Permitting Phase -- Local Local • At most proposed wind energy project sites, one or more local approvals will be required. • The issuing authority may be a local planning commission, zoning board, town, city or village council, county board of supervisors or commissioners, or a similar entity. • Although some state siting boards are authorized to override local objections, most must first demonstrate that the proposed project would be consistent with local ordinances and that there is no reasonable objection to the development of the project. Wind Energy Services Wind Energy Services
Permitting Phase -- Local Local • Similar to the state regulatory process, the need for local approvals and the process for obtaining approvals vary throughout the country. • In some areas, the local approval process will be time -consuming and the project will be subject to close scrutiny. contrast, some municipalities require only a building permit. • The development team should assess which local approvals will be required and consult with local counsel. In Wind Energy Services Wind Energy Services
- Page 1 and 2: Integrating Environmental, Engineer
- Page 3 and 4: Integrated Approach to Tt Wind Ener
- Page 5 and 6: Site Selection/Screening Two most
- Page 7 and 8: Critical Issues Analysis Critical
- Page 9 and 10: Moving on to the Conceptual Layout
- Page 11 and 12: Defining the Conceptual Layout Pre
- Page 13 and 14: Typical Setbacks and Constraints
- Page 15 and 16: Agricultural Siting Considerations
- Page 17 and 18: Moving from the Conceptual Layout t
- Page 19 and 20: Studies that Support Final Horizont
- Page 21 and 22: Engineering Tasks for Final Layout
- Page 23 and 24: Wildlife Studies Typically include
- Page 25 and 26: Cultural Resource Studies Consult
- Page 27: Other Important Studies Noise Sha
- Page 31 and 32: Permitting Phase -- Federal Nation
- Page 33 and 34: Design Disciplines Design Discipli
- Page 35 and 36: Design Disciplines Design Discipli
- Page 37 and 38: Preconstruction Finalize Turbine a
- Page 39 and 40: Construction After the Notice to P
- Page 41 and 42: Tetra Tech, Inc. Tetra Tech, Inc.
- Page 43 and 44: Full-Service Energy Solutions Wind
- Page 45: Contact Anntonette Alberti, JD •
Permitting Phase -- Local<br />
Local<br />
• Similar to the state regulatory process, the need for local<br />
approvals <strong>and</strong> the process for obtaining approvals vary<br />
throughout the country.<br />
• In some areas, the local approval process will be time<br />
-consuming <strong>and</strong> the project will be subject to close scrutiny.<br />
contrast, some municipalities require only a building permit.<br />
• The development team should assess which local approvals will<br />
be required <strong>and</strong> consult with local counsel.<br />
In<br />
Wind Energy Services<br />