10.05.2014 Views

NPC 2 Reconciliation Report

NPC 2 Reconciliation Report

NPC 2 Reconciliation Report

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Bulk Medical Gas System<br />

(BMG)<br />

Component Name<br />

or Description<br />

Location<br />

(Building/Yard)<br />

Room, Area<br />

Yard<br />

Method of Anchorage<br />

OSHPD<br />

Permit No.<br />

Detail<br />

Reference<br />

Anchorage/<br />

Bracing<br />

Compliant<br />

(Yes/No)<br />

Comments<br />

Main Liquid O 2 Tank Equipment Yard Anchored to Foundation SS‐877xxx 5/S15 Yes Located on Site Plan<br />

Reserve Liquid O 2 Tank Equipment Yard Anchored to Foundation SS‐877xxx 6/S15 Yes Located on Site Plan<br />

Vaporizers #1 Equipment Yard Anchored to Foundation SS‐877xxx 6/S15 Yes Located on Site Plan<br />

Vaporizers #2 Equipment Yard Anchored to Foundation SS‐877xxx 6/S15 Yes Located on Site Plan<br />

Vaporizers #3 Equipment Yard Anchored to Foundation SS‐877xxx 6/S15 Yes Located on Site Plan<br />

Nitrous Oxide Tank Equipment Yard Anchored to Foundation SS‐877xxx 6/S15 Yes Located on Site Plan<br />

Manifold/Relief Devices Equipment Yard Anchored to Foundation SS‐877xxx 9/S18 Yes<br />

Anchored to elevated series of rails.<br />

Rails are anchored per listed OSHPD project<br />

OSHPD Notes for Design Professional<br />

1. Common components of the Bulk Medical Gas System are shown

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!