hours per day for an estimated 4 weeks during barrier installation and 4 weeks during barrier removal, and during some alternative treatment work. Non-motorized boats and escorted motorized boats may be allowed to pass through the mouth if the water level is high enough to allow passage and maintain the safety of the divers. Public notices will be used to inform the public of temporary boat traffic control. Work will be scheduled during the mornings and on weekdays to the extent possible. No boat traffic control would occur during the weekend, unless there is a need to re-secure a barrier that has moved. A boat will be positioned at the mouth of Emerald Bay to inform the public of project activities and provide information on when the bay will open. Overnight boaters in Emerald Bay will be informed of the temporary boat traffic control to allow departure prior to the start of work. To the extent possible, all installation and removal activities will be scheduled outside of the high recreation period between the Memorial Day and Labor Day weekends. TRANSPORTATION/TRAFFIC MITIGATION MEASURES TRANS-1: Securing Barriers Bottom barriers will be checked routinely to inspect and re-secure any bottom barriers that move or start to billow as gas accumulates under them. UTILITIES AND SERVICE SYSTEMS No project requirements or mitigations measures are necessary. Asian Clam Control Project IS/MND Emerald Bay State Park California Department of Parks and Recreation 78
CHAPTER 6 REFERENCES Chapter 2 University of California, Davis (U.C. Davis). 2009. Tahoe: State of the Lake Report 2009. 6.1- 6.7. University of California, Davis (U.C. Davis). 2010. Tahoe: State of the Lake Report 2010. 6.6- 6.9. Whittmann. M. E., B. Allen, S. Chandra, J. E. Reuter, S. G. Schladow, and K. Webb. 2011. Final Report for the Lake Tahoe Asian Clam Pilot Project. University of California Davis Tahoe Environmental Research Center and University of Reno, Aquatic Ecosystems Analysis Laboratory. 74 pp. Aesthetics California Department of Parks and Recreation (DPR). 1990. Emerald Bay State Park Resource Inventory. Agricultural and Forest Resources California Department of Conservation (CDOC). 2010a. Williamson Act. http://www.conservation.ca.gov/DLRP/lca/Pages/Index.aspx (accessed February 1, 2011). CDOC. 2010b. Farmland Mapping and Monitoring Program. http://www.conservation.ca.gov/dlrp/FMMP/Pages/Index.aspx (accessed January 29, 2011). CDOC. 2009. El Dorado County Williamson Act Lands 2008 and 2009. ftp://ftp.consrv.ca.gov/pub/dlrp/WA/Map%20and%20PDF/El%20Dorado/ElDoradoWA_0 8_09.pdf (accessed February 1, 2011). Air Quality California Air Resources Board (CARB). 2006. Maps Available on this Website: Area Designation Maps. http://www.arb.ca.gov/desig/adm/adm.htm (accessed March 29, 2010). CARB. 2008. California Local Air District Directory. http://www.arb.ca.gov/ei/ maps/statemap/dismap.htm (accessed March 16, 2010). CARB. 2010. State Standard Designations. http://www.arb.ca.gov/desig/statedesig.htm (accessed March 16, 2010). El Dorado County Air Quality Management District (EDCAQMD). 2010. http://www.co.eldorado.ca.us/emd/apcd/index.html (accessed March 8, 2010). Asian Clam Control Project IS/MND Emerald Bay State Park California Department of Parks and Recreation 79
- Page 53 and 54: (Helisoma newberryi) creeks. Lake T
- Page 55 and 56: mouth of Emerald Bay. Creating nois
- Page 57 and 58: ecosystems as wetlands, meadows, an
- Page 59 and 60: V. CULTURAL RESOURCES. ENVIRONMENTA
- Page 61 and 62: and prolonged droughts (Lindström
- Page 63 and 64: Roads expanded and upgraded the roa
- Page 65 and 66: CALIFORNIA ENVIRONMENTAL QUALITY AC
- Page 67 and 68: esources in consultation with the O
- Page 69 and 70: Liquefaction and Landslide Hazards
- Page 71 and 72: would not increase as a result of t
- Page 73 and 74: • Carbon Dioxide - The natural pr
- Page 75 and 76: VIII. HAZARDS AND HAZARDOUS MATERIA
- Page 77 and 78: emergencies and activities would al
- Page 79 and 80: WOULD THE PROJECT: a) Violate any w
- Page 81 and 82: Mitigation Measure Hydro-1: Water Q
- Page 83 and 84: DISCUSSION a) The proposed project
- Page 85 and 86: XII. NOISE. ENVIRONMENTAL SETTING T
- Page 87 and 88: DISCUSSION a) Project activities re
- Page 89 and 90: DISCUSSION a-c) The project does no
- Page 91 and 92: WOULD THE PROJECT: a) Result in sig
- Page 93 and 94: implemented to inform the public, s
- Page 95 and 96: D E F convenience decreasing as den
- Page 97 and 98: c) This project will not will not i
- Page 99 and 100: significant environmental effects?
