Recruiting a team<br />
In Practice: SU GM Crops & Disability Projects<br />
The clear lesson from both the GM Crops and Disability projects is that team recruitment needs to be an<br />
integral part of project planning. The skills, backgrounds and experiences of all the team members –<br />
especially the team leader – will play a major part in determining the success of the project and the tone<br />
/ content of any outputs.<br />
In the GM Crops project, the SU identified early on that the project team would need to be seen as<br />
objective, with no pre-conceived positions on the many controversies arising from the GM debate. For<br />
this reason, the SU deliberately recruited a team containing no experts on GM issues, recognising that<br />
there was no such thing as an expert perceived as “neutral” by all sides. However, the SU ensured that<br />
the team members contained the right set of skills and experience – economic, scientific and policy<br />
development – which would need to be brought to bear in the project.<br />
The SU adopted a somewhat different approach in recruiting the team for the work on Disability.<br />
Drawing on an early draft of the project’s terms of reference and workstream structures, a list of<br />
essential and desirable team skills was identified. This was then matched against a list of known<br />
candidates, drawn from inside and outside the SU. Where candidates possessed the right skills for the<br />
project, interviews were held, led by the team leader. Where gaps were identified in the necessary skills<br />
mix, new candidates were identified through contacts across Government and elsewhere. At all times,<br />
the overall balance of the team was of paramount importance – as was the need to include experts from<br />
inside and outside Government. Although this thorough process proved to be time-consuming (as much<br />
as 12-14 weeks from initial identification of skills to arrival of the final team member), it was essential in<br />
creating the right team for the project.<br />