28.04.2014 Views

A OPEN PIT MINING AÇIK OCAK MADENCİLİĞİ

A OPEN PIT MINING AÇIK OCAK MADENCİLİĞİ

A OPEN PIT MINING AÇIK OCAK MADENCİLİĞİ

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 7. UPL5<br />

3 CONCLUSION<br />

Sustainable development is consisted of<br />

three major issues including Economic,<br />

Environmental, and Social issues.<br />

Determination of UPL with the highest<br />

profit, may not coincide with sustainable<br />

development issues. Therefore, in this paper<br />

a procedure is introduced to determine a pit<br />

limit for open pit mines that meets all<br />

sustainable development issues. The<br />

procedure is tested on a 2D block model and<br />

the result shows that this approach is quite<br />

applicable to determine the UPL of open pit<br />

mines considering the sustainable<br />

development issues.<br />

REFERENCES<br />

Ataee-pour ,M.; Rahmanpour, M.; Adibee, N.; 2012,<br />

Ultimate pit limit optimization with simultaneous<br />

maxizimation of profit and ore content, 4 th Iranian<br />

mining conference, Tehran, Iran<br />

Burgher, E., K.; Erickson, E.; 1984, “The optimization of<br />

coal mine production schedules using linear<br />

programming: an example that determines the effects<br />

of reclamation costs and interest rates”, Mining<br />

Science and Technology, 2 (1984), pp. 69-78<br />

Craynon, J.; Karmis, M.; 2011, Optimizing coal<br />

mine design for sustainable development at large<br />

surface coal mining operations in Appalachia, In:<br />

Aachen international mining symposia;<br />

Sustainable development in the mineral industry<br />

(SDIMI), Germany<br />

Coccetta, L.; Kelset, P., J.; 1997, Models for mine<br />

site rehabilitation, International conference on<br />

modeles and simulation, pp.2155-2160<br />

Dogan, T.; Bascetin, A; Sertabipoglu, Z.; 2009, The<br />

Effects of Changing Block Size on Ore Quality<br />

Control and Environmental Impacts, Proceedings<br />

of the Eighteenth International Symposium on<br />

Mine Planning and Equipment Selection (MPES<br />

2009), Alberta, Canada<br />

Gholamnejad, J.; 2009, Incorporation of<br />

rehabilitation cost intothe optimum cut-off grade<br />

determination, The Journal of The Southern<br />

African Institute of Mining and Metallurgy,<br />

Volume 108, pp.89-94<br />

Gholamnejad, J.; Mojahedfar, A.R.; 2010,<br />

Determination of the largest pit with the nonnegative<br />

net profit in the open pit mines, Journal<br />

of Mining & Environment, Vol.1, No.2, PP.45-52<br />

Hilson, G.; 2000 , Sustainable Development Policies<br />

in Canada’s Mining Sector: An Overview of<br />

Government and Industry Efforts, Environmental<br />

Science & Policy 3 (2000) 201–211<br />

King, B.,M.;1998, Impact of Rehabilitation and<br />

Closure costs on Production Rate and Cut-off<br />

Grade Strategy, application of computers and<br />

operations research in the mineral industry<br />

(APCOM), 13 pages, London, UK<br />

Rashidinejad, F.; Osanloo, M.; Rezai, B.; 2008a, An<br />

environmental oriented model for optimum cut-off<br />

grades in open pit mining projects to minimize<br />

acid mine drainage, Int. J. Environ. Sci. Tech., 5<br />

(2), pp.183-194<br />

Rashidinejad, F.; Osanloo, M.; Rezai, B.; 2008b,<br />

Cutoff Grades Optimization with Environmental<br />

Management; a Case Study: Sungun Copper<br />

Project, IUST International Journal of<br />

Engineering Science, Vol. 19, No.5-1, 2008, pp.<br />

1-13<br />

United Nations, 1987. Report of the World<br />

Commission on Environment and Development:<br />

Our Common Future. Available at:<br />

http://www.un-documents. net<br />

110

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!