Oklahoma's Ports of Entry Program - Oklahoma Department of ...
Oklahoma's Ports of Entry Program - Oklahoma Department of ... Oklahoma's Ports of Entry Program - Oklahoma Department of ...
Oklahoma’s Ports of Entry Program • Beginning the New Initiative • Site assessment criteria • Direct access to a major point of entry at the vicinity of the State border • Site location prohibits opportunity for truck bypass • Good visibility, sight distance and storage capacity for entrance and exit ramps • Site has adequate mainline distance and configuration for installation of Weigh in Motion (WIM) systems and other mainline classifications or screening features. • Adjoining roadway has relatively flat profiles and grades
Oklahoma’s Ports of Entry Program • Beginning the New Initiative • Site assessment criteria • Availability of right-of of-way for current and reasonable anticipated future space needs • Site topography that accommodates development of POE facilities. • Drainage issues • Availability of utility service • Access to emergency and medical services • Compatibility with surrounding land uses and community planning and development • No significant impact to special historic or cultural features
- Page 1 and 2: Oklahoma’s Ports of Entry Program
- Page 3 and 4: • Why build new Facilities? Oklah
- Page 5 and 6: • Why build new Facilities? Oklah
- Page 7: Oklahoma’s Ports of Entry Program
- Page 11 and 12: Oklahoma’s Ports of Entry Program
- Page 13 and 14: Oklahoma’s Ports of Entry Program
- Page 15 and 16: Oklahoma’s Ports of Entry Program
- Page 17 and 18: Oklahoma’s Ports of Entry Program
- Page 19 and 20: Oklahoma’s Ports of Entry Program
- Page 21 and 22: Oklahoma’s Ports of Entry Program
- Page 23 and 24: Oklahoma’s Ports of Entry Program
<strong>Oklahoma</strong>’s<br />
<strong>Ports</strong> <strong>of</strong> <strong>Entry</strong><br />
<strong>Program</strong><br />
• Beginning the New Initiative<br />
• Site assessment criteria<br />
• Availability <strong>of</strong> right-<strong>of</strong><br />
<strong>of</strong>-way for current and reasonable<br />
anticipated future space needs<br />
• Site topography that accommodates development <strong>of</strong><br />
POE facilities.<br />
• Drainage issues<br />
• Availability <strong>of</strong> utility service<br />
• Access to emergency and medical services<br />
• Compatibility with surrounding land uses and<br />
community planning and development<br />
• No significant impact to special historic or cultural<br />
features