09.05.2014 Views

Models SRJ-7 and HRJ-7 Juno Survey Meters

Models SRJ-7 and HRJ-7 Juno Survey Meters

Models SRJ-7 and HRJ-7 Juno Survey Meters

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The 1.35 volt mercury cells (B-2) which supply the tube filament current,<br />

will need to be replaced more frequently than the other batteries.<br />

These cells must be replaced when it becomes impossible to zero the instrument<br />

by means of both the external Zero control <strong>and</strong> the Internal Zero<br />

control (accessible through a hole in the side of the case).<br />

B. Alpha Screen Replaceaent<br />

lChe Alpha screen, which covers the bottom of the chamber, is very<br />

delicate.<br />

If this .screen is touched, or allowed to touch a surface<br />

being measured, it may be perforated or torn.<br />

Replacement screens are available from Technical Associate6 <strong>and</strong> may<br />

be easily replaced by following the procedure given below:<br />

1.<br />

2.<br />

Remove the four nuts which form the feet of the instrument.<br />

Remove the bottom plate <strong>and</strong> slide the two filters back to expose<br />

the Alpha screen.<br />

3.<br />

Remove the two small screws on either side of the metal frame of<br />

the Alpha screen.<br />

The frame can now be slid towards the filters,<br />

<strong>and</strong> out of the slot ;ihich retains one end of the frame.<br />

4.<br />

Slide the frame until it is out of the slot, then tilt it up<br />

<strong>and</strong> remove by sliding towards the front of the instrument.<br />

5*<br />

The new Alpha screen can now be installed by reversing the<br />

above procedure.<br />

-7-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!