I35 South Environmental Assessment - Oklahoma Department of ...

I35 South Environmental Assessment - Oklahoma Department of ... I35 South Environmental Assessment - Oklahoma Department of ...

okladot.state.ok.us
from okladot.state.ok.us More from this publisher

3 rd Public Meeting<br />

I-35 <strong>South</strong><br />

<strong>Environmental</strong> <strong>Assessment</strong><br />

February 26, 2009


I-35 <strong>South</strong> <strong>Environmental</strong> <strong>Assessment</strong><br />

Introductions<br />

• ODOT<br />

• Benham<br />

• FHWA


I-35 <strong>South</strong> <strong>Environmental</strong> <strong>Assessment</strong><br />

Project Team<br />

I-35 SOUTH<br />

PROJECT CONTACT LIST<br />

<strong>Environmental</strong>:<br />

ODOT<br />

Scott Stegmann, 405-522-8014, sstegmann@odot.org<br />

Siv Sundaram, 405-522-3791, ssundaram@odot.org<br />

Public Involvement: Craig Moody, (405) 522-1465, cmoody@odot.org<br />

Roadway: Tim Tegeler, 405-521-2695, ttegeler@odot.org<br />

Kirk Goins, 405-521-2695, kgoins@odot.org<br />

Eduardo Elder, 405-521-2695, eelder@odot.org<br />

Bridge: Annie Lombardo, 405-521-2606, alombardo@odot.org<br />

Survey: Larry Reser, 405-521-2621, lreser@odot.org<br />

Traffic: Daryl Johnson, 405-522-6376, djohnson@odot.org<br />

Reza Amini, 405-521-6779, ramini@odot.org<br />

Harold Smart, 405-521-2861, hsmart@odot.org<br />

Right-<strong>of</strong>-Way:<br />

Kurt Harms, 405-521-2661, kharms@odot.org<br />

Diana Barlow, 405-521-2648, dbarlow@odot.org<br />

Utilities: Marvin Bright, 405-521-2641, mbright@odot.org<br />

Project<br />

Management:<br />

Kevin Bryan, 405-522-7605, kbryan@odot.org<br />

Division 3: Paul Rachel, 580-332-1526, prachel@odot.org<br />

Ron Brown, 580-332-1526, rbrown@odot.org<br />

Bruce Jeffcoat, 580-332-1526, bjeffcoat@odot.org<br />

Engineering:<br />

<strong>Environmental</strong>:<br />

BENHAM<br />

Ron Weltzheimer, 405-478-5353, ronald.weltzheimer@benham.com<br />

Duane Kranz, 405-478-5353, duane.kranz@benham.com<br />

Diane Abernathy, 405-701-3167, diane.abernathy@benham.com<br />

Terry McFall, 405-794-3531, 405-361-3531, tgm40@sbcglobal.net<br />

Renee’ Ellis, 918-492-1600, x398, renee.fleshman@benham.com,<br />

renee.ellis@benham.com<br />

Traffic: Ken Morris, 405-478-5353, ken.morris@benham.com<br />

Aruna Mathuranayagam, 405-478-5353,<br />

aruna.mathuranayagam@benham.com


I-35 <strong>South</strong> <strong>Environmental</strong> <strong>Assessment</strong><br />

Proposed Improvements<br />

• Expand I-35 to 6 Lanes North <strong>of</strong> Canadian River Bridge<br />

• Reconstruct SH 9E, Lindsey, & Main Interchanges


I-35 <strong>South</strong> <strong>Environmental</strong> <strong>Assessment</strong><br />

Project Purpose & Need<br />

• Increase Safety<br />

• Provide Additional<br />

Capacity<br />

• Implement OCART<br />

Study<br />

Recommendations


I-35 <strong>South</strong> <strong>Environmental</strong> <strong>Assessment</strong><br />

Study Area


I-35 <strong>South</strong> <strong>Environmental</strong> <strong>Assessment</strong><br />

The Roadway Improvement Process<br />

• Establish Project within ODOT<br />

• Complete <strong>Environmental</strong> Process<br />

• Design Project<br />

• Acquire Right-<strong>of</strong>-Way<br />

• Relocate Utilities<br />

• Construct Project


I-35 <strong>South</strong> <strong>Environmental</strong> <strong>Assessment</strong><br />

NEPA Process<br />

• National <strong>Environmental</strong> Policy Act<br />

• Decision Making Process<br />

Wetlands<br />

Community<br />

Impacts<br />

Endangered<br />

Species<br />

Safety<br />

All Applicable<br />

Federal Laws<br />

Flexible<br />

Design<br />

State & Local<br />

Law<br />

NEPA<br />

Process<br />

Air Quality<br />

Parklands<br />

Historic<br />

Transportation<br />

Enhancements<br />

Traditional<br />

Cultural<br />

Properties<br />

<strong>Environmental</strong><br />

Justice


I-35 <strong>South</strong> <strong>Environmental</strong> <strong>Assessment</strong><br />

