<strong>Edmondson</strong> <strong>Park</strong> <strong>South</strong> DCP <strong>2012</strong> November <strong>2012</strong><br />

4.0 Environmental Management<br />

4.1 Riparian Corridors and Water Cycle Management<br />

Stormwater quantity and quality management seeks to reduce the impact of rapid stormwater conveyance on<br />

streams and wetlands, remove pollutants to improve water quality, retain habitats, conserve water, integrate<br />

landscape and recreational opportunities and protect downstream development from inundation. Water<br />

quality detention / bio-retention basins will be an integral part of stormwater management.<br />

Objectives<br />

1. To provide for sustainable urban stormwater management with flood detention basins and water quality<br />

treatment as part of the landscape and water systems.<br />

2. To manage, protect and enhance ecosystems and their biodiversity, soil stability, fauna and aquatic<br />

habitats in natural streams and corridors.<br />

3. To promote development, compatible with stormwater risk and public safety that encourage active and<br />

passive recreation, social, cultural and interpretation opportunities with the corridors.<br />

4. To develop a maintenance strategy that aligns with Council's existing maintenance regime.<br />

<strong>Control</strong>s<br />

1. Riparian Corridors are to be provided in accordance with Figures 21 - 22, Table 8 below and the relevant<br />

parts of the <strong>Edmondson</strong> <strong>Park</strong> <strong>South</strong> Water Cycle Management <strong>Plan</strong>, September 2010, prepared by J.<br />

Wyndam Prince.<br />

2. All remnant vegetation along the CRZ must be protected and enhanced unless required to be removed as<br />

part of the re-engineering works to improve the system.<br />

3. Any bank stabilisation measures are to use soft engineering techniques that promote sustainability and<br />

naturalness, except for the Maxwell's Creek Urban <strong>Park</strong> / corridor.<br />

4. <strong>Development</strong>, other than low impact recreational facilities and detention basins, is to be excluded from<br />

the CRZ. Recreational facilities include pathways, picnic shelters, seating, educational and interpretative<br />

features. Special attention is to be given to the location and type of facility in the core riparian corridor to<br />

minimise impact on existing vegetation and the ecological integrity.<br />

5. The riparian corridors are to be designed so as to:<br />

a) retain aquatic connectivity through use of crossing structures consistent with the NSW Department<br />

of Primary Industries – Fisheries guidelines,<br />

b) provide access to the water course at locations where the ecological integrity of the existing riparian<br />

vegetation and stream bed and bank stability will not be significantly compromised,<br />

c) provide educational and interpretative features and information in riparian corridors at key locations,<br />

d) be bounded by perimeter streets, and<br />

e) accommodate service utilities only if no other practical or feasible opportunity exists to cross the<br />

corridor at designated crossing points, such as streets and pedestrian crossings.<br />

6. All development is to implement and be consistent with the water cycle strategies outlined in the<br />

<strong>Edmondson</strong> <strong>Park</strong> <strong>South</strong> Water Cycle Management <strong>Plan</strong>, September 2010, prepared by J. Wyndam<br />

Prince. This includes:<br />

a) on lot treatments (i.e. water wise landscaping, reticulated recycled water etc),<br />

b) street level treatments (i.e. gross pollutant traps), and<br />

c) precinct treatments (i.e. rain gardens, detention basins as shown as Figure 22).<br />

7. Habitable floor levels are to be located above the 100 year ARI floor level plus 500mm freeboard and that<br />

appropriate flood evacuation can be provided for dwellings located below the probable maximum flood<br />

level.<br />