257<br />

QUESTION 5. If you were to choose between the current licensing<br />

process and the revised process proposed in<br />

legislation submitted by NRC and DOE to Congress,<br />

which process is better in terms of enhancing the<br />

'safety of nuclear power? Which process is<br />

preferable in terms of meaningful public input?<br />

Which process would lead to a better technology, a<br />

more streamlined construction and licensing<br />

time-period, a more reliable power plant, and lower<br />

electricity costs for ratepayers?<br />

ANSWER .<br />

The following answers are based on the provisions of S. 836, the<br />

NRC proposal, without attempting to account for differences in<br />

S. 2073, the DOE proposal. As the Commission indicated in<br />

testimony before the Senate Committe on Energy and Natural<br />

Resources earlier this year, however, the differences between the<br />

NRC and DOE legislative proposals are small. Therefore, they<br />

would not likely affect the answers given below.<br />

The revised licensing process in the proposed legislation would<br />

result in the development of more complete information at an<br />

earlier stage of the licensing process. Standardization would<br />

foster improvements in design, management, and operation of