07.05.2014 Views

LGCDP M&E Framework

LGCDP M&E Framework

LGCDP M&E Framework

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

) BASIC SOCIAL SERVICES<br />

Indicator: % of citizens who say that the infrastructure (roads, drinking water, electricity)<br />

offered by the local governments better meet their needs than last year<br />

Rationale: This indicator reflects the perception of citizens that basic social services by local<br />

governments in general (DDCs, VCDs and municipalities) has improved over the past year.<br />

This indicator also serves as a very indirect proxy of client satisfaction for other services<br />

provided by local governments.<br />

Limits: • The indicator relies on proper questioning and a recall technique.<br />

Baseline: To be determined by <strong>LGCDP</strong> baseline survey in 2009<br />

Target:<br />

To be determined after the <strong>LGCDP</strong> baseline survey<br />

Means of<br />

Sample surveys by MLD<br />

Verification<br />

Frequency Every 2 years (2009, 2011, 2013)<br />

Responsibility M&E Section of MLD<br />

Indicator: % of DDCs which increase their internal revenues (excluding central grants) by<br />

at least 15% compared to the previous fiscal year<br />

Rationale: This indicator reflects the extent to which DDCs manage to increase internal revenue<br />

collection. The indicator is:<br />

• a proxy indicator for an increase in management capacity of DDC staff<br />

• a indicator for sustainability of local governance, since internal revenues can<br />

become a cornerstone of financing social services on the district level;<br />

Limits: • The indicator does not reflect the extent to which individual DDCs exceed a<br />

15% increase.<br />

Baseline: To be determined by <strong>LGCDP</strong> baseline survey in 2009<br />

Target:<br />

To be determined after the baseline survey<br />

Means of<br />

Sample Surveys by MLD<br />

Verification<br />

Frequency Every two years (2009, 2011, 2013)<br />

Responsibility M&E Section of MLD<br />

Indicator: Number of <strong>LGCDP</strong> pilot projects which were scaled up with government or<br />

development partner funds outside the <strong>LGCDP</strong> budget<br />

Rationale: This indicator reflects the extent to which pilot projects initiated by the <strong>LGCDP</strong> has been<br />

successful and are regarded as promising initiatives worth further, external funding.<br />

Limits: • The indicator is based on the assumption that if pilots are proven to be<br />

successful, additional funding is available to scale up these interventions.<br />

Baseline: 0 (4/2009)<br />

Target: 3 (04/2012)<br />

Means of<br />

MLD reports<br />

Verification<br />

Frequency annually<br />

Responsibility M&E Section of MLD<br />

16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!