Final check<br />
Executor: <strong>OECI</strong> Chair audit team<br />
− If the A&D Committee changes major parts in the report, the report will be sent back to the chair of the<br />
audit team,<br />
− The chair will have the opportunity to check the report,<br />
− If the chair of the audit team agrees with the major changes of the A&D Committee the draft final report<br />
will be sent to the A&D Board for approval.<br />
Approval final report<br />
Executor: <strong>OECI</strong> A&D Board<br />
In week 14 after the peer review the <strong>OECI</strong> A&D Board will have a teleconference to approve the final report<br />
including the strengths, opportunities <strong>and</strong> conclusions.<br />
Send final report to Cancer institute<br />
Executor: Chair A&D Group<br />
Within 14 to 16 weeks after the peer review the cancer institute will receive:<br />
− A letter to present the final report,<br />
− The final report including the final designation,<br />
− An explanation of the minimum criteria of an improvement action plan.<br />
Owner: <strong>OECI</strong> Organisation of European Cancer Institutes<br />
Status: Revised - 24 th January 2011 - A&D Working Group<br />
Approved by: <strong>OECI</strong> <strong>Accreditation</strong> <strong>and</strong> <strong>Designation</strong> Board<br />
Chapter 5 Ten steps A&D process in detail<br />
Page 23 of 28<br />
Version 16 February 2011