12.05.2014 Views

Certification Commission Policy and Procedure Manual

Certification Commission Policy and Procedure Manual

Certification Commission Policy and Procedure Manual

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

APPENDIX 3 H<br />

INACTIVE SUPERVISOR'S CONSULTATION FOR REINSTATEMENT<br />

The report of this meeting includes:<br />

• Summary <strong>and</strong> evaluation of materials presented.<br />

• Summary <strong>and</strong> evaluation of consultation process.<br />

• Summary of current supervisory activity, if any.<br />

• Committee's recommendation whether to reinstate the supervisor as an active<br />

• CPE supervisor. (A "yes" decision requires referral to the <strong>Certification</strong><br />

• <strong>Commission</strong>.)<br />

• Any other recommendations or suggestions.<br />

• Names of sub-committee members.<br />

33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!