• Accommodate regular site visits by the project structural engineering personnel.<br />

Drawing Contents<br />

The structural drawings should include coordinated framing, foundation <strong>and</strong> footing plans that use<br />

Industry st<strong>and</strong>ard graphics <strong>and</strong> symbols common to structural design documents. It is best practice<br />

place general in<strong>for</strong>mation on the structural basis <strong>of</strong> design <strong>and</strong> the <strong>Design</strong> Criteria <strong>for</strong> complex project<br />

on first sheets.<br />

Schematic design should include a presentation <strong>of</strong> the design criteria, dem<strong>and</strong> loads on the building, <strong>and</strong><br />

the primary structural system definition including foundations, framing systems, lateral <strong>for</strong>ce resisting<br />

systems, earth retention systems.<br />

Detail design should include the necessary specification, analysis, <strong>and</strong> detailing that address the<br />

interconnections <strong>of</strong> primary structural elements that <strong>for</strong>m complete load paths.<br />

Working drawings that are submitted to OSHPD <strong>for</strong> review must be complete. They must provide<br />

thorough <strong>and</strong> high resolution detailing that integrates both the interconnection <strong>of</strong> primary <strong>and</strong><br />

secondary structural elements with complete load paths as well as details that demonstrate the<br />

coordination <strong>of</strong> other disciplines. The complete specification <strong>of</strong> required materials <strong>and</strong> workmanship<br />

should be provided. Detailed drawings <strong>of</strong> anchorage <strong>and</strong> bracing <strong>of</strong> non-structural building<br />

components should be complete <strong>and</strong> be accompanied by references to seismic certifications, st<strong>and</strong>ard<br />

details, <strong>and</strong> pre-approvals.<br />

3.10 <strong>Best</strong> <strong>Practices</strong> <strong>for</strong> Mechanical Drawings<br />

Mechanical Documentation<br />

Purpose<br />

The purpose <strong>of</strong> the Mechanical Drawings are intended to depict all mechanical systems <strong>and</strong><br />

components necessary to provide code minimum heating, ventilating <strong>and</strong> air-conditioning (HVAC)<br />

services within the hospital.<br />

Content<br />

Based upon the complexity <strong>and</strong> scale <strong>of</strong> the project, the in<strong>for</strong>mation provided on the Mechanical<br />

drawings should show clear description <strong>of</strong> the work required <strong>for</strong> the project. In many cases, the<br />

project may involve the documentation <strong>of</strong> existing mechanical systems <strong>and</strong> should clearly identify<br />

new versus existing systems.<br />

Some <strong>of</strong> the key components necessary on plans <strong>for</strong> all projects include:<br />

(OSHPD <strong>Best</strong> <strong>Practices</strong>) Page 48 DRAFT FINAL, Sept. 2011