11 PRIORITISATION<br />
PRIORITISE CYCLE ROUTE DEVELOPMENT<br />
Prepare a programme of projects for detailed investigation, design <strong>and</strong> implementation.<br />
11.1 Introduction<br />
Prioritising cycle <strong>route</strong> <strong>network</strong> implementation is more an<br />
art than a science.<br />
This chapter discusses possible criteria for the order in which<br />
the <strong>network</strong> will be developed:<br />
• LOS/cycle review.<br />
• Existing usage numbers.<br />
• Crash records.<br />
• Blockage removal.<br />
• Demonstrable achievement.<br />
• Area consolidation.<br />
• Quality demonstration projects.<br />
11.2 Level of service/cycle review<br />
Description<br />
Priority could be assigned to treating sections of <strong>route</strong>s that have the worst LOS, or to<br />
projects which provide the most LOS improvement.<br />
See section 9.5.<br />
Advantages<br />
See section 9.5.<br />
Disadvantages<br />
See section 9.5.<br />
The approach does not take dem<strong>and</strong> or<br />
cost into account, although this could<br />
be overcome, for example, by assessing<br />
the cost per LOS improvement per<br />
number of cyclists who will benefit.<br />