02.05.2014 Views

Accreditation and Designation User Manual - OECI

Accreditation and Designation User Manual - OECI

Accreditation and Designation User Manual - OECI

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Final check<br />

Executor: <strong>OECI</strong> Chair audit team<br />

− If the A&D Committee changes major parts in the report, the report will be sent back to the chair of the<br />

audit team,<br />

− The chair will have the opportunity to check the report,<br />

− If the chair of the audit team agrees with the major changes of the A&D Committee the draft final report<br />

will be sent to the A&D Board for approval.<br />

Approval final report<br />

Executor: <strong>OECI</strong> A&D Board<br />

In week 14 after the peer review the <strong>OECI</strong> A&D Board will have a teleconference to approve the final report<br />

including the strengths, opportunities <strong>and</strong> conclusions.<br />

Send final report to Cancer institute<br />

Executor: Chair A&D Group<br />

Within 14 to 16 weeks after the peer review the cancer institute will receive:<br />

− A letter to present the final report,<br />

− The final report including the final designation,<br />

− An explanation of the minimum criteria of an improvement action plan.<br />

Owner: <strong>OECI</strong> Organisation of European Cancer Institutes<br />

Status: Revised - 24 th January 2011 - A&D Working Group<br />

Approved by: <strong>OECI</strong> <strong>Accreditation</strong> <strong>and</strong> <strong>Designation</strong> Board<br />

Chapter 5 Ten steps A&D process in detail<br />

Page 23 of 28<br />

Version 16 February 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!