07.05.2014 Views

LGCDP M&E Framework

LGCDP M&E Framework

LGCDP M&E Framework

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Indicators Indicator Baseline Indicator Target Means of Verification Responsibility Frequency<br />

Outcome 2:<br />

Increased capacity of Local Governments to manage resources and deliver basic services in an inclusive and equitable manner (150.8m)<br />

a.) MANAGING RESOURCES (DDCs)<br />

• % of all 75 DDCs that meet all 15 5 minimum conditions (as<br />

defined in 12/2008 by the MLD based on LSGA 1999) per fiscal year<br />

63%<br />

(06/2008)<br />

100%<br />

(12/2012)<br />

National Synthesis Report by LBFC LBFC annually<br />

• % of DDCs that score above 50 points in all 62 6 performance<br />

measurements and meet the minimum score in all 8 functional<br />

areas<br />

• % of all 75 DDCs that spend more than 80% of planned capital<br />

development budget 7 per year<br />

• % of all 75 DDCs that spend more than 10% of internal income<br />

explicitly on women, children, DAGs, disabled and old people<br />

per fiscal year<br />

41%<br />

(06/2008)<br />

TBD after<br />

analysis of LBFC<br />

financial records<br />

in 2009<br />

29%<br />

(06/2008)<br />

90%<br />

(12/2012)<br />

TBD after<br />

analysis of LBFC<br />

financial records<br />

in 2009<br />

75%<br />

(12/2012)<br />

National Synthesis Report by LBFC LBFC annually<br />

LBFC financial records LBFC annually<br />

Annual MC/PM assessment report<br />

for DDCs<br />

• % of all 75 DDCs that have less then 2% irregular expenditure 8 9%<br />

80% Annual MC/PM assessment report LBFC<br />

annually<br />

(06/2008) (12/2012) for DDCs<br />

MANAGING RESOURCES (MUNICIPALITIES)<br />

• % of all 58 municipalities that meet the Minimum Conditions (as MC/PM<br />

100% National Synthesis Report LBFC LBFC annually<br />

defined by MLD based on LSGA in 1999) per fiscal year<br />

assessment.2009 (2012)<br />

Indicator(s) on performance measurements to be defined pending the finalization of the municipality MC/PM guidelines<br />

MANAGING RESOURCES (VDCs)<br />

• % of all 3915 VDCs that meet the Minimum Conditions (as defined<br />

by MLD based on LSGA in 1999)<br />

MC/PM<br />

assessment 2009<br />

100% (2012) National Synthesis Report by LBFC LBFC annually<br />

MONITORING AND REPORTING<br />

• % of outcome indicators for which data supposed to be available<br />

are updated per year<br />

• % of DDCs that submit to MLD an annual report based on a<br />

template designed by MLD which includes a synthesized report on<br />

VDCs within August 15 th<br />

b.) BASIC SOCIAL SERVICES<br />

• % of citizens who say that the infrastructure (roads, drinking<br />

water, electricity) offered by the local governments better meet their<br />

needs than last year<br />

• % of DDCs which increase their internal revenues (excludes<br />

revenue sharing and central grants) by at least 15% compared to the<br />

previous fiscal year<br />

• Number of <strong>LGCDP</strong> pilot projects which were scaled up with<br />

government or development partner funds outside the <strong>LGCDP</strong> budget<br />

TBD after<br />

assessment in<br />

2009<br />

template not yet<br />

designed<br />

TBD by <strong>LGCDP</strong><br />

BLS 2009<br />

TBD by <strong>LGCDP</strong><br />

BLS 2009<br />

0<br />

(04/2009)<br />

LBFC<br />

100% (2012) <strong>LGCDP</strong> indicator tracking sheets M&E Section of<br />

MLD<br />

100% (2012) Reports from DDCs submitted to<br />

MLD<br />

TBD after <strong>LGCDP</strong><br />

BLS<br />

TBD after <strong>LGCDP</strong><br />

BLS<br />

3<br />

(04/2012)<br />

Sample surveys<br />

M&E Section of<br />

MLD<br />

M&E Section of<br />

MLD<br />

annually<br />

annually<br />

annually<br />

annually<br />

Financial records of LBFC LBFC annually<br />

MLD reports<br />

M&E Section of<br />

MLD<br />

annually<br />

5 currently only 12 out of 15 minimum conditions are in use<br />

6 currently only 57 out of 62 performance measurements are in use<br />

7 this refers to budget line 6.4., 6.5., 6.6.<br />

8 as defined by the final audit report per fiscal year<br />

33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!