Cycle network and route planning guide - NZ Transport Agency
Cycle network and route planning guide - NZ Transport Agency
Cycle network and route planning guide - NZ Transport Agency
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
12 IMPLEMENTATION<br />
IMPLEMENT CYCLE NETWORK DEVELOPMENT<br />
Allocate funding for detailed investigation, design <strong>and</strong> construction/implementation.<br />
Detailed investigation <strong>and</strong> design of individual cycle projects.<br />
Audit of individual cycle projects.<br />
Physical works.<br />
Maintenance.<br />
12.1 Introduction<br />
This section discusses implementing an agreed plan to improve cycle infrastructure in an area.<br />
12.2 Integration<br />
<strong>Cycle</strong> <strong>network</strong> <strong>planning</strong> needs to be integrated<br />
with mainstream transportation <strong>planning</strong><br />
<strong>and</strong> policy. If not, conflicting policies <strong>and</strong><br />
infrastructure provision can undermine its<br />
potential to achieve its objectives — for<br />
example, measures that increase the volume<br />
<strong>and</strong> speed of traffic with which cyclists have<br />
to mix.<br />
Providing for cyclists’ needs should be the<br />
responsibility of all departments or divisions<br />
of a local authority or road controlling<br />
authority, whether or not they have a cycling<br />
officer or unit.<br />
This is because their decisions <strong>and</strong> activities<br />
have the potential to either help or hinder the<br />
satisfaction of cyclists’ needs. The task is too<br />
big to be the sole responsibility of one person<br />
or small specialist unit.<br />
OPPORTUNITIES FOR IMPROVING PROVISIONS FOR CYCLISTS<br />
Road marking after resealing.<br />
Carriageway adjustments with kerb <strong>and</strong> channel replacement.<br />
Shoulder widening as part of edge-break repairs or drainage improvements.<br />
Railway, motorway <strong>and</strong> pipeline corridors.<br />
Conservation l<strong>and</strong>.<br />
Using strategic properties that come up for sale for off-road facilities.<br />
Co-ordinating with projects carried out by adjacent local authorities <strong>and</strong> Transit New Zeal<strong>and</strong>.<br />
Arterial road traffic management — parking restrictions <strong>and</strong> crossing facilities.<br />
Safety improvement works <strong>and</strong> intersection changes.<br />
Traffic signal upgrades — cycle-friendly detectors, signals <strong>and</strong> phasing, <strong>and</strong> lane arrangements.<br />
Bus priority schemes — bus-bike lanes, head start signals.<br />
Bridge replacement or widening.<br />
Local area traffic management schemes, including contra-flow lanes.<br />
Safer Routes to Schools projects <strong>and</strong> school travel plans.<br />
Improvements for pedestrians, such as barrier removal, crossings <strong>and</strong> footpath widening<br />
— include wider, shared paths.<br />
Urban renewal projects.<br />
Parks <strong>and</strong> reserves redevelopments.<br />
Other developments by the local authority <strong>and</strong> others.<br />
Table 12.1: Opportunities for improving<br />
provisions for cyclists<br />
Source: Fundamentals of <strong>planning</strong> <strong>and</strong><br />
design for cycling: Course notes: Version 01<br />
(Transfund, New Zeal<strong>and</strong>, 2003, p.55)<br />
Riverfront <strong>and</strong> waterfront developments.<br />
New subdivisions, including paths <strong>and</strong> links.<br />
New commercial developments or redevelopments.<br />
72