02.05.2014 Views

Accreditation and Designation User Manual - OECI

Accreditation and Designation User Manual - OECI

Accreditation and Designation User Manual - OECI

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Preparation of the auditors’ team meeting<br />

Executor: <strong>OECI</strong> Auditor<br />

The individual preparation of the auditors’ team meeting includes:<br />

− Analysing the self-assesment reports of the cancer institute:<br />

• quantitative report including: scores, notes <strong>and</strong> improvement points,<br />

• quantitative report,<br />

− Analysing the documents the cancer institute has attached to the e-tool,<br />

− Formulation of main topics for the peer review visit,<br />

− <strong>Designation</strong> checklist (doc 34).<br />

Booking the hotel for the auditors’ meeting<br />

Executor: <strong>OECI</strong> Secretary<br />

The <strong>OECI</strong> secretary will book the hotel for the auditors for the auditors’ meeting <strong>and</strong> for the peer review visit.<br />

Complete peer review agenda<br />

Executor: Cancer institute<br />

While the audit team is getting ready for the auditors’ meeting, the institute will prepare <strong>and</strong> complete<br />

the peer review visit agenda. The concept agenda will be approved by the auditors’ chair during the selfassessment<br />

period.<br />

The concept agenda has to be completed by the cancer institute. The auditors will have interviews with<br />

employees of the cancer institute. The institute has to plan the persons from the requested departments <strong>and</strong><br />

the location/room where the interviews will take place.<br />

Completion deadline: 1 week before the auditors’ preparation meeting.<br />

Sending the agenda<br />

Executor: <strong>OECI</strong> A&D Coordinator<br />

The agenda of the preparation meeting will be sent one week before the meeting <strong>and</strong> will include the concept<br />

peer review agenda.<br />

Owner: <strong>OECI</strong> Organisation of European Cancer Institutes<br />

Status: Revised - 24 th January 2011 - A&D Working Group<br />

Approved by: <strong>OECI</strong> <strong>Accreditation</strong> <strong>and</strong> <strong>Designation</strong> Board<br />

Chapter 5 Ten steps A&D process in detail<br />

Page 16 of 28<br />

Version 16 February 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!