28.04.2014 Views

A OPEN PIT MINING AÇIK OCAK MADENCİLİĞİ

A OPEN PIT MINING AÇIK OCAK MADENCİLİĞİ

A OPEN PIT MINING AÇIK OCAK MADENCİLİĞİ

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

to select the proper haulage system in<br />

Sarcheshmeh copper mine of Iran, some<br />

other factors apart from technical and<br />

economic factors, by taking into account the<br />

SD concept were considered and the<br />

selection was done by using hierarchical<br />

preference voting system (HPVS) method.<br />

This PVS uses a DEA model to produce<br />

weights associated with each ranking place.<br />

One of the main advantage of PVS method,<br />

is to remove the uncertainty in comparisons,<br />

in addition, regarding to application of a<br />

mathematical model, outcomes are more<br />

reliable.<br />

The result of this study shows that, the<br />

combination of truck-shovel and in-pit<br />

crusher with score 2.048 has higher priority<br />

compared to other alternatives such as truckshovel<br />

and shovel and mobile in-pit crusher<br />

as a proper haulage system for Sarcheshmeh<br />

copper mine.<br />

REFERENCES<br />

Aghajani A., Osanloo M., 2007 – Application of<br />

AHP-TOPSIS Method for Loading-Haulage<br />

Equipment Selection in Open pit Mines. XXVII<br />

International Mining Convention, Mexico<br />

Aghajani A., Osanloo M., Soltanmohammadi H.,<br />

2008 – Loading-haulage equipment selection in<br />

open pit mines based on fuzzy-TOPSIS method.<br />

In Proc. 17 th International conference on mine<br />

planning and equipment selection, China, p 87-<br />

102<br />

Aghajani A., Osanloo M., Karimi B., 2009 –<br />

Overburden removal equipment selection through<br />

MADM methods: application of modified<br />

VIKOR method. In Proc. 18 th International<br />

conference on mine planning and equipment<br />

selection, Canada, p 134-141<br />

Aghajani A., Osanloo M., Karimi B., 2010 – A Non-<br />

Linear Programming Model for Open Pit Mine<br />

Equipment Selection. . In Proc. 19 th International<br />

conference on mine planning and equipment<br />

selection, Australia, p 303-316<br />

Bandopadhyay S., Venkatasubramanian P., 1987 –<br />

Expert systems as decision aid in surface mine<br />

equipment selection. International Journal of<br />

Mining, Reclamation and Environment Vol. 1, p<br />

159–165.<br />

Bascetin A., 2004 – An application of the analytic<br />

hierarchy process in equipment selection at<br />

Orhaneliopen pit coal mine. Mining Technology<br />

(Trans. Inst. Min. Metal. A), Vol. 113, p 192-199<br />

Blanchard B.S., Fabrycky W.J., 1981 – Systems<br />

engineering and analysis. 2 nd edition (Englewood<br />

Cliffs, N.J: Prentice-Hall, Inc), p 491–524.<br />

Bascetin A., Oztas A., Kanli A., 2006 – EQS:<br />

computer software using fuzzy logic for<br />

equipment selection in mining engineering. The<br />

Journal of the South African Institute of Mining<br />

and Metallurgy Vol. 106, p 63–70.<br />

Cebesoy T., 1997 – Surface mining equipment cost<br />

analysis with a developed linear break even<br />

model. International Journal of Mining,<br />

Reclamation and Environment Vol. 11, p 53–58<br />

Celebi N., 1998 – An equipment selection and cost<br />

analysis system for open pit coal mines.<br />

International Journal of Mining, Reclamation and<br />

Environment Vol. 12, p 181–187<br />

Cook W.D., Kress M., 1990 – A data envelopment<br />

model for aggregation preference ranking. Manag.<br />

Sci. 36, p 1302-1310.<br />

Denby B., Schofield D., 1990 – Application of<br />

expert systems in equipment selection for surface<br />

design. International Journal of Mining,<br />

Reclamation and Environment Vol. 4, p 165–171<br />

Green R.H., Doyle J.R., Cook W.D., 1996 –<br />

Preference voting and project ranking using DEA<br />

and cross-evaluation. Eur. J. Oper. Res. Vol. 90, p<br />

461-472.<br />

Gregory, B S, 2003 – Excavator selection, in<br />

Proceedings 12 th International Symposium on<br />

Mine Planning and Equipment Selection, p 395-<br />

404<br />

Hall R., Daneshmand K., 2003 – Reliability<br />

Modelling of Surface Mining Equipment: Data<br />

Gathering and Analysis Methodologies.<br />

International Journal of Mining, Reclamation and<br />

Environment Vol. 17, p 139–155<br />

Hartman H.L., 1992 – SME Mining Engineering<br />

Handbook, 2 nd Edition., p 1343-1351<br />

Hilson G., Murck B., 2000 – Sustainable<br />

development in the mining industry: clarifying the<br />

corporate perspective. Resources Policy Vol. 26,<br />

p 227-238<br />

Hoppe R. W., 1977 – Open-pit mining in Arizona.<br />

Engineering and Mining Journal. Vol. 178, No. 6.<br />

p 95-106<br />

Hrebar M.J., 1990 – Preliminary dragline selection<br />

for surface coal mining operation. In Proc. 2 nd<br />

International conference on mine planning and<br />

equipment selection, Canada, p 133–43.<br />

Jacek M., Zaplicki C., 2009., Shovel-Truck systems,<br />

CRC press, UK., p 2-6<br />

Koehler F., 2003. In-Pit Crushing System the Future<br />

Mining Option., in Proceedings 12 th International<br />

Symposium on Mine Planning and Equipment<br />

Selection, p 371-376<br />

Laurence D., 2011 – Establishing a sustainable<br />

mining operation: an overview., Journal of<br />

Cleaner Production, Vol. 19., p 278-284<br />

138

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!