<strong>Strategy</strong> <strong>Survival</strong> <strong>Guide</strong> Version 2.1<br />

Prime Minister’s <strong>Strategy</strong> Unit<br />

home | strategy development | strategy skills | site index<br />

<strong>Strategy</strong> Skills > Managing the Project<br />

Managing risks<br />

> in practice<br />

The project plan should contain an analysis of risks to the project itself. There are a number of potential risks<br />

which can hamper a project including necessary changes to the project time scale, budget cuts, staff<br />

problems or shortages or, more fundamentally, that the sponsor changes his/her mind as to the objective or<br />

scope of the project.<br />

The aim of the risk assessment is to identify and assess these threats to successful project delivery. This will<br />

enable the team to identify actions to help avoid or reduce the potential damage.<br />

The risk assessment should identify and describe possible risks to each task identified in the project<br />

management plan. This can be done by brainstorming (perhaps at the initial project away-day) and by<br />

speaking with others who have worked on similar projects or issues.<br />

The analysis should identify the probability of the risk occurring (High/Low) and the potential impact of the<br />

risk on project objectives (High/Low), as shown on the diagram below.<br />

Limited<br />

Probability<br />

High<br />

Probability<br />

High<br />

Impact<br />

Less<br />

Impact<br />

A risk log can be maintained to capture and actively manage risks to the project, and could contain:<br />

• A unique reference for each risk identified<br />

• A description of the risk to the project<br />

• A description of the impact on the project should the risk materialise<br />

• The proximity of the risk, which is an estimation of time-scale for when the risk might materialise<br />

• The likelihood of the risk occurring. This could be a mathematical calculation, or a simpler High,<br />

Medium, Low classification<br />

<strong>Strategy</strong> <strong>Survival</strong> <strong>Guide</strong> – <strong>Strategy</strong> Skills<br />