04.05.2014 Views

Strategy Survival Guide

Strategy Survival Guide

Strategy Survival Guide

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Recruiting a team<br />

In Practice: SU GM Crops & Disability Projects<br />

The clear lesson from both the GM Crops and Disability projects is that team recruitment needs to be an<br />

integral part of project planning. The skills, backgrounds and experiences of all the team members –<br />

especially the team leader – will play a major part in determining the success of the project and the tone<br />

/ content of any outputs.<br />

In the GM Crops project, the SU identified early on that the project team would need to be seen as<br />

objective, with no pre-conceived positions on the many controversies arising from the GM debate. For<br />

this reason, the SU deliberately recruited a team containing no experts on GM issues, recognising that<br />

there was no such thing as an expert perceived as “neutral” by all sides. However, the SU ensured that<br />

the team members contained the right set of skills and experience – economic, scientific and policy<br />

development – which would need to be brought to bear in the project.<br />

The SU adopted a somewhat different approach in recruiting the team for the work on Disability.<br />

Drawing on an early draft of the project’s terms of reference and workstream structures, a list of<br />

essential and desirable team skills was identified. This was then matched against a list of known<br />

candidates, drawn from inside and outside the SU. Where candidates possessed the right skills for the<br />

project, interviews were held, led by the team leader. Where gaps were identified in the necessary skills<br />

mix, new candidates were identified through contacts across Government and elsewhere. At all times,<br />

the overall balance of the team was of paramount importance – as was the need to include experts from<br />

inside and outside Government. Although this thorough process proved to be time-consuming (as much<br />

as 12-14 weeks from initial identification of skills to arrival of the final team member), it was essential in<br />

creating the right team for the project.<br />

<strong>Strategy</strong> <strong>Survival</strong> <strong>Guide</strong> – <strong>Strategy</strong> Skills<br />

Page 48

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!