28.04.2014 Views

A OPEN PIT MINING AÇIK OCAK MADENCİLİĞİ

A OPEN PIT MINING AÇIK OCAK MADENCİLİĞİ

A OPEN PIT MINING AÇIK OCAK MADENCİLİĞİ

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Huttagosol, P., & Cameron, R., 1992. A computer<br />

design of ultimate pit limit by using<br />

transportation algorithm, Proc. 23th Int. APCOM,<br />

pp.443-460.<br />

Huy, P. N. A., San, C. T. B., &Triantaphyllou, E.,<br />

2004. Solving integer programming problems<br />

using a genetic algorithm approach, Proceedings<br />

of ICEIC, Ha Noi, Viet Nam, 5 pages.<br />

Johnson, T. B., 1968. Optimum open pit mine<br />

production scheduling, PhD thesis, Operations<br />

research department, Uni. of California, Berkeley,<br />

C.A.<br />

Johnson, T. B., & Sharp, W. R., 1971.A 3-D<br />

dynamic programming method for optimal<br />

ultimate open pit design, U.S. Bureau of Mines,<br />

Report of investigation 7553.<br />

Kim, Y. C., 1979. Open pit limits analysis: technical<br />

overview, Computer methods for the 80's in the<br />

mineral industry, A. Weiss (ed.), AIME, New<br />

York, pp.297-303.<br />

Koenigsberg, E., 1982. The optimum contours of an<br />

open pit mine: an application of dynamic<br />

programming, Proc. 17th Int. APCOM, pp. 274-<br />

287.<br />

Lerchs, H., & Grossmann, I., 1965. Optimum design<br />

of open-pit mines, Canadian Mining and<br />

Metallurgical Bulletin, 58, pp. 17–24.<br />

Meagher, C., Sabour, S. A. A., & Dimitrakopoulos,<br />

R., 2009. Pushback design of open pit mines<br />

under geological and market uncertainties, Proc.<br />

of Orebody Modelling and Strategic Mine<br />

Planning, Spectrum Series, pp.16 - 18.<br />

Meyer, M., 1969.Applying linear programming to<br />

the design of ultimate pit limits, Management<br />

Science, vol. 16, pp.B121- B135.<br />

Mol, O., &Gillies,S.,1984. Cutoff grade<br />

determination of mines producing direct shipping<br />

iron ore, Proc. of Australasian Institute of Mining<br />

and Metallurgy, No. 289, November/December<br />

1984, pp.283-287.<br />

Muir, D. C. W., 2004. Pseudoflow, new life for<br />

Lerchs-Grossmann pit optimisation, Proc. of<br />

Orebody Modelling and Strategic Mine Planning,<br />

pp.113-120.<br />

Newman, A. M., Rubio, E., & Caro, R., Weintraub,<br />

A., &Eurek, K., 2010. A review of operations<br />

research in mine planning, Interfaces, 40(3),<br />

pp.222-245.<br />

Olivetti, F. F., 2003. Solving integer programming<br />

problems using genetic algorithms, website<br />

http://ai-repot.com/Articles/48/Programming.html<br />

Osanloo, M., Rahmanpour, M., & Sadri, A. 2010.<br />

Ultimate pit limit of iron ore mines using<br />

maximum flow algorithms, Proc. MPES 2010,<br />

FREMANTLE: AusIMM, pp.81-87.<br />

Rahmanpour, M., & Osanloo, M., 2012. Pit limit<br />

determination considering blending requirements.<br />

Proc. of 21st International Symposium on Mine<br />

Planning & Equipment Selection (MPES), New<br />

Delhi, India, pp.564-572.<br />

Picard, J. C., 1976. Maximal closure of a graph and<br />

application to combinatorial problems,<br />

Management Science, 22, pp.1268-1272.<br />

Qin, A. K., Huang, V. L., &Suganthan, P. N., 2009,<br />

Differential evolution algorithm with strategy<br />

adaption for global numerical optimization, IEEE<br />

transactions on evolutionary computation, Vol.<br />

13, No. 6, pp. 398-417.<br />

Srinivasan, S., & Whittle, D., 1996. Combined pit<br />

and blend optimization, SME Annual Meeting,<br />

Phoenix, Arizona, March 11-14, Preprint 96-69, 5<br />

pages.<br />

Storn, R., & Price, K., 1997. Differential evolution-<br />

<br />

optimization over continuous spaces, J. Global<br />

Optimiz., vol. 11, pp.341–359.<br />

Underwood, R., &Tolwinski, B., 1998. A<br />

mathematical programming viewpoint for solving<br />

the ultimate pit problem, European J. of<br />

Operational Research, 107, pp.96-107.<br />

Whittle, D., &Bozorgebrahimi, A., 2004. Hybrid<br />

Pits - linking conditional simulation and Lerchs-<br />

Grossmann through set theory, Proc. of Orebody<br />

Modelling and Strategic Mine Planning,<br />

Spectrum Series Vol. 14, pp.323-328.<br />

Yegulalp, T. M., & Arias, A. J., 1992.A fast<br />

algorithm to solve the ultimate pit limit problem,<br />

Proc. 23th Int. APCOM, pp.391-397.<br />

Zhao, Y., & Kim, Y. C., 1992.A new optimum pit<br />

limit design algorithm, Proc. 23th Int. APCOM,<br />

pp.423-434.<br />

128

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!