NEPA Process<br />

• Minimize Social, <strong>Environmental</strong>, & Economic<br />

Impacts <strong>of</strong> the Project<br />

• Solicit Input from Federal, Tribal, State, Local<br />

Agencies, & Public<br />

• Collect <strong>Environmental</strong> Data<br />

• Estimate Construction, Right-<strong>of</strong>-Way, & Utility<br />

Costs<br />

• Evaluate Data & Costs to Select Preferred<br />

Improvements


I-35 <strong>South</strong> <strong>Environmental</strong> <strong>Assessment</strong><br />

• Project Status Update<br />

– Key Comments from 2 nd Public Meeting<br />

• Keep All Lindsey Street Ramps<br />

Meeting<br />

Purpose<br />

• Complete Noise Wall Prior to Construction<br />

• Aesthetic Enhancements<br />

• Impacts to New Auto Dealership<br />

• Consider Existing Stormwater Drainage Problems<br />

• SH 9 Connection to Ed Noble Parkway<br />

• 24 th Avenue Overpass (EB SH 9)<br />

• Compatible with One Way Frontage Roads & Texas<br />

Turnaround


I-35 <strong>South</strong> <strong>Environmental</strong> <strong>Assessment</strong><br />

• Project Status Update<br />

– Key Comments from 2 nd Public Meeting<br />

• Keep All Lindsey Street Ramps<br />

Meeting<br />

Purpose<br />

• Complete Noise Wall Prior to Construction<br />

• Aesthetic Enhancements<br />

• Impacts to New Auto Dealership<br />

• Consider Existing Stormwater Drainage Problems<br />

• SH 9 Connection to Ed Noble Parkway<br />

• 24 th Avenue Overpass (EB SH 9)<br />

• Compatible with One Way Frontage Roads & Texas<br />

Turnaround<br />

• Pedestrian & Bicycle Crossing


I-35 <strong>South</strong> <strong>Environmental</strong> <strong>Assessment</strong><br />

Norman Bicycle<br />

Master Plan


I-35 <strong>South</strong> <strong>Environmental</strong> <strong>Assessment</strong><br />

• Project Status Update<br />

– Key Comments from 2 nd Public Meeting<br />

• Keep All Lindsey Street Ramps<br />

• Complete Noise Wall Prior to Construction<br />

Meeting<br />

Purpose<br />

• Aesthetic Enhancements<br />

• Impacts to New Auto Dealership<br />

• Consider Existing Stormwater Drainage Problems<br />

• SH 9 Connection to Ed Noble Parkway<br />

• 24 th Avenue Overpass (EB SH 9)<br />

• Compatible with One Way Frontage Roads & Texas<br />

Turnaround<br />

• Pedestrian & Bicycle Crossing<br />

• Fixed Guideway Study


I-35 <strong>South</strong> <strong>Environmental</strong> <strong>Assessment</strong><br />

Meeting<br />

Purpose<br />

COTPA Fixed Guideway Study


I-35 <strong>South</strong> <strong>Environmental</strong> <strong>Assessment</strong><br />

Interchange Alternatives


Existing I-35<br />

SH 9 to Main Street<br />

(NO BUILD)


LOS = C/F<br />

LOS = D/E


LOS = C/F<br />

LOS = D/E


LOS = C/F<br />

LOS = D/E


LOS = C/F<br />

LOS = D/E


(SPUI)


• Provide continuous sidewalks<br />

• Break up crossings into several small steps<br />

• Use good geometry to improve sight distance<br />

• Provide adequate advance warning devices at pedestrian<br />

crosswalk locations with day time and night time visibility<br />

properties including, but not limited to warning signs with<br />

flashers<br />

• LED crosswalk flashing lights operated with push button, etc.<br />

• Likely to take more than one signal cycle to cross entire SPUI<br />

SPUI – Pedestrian<br />

Crossing Features


I-35 <strong>South</strong> <strong>Environmental</strong> <strong>Assessment</strong><br />

Public Participation Opportunities<br />

• 1 st Public Meeting September 24, 2007<br />

• 2 nd Public Meeting September 18, 2008<br />

• 3 rd Public Meeting February 26, 2009<br />

• Public Hearing Summer/Fall 2009


I-35 <strong>South</strong> <strong>Environmental</strong> <strong>Assessment</strong><br />

Information Sources<br />

• Web Address:<br />

http://www.okladot.state.ok.us/meetings/index.htm<br />

• Scott Stegmann – ODOT<br />

Phone: 405.522.8014<br />

200 NE 21st Street<br />

<strong>Oklahoma</strong> City, OK 73105<br />

E-mail: sstegmann@ODOT.org<br />

• Diane Abernathy – Benham<br />

Phone: 405.701.3167<br />

3700 W. Robinson, Ste. 200<br />

Norman, OK 73072<br />

E-mail: diane.abernathy@benham.com


Questions<br />

&<br />

Answers<br />

Thank you!

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!