• Identify any equipment that requires seismic certification <strong>and</strong>/or essential power.<br />

• Identify equipment mounting detail locations.<br />

• Provide humidification <strong>and</strong> temperature control <strong>for</strong> sensitive rooms as listed in CMC<br />

Chapter 3.<br />

• Provide calculations that demonstrate that each room within the project is designed per<br />

CMC Table-4A. If the room is not listed in Table-4A, it is important to provide an equivalent<br />

room.<br />

• Provide humidification <strong>and</strong> temperature control <strong>for</strong> sensitive rooms as listed in CMC<br />

Chapter 3.<br />

• Identify airflow pressure room relationships in either table <strong>for</strong>mat or on the plans via flow<br />

arrows.<br />

• Indicate wall ratings <strong>and</strong> locations <strong>of</strong> fire/smoke dampers.<br />

Remodel projects within a hospital require precautions to insure that airflows in existing areas<br />

outside the project are not affected. Following CAN 2-34-4A is critical in order to minimize OSHPD<br />

plan check comments. Some additional key components necessary <strong>for</strong> remodel plans include:<br />

• Identify project boundary <strong>and</strong> be sure it matches architectural plans.<br />

• Identify any temporary construction barriers.<br />

• Provide a means to insure that airflows outside the project boundary will be maintained.<br />

In<strong>for</strong>mation Plans<br />

Various types <strong>of</strong> drawings are necessary to convey essential in<strong>for</strong>mation such as Schedules,<br />

Piping Diagrams, Mounting Details <strong>and</strong> Control Diagrams.<br />

The title page should clearly define the project location <strong>and</strong> vicinity by graphical means. The<br />

applicable building codes should be stated. A drawing index is recommended to clearly identify all<br />

the unique systems that may be involved.<br />

Site Plans<br />

If the project involves outside (exterior) mechanical work, then it should be clearly shown in the<br />

site plan documentation.<br />

Floor Plans<br />

It is recommended to follow the architectural floor plan nomenclature <strong>for</strong> sheet order <strong>and</strong> sheet<br />

numbering in order to simplify the logical sequence <strong>of</strong> cross-coordination with all trades<br />

(disciplines). Traditionally, the floor plans provide the documentation <strong>of</strong> the architectural features<br />

as a shaded background <strong>and</strong> the mechanical devices are prominently shown on top <strong>of</strong> these<br />

locations. However, it is important to clearly identify room names <strong>and</strong> wall ratings <strong>for</strong> OSHPD<br />

review.<br />

(OSHPD <strong>Best</strong> <strong>Practices</strong>) Page 49 DRAFT FINAL, Sept. 2011