equested, CGS will review the supplemental data <strong>and</strong> analysis <strong>and</strong> submit a letter to OSHPD<br />

stating whether all <strong>of</strong> the geologic <strong>and</strong> seismic hazards are adequately addressed. In some<br />

cases, site ground improvement mitigation methods will result in a conditional approval <strong>of</strong> the<br />

project. Full approval <strong>of</strong> the project is granted after the GOR <strong>and</strong> EOR complete the<br />

recommended ground improvement activities <strong>and</strong> provide a revised hazard report documenting<br />

the improved site conditions. For seismic upgrades or additions to existing structures OSHPD<br />

should be consulted to determine whether or not the project will be <strong>for</strong>warded to CGS <strong>for</strong> review.<br />

Upgrades <strong>and</strong> additions <strong>for</strong>warded to CGS <strong>for</strong> review will be subject to all <strong>of</strong> the requirements<br />

outlined in CGS Note 48.<br />

(OSHPD <strong>Best</strong> <strong>Practices</strong>) Page 9 DRAFT FINAL, Sept. 2011