Chernobyl Nuclear Power Plant CIA Files - Paperless Archives
Chernobyl Nuclear Power Plant CIA Files - Paperless Archives
Chernobyl Nuclear Power Plant CIA Files - Paperless Archives
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
20 lOP SECRET<br />
TABLE V<br />
SOVIET NUCLEAR POWER STATIONS'<br />
Location and Units<br />
Tomsk C<br />
I. ................ .<br />
2 ................ .<br />
3 ................ .<br />
4 ................ .<br />
Beloyarsk<br />
1. ............... .<br />
2 ................ .<br />
3 ................ .<br />
Novovoronezh<br />
1. ............... .<br />
2 ................ .<br />
3 ................ .<br />
4 ................ .<br />
5 ................ .<br />
Shevchenko<br />
Moderator/Coolant<br />
l<br />
Graphite/Water<br />
Graphite/Water<br />
Graphite/Water<br />
Graphite/Water<br />
Graphite/Water<br />
Graphite/Water<br />
Sodium<br />
Fast Breeder Reactor<br />
Water/Water<br />
Water/Water<br />
Water/Water<br />
Water/Water<br />
Water/Water<br />
1................. Sodium<br />
Fast Breeder Reactor<br />
Bilibino<br />
4 Units.... .. .. .. .. Packaged <strong>Power</strong><br />
Reactor <<br />
Kola<br />
1. ............... .<br />
2 ................ .<br />
Yerevan<br />
1. .............. ; .<br />
2 ................ .<br />
Leningrad<br />
1. ............... .<br />
2 ................ .<br />
Kursk<br />
1 ................ .<br />
2 ................ .<br />
Water/Water<br />
Water/Water<br />
Water/Water<br />
Water/Water<br />
Graphite/Water<br />
Graphite/Water<br />
Graphite/Water<br />
Graphite/Water<br />
<strong>Power</strong> Level<br />
MWe/MWt b<br />
625/8,700<br />
350/1,900<br />
350/1,900<br />
100/286<br />
200/530<br />
600/1,430<br />
240/760<br />
365/1,400<br />
440/1,370<br />
440/1,370<br />
1 ,000/2,550<br />
150/1,000 d<br />
12/60 each<br />
440/1,370<br />
440/1,370<br />
440/1,370<br />
440/1,370<br />
1 ,000/3, 200<br />
1,000/3,200<br />
1,000/3,200<br />
1,000/3,200<br />
Estimated Year in Operation<br />
(At Full <strong>Power</strong>)<br />
At 100 MWe in 1958; modified<br />
in 1963<br />
1961; modified in 1964<br />
1966<br />
1968<br />
1964<br />
1967<br />
By 1975<br />
1965<br />
1969<br />
1971<br />
By 1973<br />
1975<br />
1972<br />
1972<br />
1974<br />
1975<br />
1975<br />
1977<br />
1973<br />
1974<br />
1976<br />
1977<br />
• The Soviets recently announced that two new power stations will be constructed, one in the<br />
Ukraine at <strong>Chernobyl</strong>', and the other at Smolensk. We do not know what type of reactor is to be<br />
built, nor do we know what the power level will be for these stations, and therefore have not included<br />
them in this table.<br />
b M We: capacity of the electric power generating equipment in megawatts of electric power.<br />
M WI: capacity of the reactor in megawatts of thermal power.<br />
c These are dual purpose reactors which also produce weapons grade plutonium.<br />
d This reactor could generate about 350 MWe, but most of the thermal power is for a desalination<br />
plant.<br />