05.05.2014 Views

M4_East_Feedback_Report_April14

M4_East_Feedback_Report_April14

M4_East_Feedback_Report_April14

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Suggest the commercial areas along Parramatta Road are more appropriate for the location of<br />

ventilation outlets, irrespective of any marginal decrease in efficiency.<br />

Request Ashfield Park and Yasmar are not considered as potential sites for a ventilation outlet.<br />

Concern similar problems experienced in relation to the M5 tunnel including in-tunnel ventilation, filtration<br />

systems and health issues will be experienced again.<br />

Suggest a smoky vehicle camera system be installed to detect, identify, record and fine owner /operators<br />

of heavy polluting vehicles.<br />

3.3.3 Health impacts<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Request for a health impact assessment to be undertaken.<br />

Question how the project will ensure air quality will not deteriorate near tunnel entry / exit points, access<br />

ramps and ventilation outlets and question how health risks will be monitored and addressed?<br />

Concern impact on air quality from the project may result in health issues for residents located near to<br />

tunnel entry/exit points, access ramps and ventilation outlets.<br />

Concern residents located close to construction activities will suffer<br />

adverse health effects due to increased noise, vibration, dust and<br />

exposure to asbestos.<br />

Concern about impact on residents’ health and safety as a result<br />

of increased traffic and pollution on local roads.<br />

Comment that local air quality may improve with smoother flowing<br />

traffic along Parramatta Road.<br />

Concern congestion in the tunnel from traffic trying to access City<br />

West Link and Parramatta Road will increase levels of pollution in<br />

and around the tunnel entry/exit points.<br />

Concern about the impact on property owners’ health due to the<br />

uncertainty of the location of project infrastructure, property<br />

acquisition and the stress of having to relocate.<br />

Question whether counselling will be provided to affected property<br />

owners?<br />

Concern a reduction in public open space areas such as Ashfield<br />

Park will have negative impacts on community health, cohesion<br />

and wellbeing.<br />

Update on air quality assessment<br />

Flemington Paddy’s Market community information session<br />

The NSW Government has appointed an expert Advisory Committee on Tunnel Air Quality to review<br />

current national and international best practice. Guidelines set by the Committee will be used by the<br />

project team to assist with the selection of ventilation outlet sites.<br />

The air quality monitoring program will be carried out during the current planning and assessment phase<br />

and when the motorway opens to traffic. Air quality specialists have recently been engaged to develop the<br />

monitoring program for the <strong>M4</strong> <strong>East</strong> and have commenced discussions with property owners to identify<br />

suitable locations for the monitoring stations. It is expected that these will be established and will be<br />

monitoring existing conditions by the middle of 2014.<br />

26 <strong>M4</strong> <strong>East</strong> Community <strong>Feedback</strong> <strong>Report</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!