Final Engineering Design - PE Design requires supervision by licensed civil, structural and electrical PEs (if applicable) PEs typically need to be licensed in State where project is located Wind Energy Services Wind Energy Services
Preconstruction Finalize Turbine and Long-Lead-Time Item Procurement • Identify and requisition long lead time purchased items, such as wind turbines and transformers Approvals for the later plans and permits (Storm Water Pollution Prevention Plan (SWPPP), Spill Prevention, Containment and Countermeasure Plan (SPCCP) and State DOT and US Army Corps wetlands permits) Final Construction Plans and Drawings Secure Construction Contractor Develop Environmental Construction Compliance Plan Develop Mobilization Plan Wind Energy Services Wind Energy Services
- Page 1 and 2: Integrating Environmental, Engineer
- Page 3 and 4: Integrated Approach to Tt Wind Ener
- Page 5 and 6: Site Selection/Screening Two most
- Page 7 and 8: Critical Issues Analysis Critical
- Page 9 and 10: Moving on to the Conceptual Layout
- Page 11 and 12: Defining the Conceptual Layout Pre
- Page 13 and 14: Typical Setbacks and Constraints
- Page 15 and 16: Agricultural Siting Considerations
- Page 17 and 18: Moving from the Conceptual Layout t
- Page 19 and 20: Studies that Support Final Horizont
- Page 21 and 22: Engineering Tasks for Final Layout
- Page 23 and 24: Wildlife Studies Typically include
- Page 25 and 26: Cultural Resource Studies Consult
- Page 27 and 28: Other Important Studies Noise Sha
- Page 29 and 30: Permitting Phase -- Local Local
- Page 31 and 32: Permitting Phase -- Federal Nation
- Page 33 and 34: Design Disciplines Design Discipli
- Page 35: Design Disciplines Design Discipli
- Page 39 and 40: Construction After the Notice to P
- Page 41 and 42: Tetra Tech, Inc. Tetra Tech, Inc.
- Page 43 and 44: Full-Service Energy Solutions Wind
- Page 45: Contact Anntonette Alberti, JD •
Preconstruction<br />
Finalize Turbine <strong>and</strong> Long-Lead-Time Item Procurement<br />
• Identify <strong>and</strong> requisition long lead time purchased items, such as<br />
wind turbines <strong>and</strong> transformers<br />
Approvals for the later plans <strong>and</strong> permits (Storm Water<br />
Pollution Prevention Plan (SWPPP), Spill Prevention,<br />
Containment <strong>and</strong> Countermeasure Plan (SPCCP) <strong>and</strong><br />
State DOT <strong>and</strong> US Army Corps wetl<strong>and</strong>s permits)<br />
Final Construction Plans <strong>and</strong> Drawings<br />
Secure Construction Contractor<br />
Develop <strong>Environmental</strong> Construction Compliance Plan<br />
Develop Mobilization Plan<br />
Wind Energy Services<br />
Wind Energy Services