- Page 101 and 102: d) Most project-related environment
- Page 103: GREENHOUSE GAS EMISSIONS No project
- Page 107 and 108: Cultural Resources Barrett, S. A.,
- Page 109 and 110: Murphy and C.M. Knopp. Report prepa
- Page 111 and 112: Tahoe Regional Planning Agency (TRP
- Page 113 and 114: Report Preparation CALIFORNIA DEPAR
- Page 115 and 116: APPENDIX B SENSITIVE SPECIES LIST _
- Page 117 and 118: Martes pennanti o fisher (C) Plants
- Page 119 and 120: If a Federal agency is involved wit
- Page 121 and 122: APPENDIX C ACRONYMS _______________
PUBLIC SERVICES<br />
No project requirements or mitigations measures are necessary.<br />
RECREATION<br />
MITIGATION MEASURES REC-1: Boating Access<br />
Work will be coordinated with <strong>to</strong>ur boat opera<strong>to</strong>rs in Lake Tahoe <strong>to</strong> determine the least<br />
disruptive days <strong>and</strong> hours <strong>to</strong> conduct work. Work will occur during these days <strong>and</strong> time<br />
periods <strong>to</strong> the extent possible.<br />
Emerald Bay will require traffic control for mo<strong>to</strong>rized boat traffic for up <strong>to</strong> 6 hours per day for<br />
an estimated 4 weeks during barrier installation <strong>and</strong> 4 weeks during barrier removal, <strong>and</strong><br />
during some alternative treatment work. Non-mo<strong>to</strong>rized boats <strong>and</strong> escorted mo<strong>to</strong>rized<br />
boats may be allowed <strong>to</strong> pass through the mouth if the water level is high enough <strong>to</strong> allow<br />
passage <strong>and</strong> maintain the safety of the divers.<br />
Public notices will be used <strong>to</strong> inform the public of temporary boat traffic control.<br />
Work will be scheduled during the mornings <strong>and</strong> on weekdays <strong>to</strong> the extent possible. No<br />
boat traffic control would occur during the weekend, unless there is a need <strong>to</strong> re-secure a<br />
barrier that has moved.<br />
A boat will be positioned at the mouth of Emerald Bay <strong>to</strong> inform the public of project<br />
activities <strong>and</strong> provide information on when the bay will open.<br />
Overnight boaters in Emerald Bay will be informed of the temporary boat traffic control<br />
<strong>to</strong> allow departure prior <strong>to</strong> the start of work.<br />
To the extent possible, all installation <strong>and</strong> removal activities will be scheduled outside of<br />
the high recreation period between the Memorial Day <strong>and</strong> Labor Day weekends.<br />
TRANSPORTATION/TRAFFIC<br />
MITIGATION MEASURES TRANS-1: Securing Barriers<br />
Bot<strong>to</strong>m barriers will be checked routinely <strong>to</strong> inspect <strong>and</strong> re-secure any bot<strong>to</strong>m barriers<br />
that move or start <strong>to</strong> billow as gas accumulates under them.<br />
UTILITIES AND SERVICE SYSTEMS<br />
No project requirements or mitigations measures are necessary.<br />
Asian Clam Control Project IS/MND<br />
Emerald Bay State Park<br />
California Department of Parks <strong>and</strong> Recreation<br />
78