13.05.2014 Views

Chernobyl Nuclear Accident Congressional Hearings Transcript

Chernobyl Nuclear Accident Congressional Hearings Transcript

Chernobyl Nuclear Accident Congressional Hearings Transcript

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

299<br />

-2-<br />

Answer 8<br />

(continued): The Semiscale Facility, used for reactor system thermal<br />

hydraulic studies, was shut down due to NRC budgetary<br />

constraints. It could be reactivated in 28 weeks and<br />

operated for $4.0 million per year plus the cost of any<br />

special modifications and analysis.<br />

The Two-Phase Loop, used for two-phase water hydraulic<br />

studies, was shut down due to budgetary constraints. It<br />

could be reactivated in 26 weeks at a cost of $1.0 million.<br />

The Air Water Loop, used to simulate two-phase water flow<br />

conditions for instrumentation calibration, was shut down due<br />

to budgetary constraints. It could be reactivated in<br />

16 weeks at a cost of $70,000.<br />

The Slowdown Loop, used for high pressure two-phase transient<br />

calibration of instruments for the PBF and LOFT, was tied to<br />

operation of these<br />

facilities.<br />

However, the Experimental Breeder Reactor II (EBR-II), the<br />

Transient Reactor Test (TREAT) Facility, and the Zero Power<br />

Plutonium Reactor (ZPPR) are operational and being utilized<br />

for Safety research and other activities in support of<br />

advanced concepts.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!