County: Sandoval<br />

Jemez Springs DWCA<br />

CPB No: RIP 2012-05<br />

Funding:<br />

Project Amount<br />

RIP Loans<br />

$340,000.00<br />

CPB Manager: DuBois, Stephanie Grant Amount: $0.00<br />

Population Served by This Project 1,260 Loan Amount: $340,000.00<br />

Project Phase: Construction Fund Balance: $340,000.00<br />

Problem: The Jemez Springs DWA serves the population of the Village of Jemez Springs. One of the<br />

springs that supplies water to the community is Gallagher Springs. This spring has been tested to<br />

have elevated levels of arsenic with an average concentration of 30 ppb. The water supply from<br />

this spring is needed for the growing community. However, the concentrations of arsenic are<br />

approximately three times the MCL regulated by EPA which have led to compliance issues with<br />

EPA and could also lead to potential health problems of the consumers.<br />

Solution: Plan, design and construct an Arsenic Treatment System for one of the springs (Gallagher<br />

Springs) that supplies the Jemez Springs Domestic Water Association.<br />

Project: Arsenic Treatment System<br />

This project is for the construction of an Arsenic Treatment System for the Gallagher Spring. The Treatment System<br />

will be a pre-engineered water treatment equipment package capable of treating a 30 gpm raw water inflow utilizing<br />

coagulation and filtration technology that includes an integral backwash water recycling and sludge dewatering<br />

process that will allow for direct disposal at a permitted solid waste facility. 5-8-12 Bid tab approved. 6-<br />

29-12 Notice to proceed issued. As of 12-5-12 construction is approximately 60% complete.<br />

County: Sandoval<br />

Jemez Springs, Village of<br />

CPB No: 2708-PG<br />

Funding:<br />

Project Amount<br />

NMFA-PG<br />

$37,500.00<br />

CPB Manager: DuBois, Stephanie Grant Amount: $37,500.00<br />

Population Served by This Project 1,000 Loan Amount: $0.00<br />

Project Phase:<br />

Problem:<br />

Solution:<br />

Project:<br />

Planning Phase<br />

WWTP has issues with existing plant functionality<br />

Upgrade WWTP<br />

Wastewater Treatment Plant Upgrades<br />

Fund Balance: $37,500.00<br />

$37,500 to complete a preliminary engineering report (PER) to outline alternatives for upgrading the existing<br />

wastewater treatment plant (WWTP). 10-15-12 CPB commented on PER.<br />

County: Sandoval<br />

Rio Rancho, City of<br />

CPB No: 163-WTB<br />

Funding:<br />

Project Amount<br />

WTB<br />

$1,950,000.00<br />

CPB Manager: DuBois, Stephanie Grant Amount: $1,950,000.00<br />

Population Served by This Project 87,000 Loan Amount: $0.00<br />

Project Phase:<br />

Problem:<br />

Solution:<br />

Project:<br />

Construction<br />

lack of available groundwater<br />

develop infrastructure for reinjecting effluent into the groundwater table<br />

Water Conservation, Treatment, Recycling and Reuse<br />

Fund Balance: $1,950,000.00<br />

$1,950,000 for advanced water treatment facility. 4-18-12 CPB approved plans/specfications for bid. 5-23-12 CPB<br />

approved bid tabulation awarding construction contract to RMCI, $1,856,710 (excludes tax). 6-20-12 preconstruction<br />

meeting held. 7-9-12 Notice to proceed issued. NMFA MOU expired June 30, 2012. No activity by<br />

CPB pending new MOU.<br />