<strong>Building</strong> <strong>Utility</strong>-scale <strong>Projects</strong> in <strong>Arizona</strong><br />

Nick Theisen<br />

Pima Association of Governments<br />

July <strong>14</strong> th , <strong>2011</strong>


Agenda<br />

• SOLON Corporation<br />

• Job Creation<br />

• Recent <strong>Projects</strong><br />

• Energy SMRT Project<br />

• Kingman La Senita USD Project Update


SOLON – At a glance<br />

SOLON SE<br />

• Founded in 1997 and headquartered in Berlin, Germany<br />

• 800 employees worldwide, 1st company on German stock exchange<br />

• One of the largest “pure-play” producers of PV modules<br />

> 2010 Revenue of approximately $880 million (€620)<br />

> 410 MW of annual manufacturing capacity worldwide<br />

> More than 1GW modules produced<br />

• Pioneer of large-scale power plant solutions and integrated EPC contractor<br />

> More than 250 MW SOLON power plants installed or in development worldwide<br />

SOLON Corporation<br />

• Founded in 20<strong>07</strong> and based in Tucson, <strong>Arizona</strong><br />

• Grown from ~ 100 to <strong>14</strong>0 employees in the<br />

past year<br />

• 60 MW of annual manufacturing capacity<br />

• Business Units: Turnkey <strong>Projects</strong>, Solar Products<br />

• ARRA compliant


What’s New?<br />

<strong>In</strong> the past few months<br />

• 2010 PG&E Supplier of the Year<br />

• 15 MWac PG&E UOG Project<br />

• 18MWac APS (Gila Bend Project)<br />

• TEP 1.6MW<br />

• Kingman 1.2MW<br />

• New offices in San Francisco &<br />

Phoenix<br />

• Energy SMRT Site


PV Supply Chain<br />

SUPPLIERS<br />

SOLON<br />

PARTNERS<br />

Producer<br />

of Raw<br />

Silicon<br />

Silicon<br />

<strong>In</strong>gots<br />

Silicon<br />

Wafer<br />

Silicon<br />

Cells<br />

Modules<br />

Power<br />

Plants<br />

Finance<br />

Customer


Project Experience<br />

• Modules – more than 1GW of modules produced and supplied worldwide.<br />

• Systems – 250MW of integrated systems installed or in development worldwide.<br />

> 70MW US, ~50MW in <strong>Arizona</strong><br />

• Trackers – 100MW of these integrated systems using SOLON tracker solutions.<br />

• O&M – 50MW of these integrated systems are managed under our O&M programs.


Solar Jobs Created<br />

=<br />

1 MW 20-30 Jobs


Job Creation Case Study – Cotton Center<br />

• SOLON employs <strong>14</strong>0 full-time staff in Tucson, AZ<br />

• Project expected to require ~378,000 hours of construction work over<br />

6 month period<br />

> Translates to roughly 400 full-time construction jobs in Gila Bend, AZ<br />

• Additional employment areas that benefit:<br />

> Engineering (Tucson)<br />

> Permitting (Gila Bend/Maricopa County)<br />

> Feasibility studies (Mesa)<br />

> Title transfer (Tempe)<br />

> Legal (Scottsdale)<br />

> Financing (Phoenix)


Project Summary - Cotton Center<br />

• System Capacity 18MW AC (21MW DC)<br />

• Project Site<br />

Italy: 2.2 MW<br />

> Sonoran Trails, Gila Bend, AZ<br />

> Adjacent to US-80, 5 mi north of Gila Bend<br />

• Project Completion<br />

December 31, <strong>2011</strong><br />

USA: 1.0 MW<br />

6/22/<strong>2011</strong><br />

• Point-of-<strong>In</strong>terconnect<br />

APS Cotton Center 69kV Substation<br />

• Land Use<br />

1MW / 8 Acre ≈ <strong>14</strong>6 Acres<br />

• Modules<br />

SOLON – 75,168 units<br />

• Trackers<br />

SOLON single-axis tracker – 108 units


Project Summary – TRICO Electric Co-op<br />

227kW SunWatts Community Solar Farm<br />

• System Capacity – 227kW<br />

• Project Site – TRICO, Marana, AZ<br />

> Tangerine Rd, Just west of I-10<br />

• Project Completion<br />

Commissioned this morning!<br />

• Modules –SOLON 270W 840 units<br />

• Racking – Fixed-tilt ground mount


UA Tech Park – Energy SMRT Test Site<br />

• Testing Multiple Storage Technologies<br />

• Q3 <strong>2011</strong> – 20kW CAES Prototype<br />

• Q4 <strong>2011</strong> – 100kW Li-Ion Solution<br />

• Project Site – UA Tech Park, Tucson, AZ<br />

• Attached to 1.6MW SOLON PV farm


Energy SMRT Site<br />

Who is involved?<br />

– Project manager, overall system and control design<br />

– PV plant owner, design participation<br />

– CAES design, data interpretation, report preparation<br />

– PV site owner<br />

– Functional Specification, data interpretation


Kingman – La Senita USD Project Update<br />

Background<br />

• Part of 2010 Unisource Implementation Plan<br />

• UNS approved for $5MM of UOG<br />

• Kingman USD – ideal site w/ strong<br />

education element<br />

KUSD #20<br />

System<br />

• 1.22 MW<br />

• Single-axis tracking<br />

Education<br />

• New learning center<br />

• 10 computer workstations<br />

• 3 separate curriculums including all K-12<br />

La Senita Roadrunners!


La Senita Project Approval Process<br />

Mojave Co<br />

KUSD<br />

Mojave Co<br />

• Filed General Plan<br />

Amendment<br />

• Solar Energy Overlay Zone<br />

• Rezoning approved<br />

• Applied to put project on<br />

school district land<br />

• School Board approves<br />

project<br />

• Site-Plan Approval<br />

• Received Grading Permit<br />

• Acquiring <strong>Building</strong> Permits<br />

(2-3 weeks)


La Senita Project Status<br />

• Mobilized on Site this week<br />

• Earth Work<br />

• Awaiting <strong>Building</strong> Permit Approval<br />

(2-3 wks)<br />

• Submitted building plans,<br />

structural drawings, structural<br />

plans, electrical drawings, etc.<br />

• Procurement started<br />

• Project commissioning EOY<strong>2011</strong>


Thank you for your Attention!<br />

Nick Theisen<br />

Service Territory Associate<br />

Mobile: 602.350.6715<br />

nicholas.theisen@solon.com


Solar Energy Overlay Zone District (SEOZ)<br />

• The SEOZ avoids the process of land use change,<br />

rezoning, and amending approved entitlements.<br />

• Adopted by Mojave County to:<br />

• bring underutilized lands into solar production;<br />

• retain underlying entitlements<br />

• Meant to be a holding overlay zone - doesn’t negate<br />

underlying hard zoning. This promotes good land use by<br />

allowing solar development regardless of underlying zoning<br />

designations.<br />

• Expedites the standard rezoning process:<br />

• SFOZ Application Submittal<br />

• Citizen Review Session<br />

• Planning & Zoning Commission Hearing<br />

< 6 wks {• Town Council Hearing & Approval


Single-Axis Tracking<br />

• Optimized surface-yield-ratio, extra solar harvest up to 25%<br />

• Operational in conditions ranging from -5.8 to 122°F ambient<br />

• +/- 45° tracking – backtracking to avoid shadowing losses


SAT Energy Profile<br />

SAT provides extra yield up to ~25% over fixed tilt