What is the Final Horizontal Layout? This layout depicts all project facilities for permitting and land acquisition purposes In many cases, permits must be obtained for exactly what will be built, so a certain amount of engineering must be done at an early stage In a perfect world, micrositing occurs prior to submitting major permit applications and conducting NEPA (or state equivalent) review • Failure to do so often means the need to do permit modifications, supplemental EISs, and/or variances during construction In the real world things aren’t that simple. • If possible, permit for flexibility Wind Energy Services Wind Energy Services
Studies that Support Final Horizontal Layout Field Studies • Site specific environmental and cultural fieldwork • Site specific engineering field work • Constructability considerations Adjust Horizontal Layout and Review for: • Wind resource • Constructability • Engineering • Environmental/cultural resources • Land owner acceptability Final Horizontal Layout Wind Energy Services Wind Energy Services
- Page 1 and 2: Integrating Environmental, Engineer
- Page 3 and 4: Integrated Approach to Tt Wind Ener
- Page 5 and 6: Site Selection/Screening Two most
- Page 7 and 8: Critical Issues Analysis Critical
- Page 9 and 10: Moving on to the Conceptual Layout
- Page 11 and 12: Defining the Conceptual Layout Pre
- Page 13 and 14: Typical Setbacks and Constraints
- Page 15 and 16: Agricultural Siting Considerations
- Page 17: Moving from the Conceptual Layout t
- Page 21 and 22: Engineering Tasks for Final Layout
- Page 23 and 24: Wildlife Studies Typically include
- Page 25 and 26: Cultural Resource Studies Consult
- Page 27 and 28: Other Important Studies Noise Sha
- Page 29 and 30: Permitting Phase -- Local Local
- Page 31 and 32: Permitting Phase -- Federal Nation
- Page 33 and 34: Design Disciplines Design Discipli
- Page 35 and 36: Design Disciplines Design Discipli
- Page 37 and 38: Preconstruction Finalize Turbine a
- Page 39 and 40: Construction After the Notice to P
- Page 41 and 42: Tetra Tech, Inc. Tetra Tech, Inc.
- Page 43 and 44: Full-Service Energy Solutions Wind
- Page 45: Contact Anntonette Alberti, JD •
Studies that Support Final Horizontal Layout<br />
Field Studies<br />
• Site specific environmental <strong>and</strong> cultural fieldwork<br />
• Site specific engineering field work<br />
• <strong>Constructability</strong> considerations<br />
Adjust Horizontal Layout <strong>and</strong> Review for:<br />
• Wind resource<br />
• <strong>Constructability</strong><br />
• <strong>Engineering</strong><br />
• <strong>Environmental</strong>/cultural resources<br />
• L<strong>and</strong> owner acceptability<br />
Final Horizontal Layout<br />
Wind Energy Services<br />
Wind Energy Services