10.05.2014 Views

Best Practices for Project Management, Design, and Construction of ...

Best Practices for Project Management, Design, and Construction of ...

Best Practices for Project Management, Design, and Construction of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Details that provide in<strong>for</strong>mation on tested rated assemblies should, similarly, adhere to the details<br />

provided by the test documentation, either by Underwriters Laboratories, or other approved<br />

agencies. It is best to provide the construction detail with the identifying UL number. Where<br />

project conditions require a variation to the tested details, an “engineering judgment” may need to<br />

be made by a qualified representative <strong>of</strong> the manufacturer, a registered pr<strong>of</strong>essional engineer, fire<br />

protection engineer or an approved independent testing agency, <strong>and</strong> should be incorporated into<br />

the approved drawings.<br />

(OSHPD <strong>Best</strong> <strong>Practices</strong>) Page 45 DRAFT FINAL, Sept. 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!