Site Selection/Screening<br />

Two most basic questions:<br />

• Is the site windy?<br />

– Choose reputable met firm with track record of success<br />

– At least 18 months of wind resource study prior to conceptual<br />

layout<br />

• Is the site near adequate “take away” transmission?<br />

– “Str<strong>and</strong>ed Resources”<br />

– Initial feasibility study<br />

– Transmission System Electrical Engineer conducts initial internal<br />

Electrical Analysis of local transmission system to determine<br />

lowest cost interconnection to existing transmission system<br />

(generally, closest substation or transmission line)<br />

Wind Energy Services<br />

Wind Energy Services