Watson & Associates Economists Ltd. 3.<br />

<br />

Review with <strong>Municipality</strong> personnel prior to proceeding with rate determination. This discussion<br />

will address potential short to medium term impacts <strong>of</strong> utilizing alternative capital financing<br />

methods as a means <strong>of</strong> controlling rate levels.<br />

1.4 Operating Cost and Revenue Analysis (Task #4)<br />

Review and update operating costs and related annual cost components such as maintenance<br />

costs, testing, engineering/administration, reading/billing/collecting, etc. Break down into fixed and<br />

variable components.<br />

• From the future forecasts identified in Task #2, assess potential cost implications. Identify<br />

sensitivity impacts (fixed vs. variable cost factors) and cost drivers.<br />

• Provide discussion on reserve funds for various purposes (i.e. working fund, rate stabilization, life<br />

cycle, etc).<br />

1.5 Rate Calculations (Task #5)<br />

• Water and wastewater billings are currently calculated using a base charge (determined by meter<br />

size) and a consumption charge. Current 2012 rates are as follows:<br />

<strong>The</strong> water and wastewater rates will be updated using the rate structure (noted above) as<br />

implemented in the previous rate study. Also, other rate structures can be discussed with staff,<br />

as requested.<br />

1.6 Report Preparation (Task #6)<br />

<br />

<br />

<br />

Finalize the long term plans prepared as part <strong>of</strong> previous tasks for capital (existing system/future)<br />

and operating needs from a value engineering and/or long-term life cycle perspective.<br />

Prepare a capital/operating implementation plan from a technical and cost perspective.<br />

Provide the findings <strong>of</strong> the analysis in a letter report.<br />

214<br />

H:\PROPOSAL\<strong>Lambton</strong> <strong>Shores</strong>\2012 DC W&WW\W & WW\<strong>Lambton</strong> <strong>Shores</strong> 2012 WWW Proposal.doc